Overview
LAN automation planning is the first step in successfully building the underlay network. This section explains the aspects you must consider to ensure that the Cisco LAN automation support matrix aligns with the targeted underlay network environment.
System roles and network topologies
Information about device roles and the supported network topologies for LAN automation.
Layer 3 link configuration
Conversion of Layer 2 links to Layer 3 after LAN automation stops.
Supported switches for each role at different layers
Supported products for LAN automation.
Site planning
Designing network hierarchy for LAN automation.
IP pool planning
Information on IP pool planning for LAN automation.
Site-specific CLI and SNMP configuration
CLI and SNMP configuration using Catalyst Center.
Configuration on seed devices
Information required for configuring seed devices for LAN automation.
PnP agent initial state
PnP agent initial state before starting LAN automation.