Guides you through enabling, configuring, and running an add-on on a plan file, including job scheduling, output import, and accessing generated reports to visualize and review changes.
This topic describes how to execute a selected add-on on a plan file to generate required outputs or reports.
Before you begin
-
Ensure the required add-on is available and enabled on the Manage Add-ons page.
-
You can enable a maximum of 15 add-ons for each user.
Procedure
| 1. | Enable the required add-on from the Manage Add-ons page.
The enabled add-on appears under the menu on the visualization toolbar in the Network Design page. |
|
| 2. | Select the enabled add-on from the menu on the Network Design page. |
|
| 3. | Enter the required input fields as defined by the add-on controls. |
|
| 4. | On the Run Settings page, enter a job name and schedule when to run the add-on. Optionally, set these options:
|
|
| 5. | Submit the job. The add-on runs at the scheduled time using the selected engine profile. You can track the job status on the Job Manager page (from the main menu, choose Job Manager). |
|
| 6. | Once the job completes, import the output plan file into user space to visualize it. For more information, refer to Access output plan files from job manager. |
|
| 7. | (Optional) Access the generated report to view the changes caused by the add-on.
|