Overview
The site-planning activities that you should perform before installing your Cisco C9610 switch.
This table lists the site-planning activities that you must perform prior to installing the switch. Completing each activity helps ensure a successful switch installation.
| Task No. |
Activity |
Verified By |
Time |
Date |
|---|---|---|---|---|
| 1 |
Space evaluation
|
|||
| 2 |
Environmental evaluation
|
|||
| 3 |
Power evaluation |
|||
| 4 |
Grounding evaluation
|
|||
| 5 |
Cable and interface equipment evaluation
|
|||
| 6 |
EMI evaluation
|