Site Preparation Checklist

Want to summarize with AI?

Log in

A checklist to ensure that your site is prepared for the switch installation.


Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation, ventilation, and accessibility.

The table lists the site planning tasks. We recommend that you complete the tasks before you install the switch. Your completion of each task ensures a successful switch installation.

Planning activity

Verification Time and Date

Space evaluation:

Space and layout

Floor covering

Impact and vibration

Lighting

Physical access

Maintenance access

Environmental evaluation:

Ambient temperature

Altitude

Humidity

Airflow

Atmospheric contamination

Power evaluation:

Input power type

Power receptacles

Receptacle proximity to the equipment

Dedicated (separate) circuits for power redundancy

UPS for power failures

Grounding: proper wire gauge and lugs

Circuit breaker size

Grounding evaluation:

Data center ground

Cable and interface equipment evaluation:

Cable type

Connector type

Cable distance limitations

Interface equipment (transceivers)

EMI evaluation:

Distance limitations for signaling

Site wiring

RFI levels