Overview
What to look for before you install the Cisco C9610 switch.
Before you install your Cisco C9610 switch, follow these guidelines.
-
Comply with the safety warnings.
-
Follow the site, cabling, and power requirements.
-
Follow the site preparation checklist and rack-mounting guidelines.
-
Verify the contents of the shipping box.
-
Ensure that you have the tools and equipment required to install the switch.
-
Verify the standard accessory kit that is shipped along with the switch.
-
Go through the shelf-kit contents to order accessories.
-
Go through both the rack-mounting kit contents to order any accessories.
-