Use this procedure to configure and run a CLI command to perform a remote cold reset of supported client optics for troubleshooting or management.
| Feature Name |
Release Information |
Description |
|---|---|---|
| Remote reset of client optics |
Cisco IOS XR Release 25.4.1 |
You can now remotely reset client optics using a new CLI command and Yang model. This feature allows you to perform cold reboots of optics to resolve issues caused by the host or the optics. Remote power cycling enables more flexible and programmable management of optics. This capability does not apply to CIM 8. Supported optics are:
CLI: The command Yang model: The new yang model |
This procedure enables remote power cycling of optics in response to issues arising from the host platform or the optics. It supports flexible and programmable management through CLI. This feature is supported on the 400GE, 4x100GE, ZR optics, including QDD-ZR, QDD-ZR+, 400G-ZR, and 400G Bright ZR+ optics.
Limitations:
-
Warm reloading is not supported.
-
CIM-8 pluggables are not supported.
Procedure
Enter the command reload transceiver optics R/S/I/P [cold] to reset the optics for a specific port. Example:
The default is a cold reset, regardless of whether you specify cold or not. |
The selected 400GE or 4x100GE optics module is reset remotely, performing a cold reboot as needed for troubleshooting or management.