What to do before you install your switch.
Airflow Requirements
How to identify the airflow into and from the switch, and to position the FRUs to ensure proper cooling.
Altitude Requirements
The operating altitude for this switch.
Clearance Requirements
Clearance to maintain between the switch and any other rack, device or structure.
Dust and Particulate Requirements
How to minimize the accumulation of dust and particulate matter in your switch.
Grounding Requirements
How to earth-ground your switch to prevent voltage fluctuations.
Humidity Requirements
How to prevent moisture from entering your switch.
Minimize Electromagnetic and Radio Frequency Interference
How to minimize electromagnetic and radio frequency interference that can damage your switch.
Plan for Power Requirements
Explains the essential power requirements and redundancy options for switch operation.
Prevent Electrostatic Discharge Damage
How to prevent electrostatic discharge from your switch.
Rack and Cabinet Requirements
The type of racks and cabinets to mount your switch.
Shock and Vibration Requirements
Explains whether the switch can withstand shock and vibration from various factors.
Temperature Requirements
Operating temperature of the switch and an overview of the module temperatures.
Network Equipment-Building System (NEBS) Statements
Ensure that you follow these NEBS statements before installing your switch.
Site Preparation Checklist
A checklist to ensure that your site is prepared for the switch installation.
Contact and Site Information
Information about the site and contact person.
Chassis and Module Information
Create worksheets to capture chassis and module information.