Guides you through troubleshooting ISSU issues by verifying readiness, resolving rejection due to configuration synchronization or software mismatch, and investigating stalled ISSU operations, including log collection, commit, and abort procedures.


Use this procedure to troubleshoot ISSU issues by verifying readiness, resolving rejection due to configuration synchronization or software mismatch, and analyse stalled ISSU operations, including log collection, commit, and abort procedures.

The three-step ISSU workflow has an automatic rollback timer. The install commit operation makes the new software permanent and closes the rollback window. The one-step ISSU workflow commits automatically and therefore has no ISSU pre-commit rollback window.

If install abort issu does not clear the state, preserve the diagnostics data and contact Cisco Support. Do not self-run service internal or clear install state. Do not run install remove inactive while rollback is still required.

Before you begin

Verify ISSU compatibility. Refer the ISSU Compatibility Matrix and In-Service Software Upgrade (ISSU) Release Matrix.

Procedure

  1. Confirm ISSU readiness.

    1. Confirm that no ISSU operation is active.

      Example:

      switch# show issu state detail
      Current ISSU Status: Enabled
      Previous ISSU Operation: N/A
      ...
      No ISSU operation is in progress

      This is the expected starting state. The ISSU status indicating Enabled alone is not sufficient; confirm that no ISSU operation is active.

    2. Verify STANDBY HOT and SSO state.

      Example:

      switch# show redundancy states
      my state = 13 -ACTIVE
      peer state = 8 -STANDBY HOT
      Redundancy Mode (Operational) = sso
      Redundancy Mode (Configured)  = sso
      Communications = Up

      An ISSU-capable redundant system requires a synchronized STANDBY HOT peer, operational SSO, and communications Up.

    3. Verify configuration synchronization.

      Example:

      switch# show redundancy config-sync failures mcl
      Mismatched Command List
      -----------------------
      The list is Empty
    4. Verify parser return-code synchronization.

      Example:

      switch# show redundancy config-sync failures prc
      The list is Empty
    5. Verify best-effort synchronization.

      Example:

      switch# show redundancy config-sync failures bem
      The list is Empty

      Empty lists mean no reported active-to-standby synchronization failures.

    6. Verify ISSU compatibility inputs.

      Example:

      switch# show version
      switch# show boot
      switch# show module
      switch# show install summary
      switch# show issu comp-matrix
  2. Resolve ISSU rejection by configuration synchronization.

    1. Identify MCL synchronization failures and remove or modify the incompatible commands.

      Example:

      If the device displays this ERROR log, run the show redundancy config-sync failures historic mcl command.

      
      ERROR: MCL-Terminating the current ISSU Operation.
      ISSU Abort operation is initiated
      
      ERROR: Once ISSU abort is done please check full list of
      mismatched commands via:
      show redundancy config-sync failures historic mcl
      switch# show redundancy config-sync failures historic mcl
      ...
      <INCOMPATIBLE_COMMANDS>

      The output indicates that at least one configured command cannot synchronize to the target release.

      Review each command and its service impact. Remove or modify it only when it is operationally safe. If it cannot be removed, use a normal INSTALL-mode upgrade; do not force the ISSU operation.

    2. Identify software or ROMMON mismatch.

      Example:

      %REDUNDANCY-2-IPC: IOS versions do not match.

      The error log indicates that there is a mismatch of software and ROMMON versions.

      Compare the software and ROMMON on both supervisors or members. ISSU must not continue until the exact platform requirements are met.

  3. Analyse an ISSU operation that appears stalled.

    1. Check the current ISSU stage.

      Example:

      switch# show issu state detail
      Current ISSU Status: In Progress
      Previous ISSU Operation: N/A

      In Progress status can be normal during a transition. Compare the current stage and timestamps with the expected change-window timing.

    2. Recognize a new ISSU operation that is blocked.

      Example:

      switch# install add file flash:<IMAGE.bin> activate issu commit
      FAILED: ISSU in progress; please use install abort issu to abort
      the ISSU operation OR use install commit to commit the ISSU operation.

      This error log indicates that an earlier three-step ISSU transaction is still active. Do not start another add or activation step in between.

    3. Collect ISSU, install, redundancy, and log state.

      Example:

      switch# show clock
      switch# show issu state detail
      switch# show issu sessions
      switch# show issu entities
      switch# show issu negotiated
      switch# show install summary
      switch# show install log
      switch# show redundancy
      switch# show redundancy states
      switch# show logging | include ISSU|INSTALL|REDUNDANCY
    4. Commit an intentionally uncommitted ISSU target if post-upgrade validation has passed and the active three-step ISSU is awaiting commit.

      Example:

      switch# install commit
      ...
      SUCCESS: install_commit

      The commit operation makes the ISSU target persistent and closes its rollback window.

    5. If the active three-step ISSU is uncommitted and must be abandoned, then abort that active uncommitted ISSU operation.

      Example:

      switch# install abort issu
      ...rollback messages...
      SUCCESS: ISSU abort completed

      This operation returns the system to the previously installed software and can reload supervisors or members. Use it only after confirming that ISSU is active and not committed.