Cisco 600 Series Installation and Operation Guide
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Troubleshooting
![]() |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Table of ContentsTroubleshootingWAN Link and Power-Up Issues
Web Interface Password Lengths Web Browser Compatibility Serial Buffer Overflow RADIUS Password and Username Lengths Computers Running Linux Without term/termcap Clearing PC Cache with ARP RIP and Idle Timeouts ADSL Parameters for the set interface command Frequently Asked Questions about the WAN LNK LED BERT Testing (Cisco 675, Cisco 675e and Cisco 676 only) TroubleshootingThis chapter provides information about product issues in the Cisco 600 series CPE. WAN Link and Power-Up IssuesWhen you power up the CPE, this is the normal sequence of events:
So under normal conditions, the ALARM light should be off within six seconds of powering up the CPE, and within one minute the WAN-LNK light should become solid. If the CPE cannot establish communication with the service provider equipment, the WAN-LNK light will go off and the CPE will wait 10 seconds. The WAN-LNK light will start blinking when the CPE tries again to establish communication. If, after repeated attempts to establish communication, the WAN-LNK light continues blinking, turn the power off and then on. If the WAN-LNK light still does not become solid within one minute, call your service representative. If the ALARM light flashes RED or lights RED and stays on, call your service representative. Web Interface Password LengthsWeb interface passwords can be from 1 to 7 characters in length. Web Browser CompatibilityNetscape 3.01 or higher or Internet Explorer 3.01 or higher is recommended for use as a browser for the Cisco Web Management Interface. Serial Buffer OverflowWhen using the serial port as your terminal connection, large amounts of serial data might overflow the serial buffer. This results in ASCII garbage appearing on the screen, but does not affect performance or operation in any way. To avoid this issue, use Telnet to manage the CPE. RADIUS Password and Username LengthsThe Cisco 600 series CPE supports RADIUS passwords with more than 16 characters, however, RADIUS servers only support 16 characters or less. RADIUS usernames can be up to 255 characters. Refer to the "RADIUS Client" section. Computers Running Linux Without term/termcapComputers running Linux without the term/termcap database installed will have trouble connecting to Cisco equipment. The message "BAD ADDRESS" is sometimes displayed as an error message. The term/termcap database can be installed from the Linux install disks or CD-ROM. Clearing PC Cache with ARPIf you update IP addresses on many Cisco 600 series CPEs in rapid succession using a Windows PC, the ARP cache on the PC might not clear right away. This causes communications problems with the subsequent CPEs in the line. Use the arp -a command to obtain the current ARP list, then update the entries. For example, to clear the PC cache, use the following command at the MS-DOS prompt on your PC: c:\> arp -d 192.168.0.100 RIP and Idle TimeoutsOn a busy network with many RIP broadcasts and requests, RIP traffic alone can cause the Cisco 600 series CPE to remain sufficiently active to not trigger the idle timeout. Cisco recommends that RIP be disabled if Cisco 600 series CPE idle timeouts are used. ADSL Parameters for the set interface commandThe set interface wan0 command supports these parameters:
Frequently Asked Questions about the WAN LNK LEDThe WAN LNK LED blink patterns indicate the connection state of the CPE. Table 6-1: WAN Link LED Blink Patterns
This list describes all known conditions indicated by the WAN LNK LED:
cbos#show interface wan0
wan0 ADSL Physical Port
Line Trained
Actual Configuration:
Overhead Framing: 3
Trellis Coding: Disabled
Standard Compliance: T1.413
Downstream Data Rate: 8032 Kbps
Upstream Data Rate: 864 Kbps
Interleave S Downstream: 1
Interleave D Downstream: 64
Interleave R Downstream: 2
Interleave S Upstream: 4
Interleave D Upstream: 8
Interleave R Upstream: 16
Modem Microcode: G96
DSP version: 0
Operating State: Showtime/Data Mode
Configured:
Echo Cancellation: Disabled
Overhead Framing: 3
Coding Gain: Auto
TX Power Attenuation: 0dB
Trellis Coding: Enabled
Bit Swapping: Disabled
Standard Compliance: Multimode
Remote Standard Compliance:T1.413
Tx Start Bin: 0x6
Tx End Bin: 0x1f
Data Interface: Utopia L1
Status:
Local SNR Margin: 3.5dB
Local Coding Gain: 0.0dB
Local Transmit Power: 12.5dB
Local Attenuation: 28.5dB
Remote Attenuation: 18.5dB
Local Counters:
Interleaved RS Corrected Bytes: 0
Interleaved Symbols with CRC Errors: 2
No Cell Delineation Interleaved: 0
Out of Cell Delineation Interleaved: 0
Header Error Check Counter Interleaved:0
Count of Severely Errored Frames: 0
Count of Loss of Signal Frames: 0
Remote Counters:
Interleaved RS Corrected Bytes: 0
Interleaved Symbols with CRC Errors: 0
No Cell Delineation Interleaved: 0
Header Error Check Counter Interleaved:0
Count of Severely Errored Frames: 0
Count of Loss of Signal Frames: 0
You can also use the show interface wan0-0 command to display the status of the virtual circuit: cbos#show int wan0-0
WAN0-0 ATM Logical Port
PVC (VPI 1, VCI 1) is open.
