Contents
* - A - B - C - D - E - F - G - I - L - M - N - O - P - R - S - T - U - V - W
Index
*
A
acceptance tests
air filter, description
1
B
C
cards
symbol and slot correspondence
1 2 3
changing
Cisco NCS 2015 shelf
cleaning
clock
coating bare power conductors
1 2 3 4
connecting
multishelf node and subtending shelves to an MS-ISC-100T card
1
power to ANSI shelf
1 2 3
CTC
verifying software release
1
cutting fuse and alarm cables
1 2 3
D
date
E
Electrostatic Discharge and Grounding Guide for Cisco Cisco CPT and Cisco ONS Platforms
1 2 3 4 5 6 7 8 9 10 11 12 13 14
F
fan-tray assembly
fans
fiber
filler cards
front door
fuse and alarm panel
measuring and cutting cables
1 2 3
verifying office battery and ground
1 2 3
G
ground
connecting to ETSI shelf
1
verifying before turning on office power
1 2
I
inspecting
installation
installing
L
LAN cable
connecting nodes in multishelf mode
1
LCD
verifying software version
1
M
measuring
fuse and alarm cables
1 2 3
mounting
multiple nodes in a rack
1 2
shelf assembly in a rack (one person)
1 2
shelf assembly in a rack (two people)
1 2
single node in a rack
1 2
mounting brackets
reversing the brackets to covert the rack size
1 2 3
mounting brackets, description
1 2 3
MS-ISC-100T card
multishelf mode
N
NCS 2015
connecting office power
1
external connection units
1
installing fan-tray assembly
1
installing power and ground
1
installing power modules
1
installing standard door
1
mounting brackets for ANSI rack
1
mounting brackets in ETSI rack
1
replacing fan-tray assembly
1
NTP-G24 Set Up Name, Date, Time, and Contact Information, page 5-15
1 2 3
NTP-G38 Provision OSC Terminations, page 5-121
1
O
office power. See power
1 2 3
opening
P
power
coating bare conductors
1 2 3 4
connecting office power to ANSI shelf
1 2 3
connecting office power to ETSI shelf
1
See also ground [power
turning on and verifying office power
1 2 3 4 5
R
rack
converting the rack size
1 2 3
installation overview (ANSI)
1 2 3
installation overview (ETSI)
1 2
mount a single node (ANSI)
1 2 3
mount multiple nodes (ANSI)
1 2
mounting a single node
1 2 3 4
mounting a single node (ETSI)
1 2
mounting multiple nodes (ETSI)
1 2
reversible mounting bracketinstallation
See also rack [installation
removing
replacing
resetting
TCC2/TCC2P card clock
1 2 3 4
reversing the mounting brackets
1 2 3
S
Shelf
shelf assembly
mounting in a rack
1 2 3 4
unpacking and inspecting
1
slots
software
verifying software version
1
T
TCC2 card
TCC2P card
Temperature
third-party equipment
fuse and alarm panels
1 2 3
TNC card
configuring UDC and VoIP
1
provisioning PPM and port
1
TNCS card
configuring UDC and VoIP
1
provisioning PPM and port
1
TSC card
turning on office power
1 2 3 4 5
U
unpacking the shelf assembly
1
V
verifying
Voltage
voltmeter
verifying office battery and ground
1 2 3
verifying the office ground and power
1
verifying the shelf and ground power wiring
1
verifying the shelf for –48 VDC
1 2 3
W
warnings