OLT-C with E-OLT-C replacement
The OLT-C to E-OLT-C replacement activity is a planned maintenance procedure that replaces an optical line terminal controller (OLT-C) line card with an enhanced optical line terminal controller (E-OLT-C) line card in a Cisco NCS1010 chassis.
A OLT-C to E-OLT-C replacement is a planned maintenance procedure that
-
requires a maintenance window and coordinated traffic impact planning,
-
uses Cisco Optical Site Manager (COSM) and Cisco Optical Network Controller (CONC) to manage configuration and circuit state, and
-
restores circuits, alarms, and synchronization to the precheck state after the swap.
Audience and outcomes
This procedure is for operations teams performing line card replacements on production nodes.
Typical steps in the process include:
-
Collecting precheck logs and configuration baselines,
-
Replacing the line card and reapplying configuration, and
-
Verifying postchecks and resolving any deviations.
Feedback