ScalaRate set to Auto
AAL 5 UBR Traffic
PPP LCP State: Starting
PPP NCP State (IP Routing): Starting
PPP MRU: 2048 HDLC Framing: enabled MPOA Mode: VC Mux
PPP Login: ppp1
Authentication Type: Autodetecting/PAP
RADIUS: disabled
PPP Tx: 0 Rx: 60742
Dest IP: 205.142.210.1
Dest Mask: 255.255.255.255
IP Port Enabled
For PPP problems, use the show ppp command to display a summary of each virtual circuit for PPP mode. Check that the state of each virtual circuit is opened. cbos#show ppp VC VPI/VCI STATE MRU USERNAME RADIUS TX RX wan0-0 01/01 Starting 2048 ppp1 disabled 0 60742 wan0-1 01/02 Starting 2048 ppp2 disabled 0 59950 wan0-2 01/03 Starting 2048 ppp3 disabled 1476 738 wan0-3 01/00 Starting 2048 ppp4 disabled 0 59822 BERT Testing (Cisco 675, Cisco 675e and Cisco 676 only)This section describes BERT tests using a Cisco 6100 DSLAM, Cisco 675, Cisco 675e, or Cisco 676, and an optional HP Broadband test set. HP Test Set ConfigurationAll tests are based on the single cell version of S-PRBS9. This is the only PRBS pattern that is supported by the HP for generating multiple channels of cell load. All cells will have the same data, therefore it is necessary to have a cell sequence number to verify cell loss. This is done using AAL1. Cells are generated by the HP and terminated by the Cisco 675s in the downstream direction, and vice versa for the upstream direction. The HP can only check BERT data on one channel at a time. It is therefore necessary to manually walk through every channel to verify data integrity. The BERT test can be performed without the HP test set if the Cisco 6100 NIU is physically looped back at the OC3 port. Transmitting BERT DataThe following are the procedures for transmitting BERT data. Note that all pertinent tests will be initiated from the Optical Line Interface Card, and not a Cell Processor. Step 1 Configure the load generator (truck icon) to send S-PRBS9 data to each CPE on VPI X / VCI X. Starting with channel 2 on the load generator, set up a connection using VPI 1 / VCI 32. Continue with channel 3 as VPI 1 / VCI 33 and so on until the number of channels that need to be tested are accounted for. Step 2 Set the contents of each cell to S-PRBS9 with AAL1 enabled. All channels can be done at once by highlighting all of the channels and then setting the contents. AAL1 provides sequence numbers to determine if cells are being dropped. Step 3 Set the bandwidth to the desired downstream rate. Again, all channels can be highlighted and changed simultaneously. This rate should be slightly lower than the trained rate (for example, 1.4M). Step 4 Configure the Cisco 6100 or Cisco 6260 to set up connections from the NIs OC3 to the CPEs. Use the same connection parameters (VPI/VCI) that were used to configure the load generator. Step 5 Verify that no other cell generation sources are active on the HP and that the laser is turned on. Step 6 Compile the load generator and data will start flowing to the NI, through the Cisco 6100 or Cisco 6260 and out to the CPEs. Every time a parameter is changed in the load generator, it is necessary to compile for the change to take effect. Step 7 The CPE should now be receiving BERT data. Receiving BERT DataAfter the CPEs have been BERT enabled, they will send S-PRBS9 BERT data toward the Cisco 6100 or Cisco 6260. The HP can verify the BERT data one channel at a time. Follow this procedure to receive BERT data: Step 1 Select the receive filter from the Optical Line Interface Card and not the Cell Processor Card. This is the net/strainer icon. Step 2 Specify the VPI and VCI that needs to be checked. The receive filter mode should be Virtual Channel. Step 3 Select S-PRBS9 and AAL1. Now, only the specified cells will make it to the statistics counters. Step 4 Select the statistics icon (ones and zeros). Select View and ATM Statistics. Step 5 Select Selected Cell Count, Bandwidth, Cell Loss, etc. Step 6 Apply. Step 7 Select measurements and start the counters. This will give you the statistics for the cell currently selected in the receive filter. Repeat the above procedure to check other channels. The Cell Protocol Processors can be used to view incoming cells if desired. Cisco 600 Series CPE ConfigurationConfigure the CPE to perform BERT testing: Step 1 Log in to the CPE via Ethernet or serial port. Step 2 Give access to the BERT commands: cbos> enable debug commands Step 3 Keep the CPEs from trying to retrain even though they do not see the CO equipment on the far end: cbos# ifconfig wan0 stay Step 4 Initiate the BERT test: cbos# debug bert on Step 5 Set the header bits of the outgoing cells and qualify the incoming cells. Step 6
Example: VPI=1, VCI=1 (GFC=0, PTI=0, CLP=0) across the ADSL loop (see command line above). Table 6-2: BERT Header Bit Map
Step 7 Display a count of the BERT errors and cell loss since the previous query: cbos# debug bert count Step 8 Note that the two LEDs on the left of the CPE take on a new meaning during the BERT tests.
During a successful BERT test, the LED at the left will be illuminated, and the second LED from the left will be solid (either off or on, but not blinking).
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|