Unpack the ONT
Before you begin
-
Personnel involved in the installation must be trained in and have experience with Ciena® product installations.
-
Follow site standards regarding system weight when unpacking and maneuvering the ONT.
-
Inspect the shipping container for physical damage. If any components are damaged, refer to the instructions in section Returning materials.
Thefollowing items are shipped:
-
ENC-10G-ONT-14A ONT
-
12V 2A DC power adapter
Procedure
|
Step 1 |
Verify the shipping container contents against the shipping invoice. |
||||||
|
Step 2 |
Compare the labels on the shipping containers with the information on the packing list.
|
||||||
|
Step 3 |
Remove the cardboard box and plastic bag from the shipping container. |
||||||
|
Step 4 |
Carefully lift the ONT out of the cardboard box. |
||||||
|
Step 5 |
Remove the foam block from the ONT. |
||||||
|
Step 6 |
Remove the ONT out of the ESD bag. |
||||||
|
Step 7 |
Ensure that the shipping container is empty. |
||||||
|
Step 8 |
Dispose of shipping container and packing materials in accordance with site requirements. |
Feedback