The goal of implementation is to introduce the new system into the network with the least amount of disruption and the highest level of interoperability with the existing network. To minimize downtime, an essential component of this process is the implementation plan.
Tip
You can navigate to any topic on this tab by using the tab navigation pane at the left of the content pane. This navigation pane contains the table of contents (TOC) for the active tab.
Before You Begin
You should understand how to implement Cisco Unified Communications. For more information, see Cisco Unified Communications Implementation.
Before you begin installing components, you should have a completed implementation plan from the detailed design. Use the equipment list and site specification from the detailed design to do the following:
•
Order and stage equipment
•
Perform detailed site survey
•
Create site-specific installation guidelines
Your implementation plan should include:
•
Deployment strategy
•
Network maps and topology diagrams
•
Installation and commissioning tests
•
Site survey results
•
List of all devices to be implemented
•
Installation guidelines
•
Configuration worksheets
•
Test and turn-up plan
When You Are Done
All components are installed and ready to configure.
Major Tasks in This Process
•
Install and Configure System Components