Introduces the overall steps for installing and connecting the router, summarizing key installation phases, physical setup, and initial preparations required to begin system configuration.
This section describes the installation procedure for C8475-G2 and C8455-G2 in an equipment rack.
-
Two-post rack, either 19 inch or 23 inch. Inner clearance (the width between the inner sides of the two posts or rails) must be at least 19 inches (48.26 cm) or 23 inches (58.42 cm). Airflow through the chassis is from front to back (I/O-side to PSU-side).
-
(Only supported on C8475-G2) Four-post, 19-inch equipment rack. Inner clearance (the width between the inner sidesof the two posts or rails) must be at least 19 inches (48.26 cm). Airflow through the chassis is from front to back.