Site Planning and Maintenance Records

This appendix includes a site planning checklist and maintenance records to use when installing the Cisco MDS 9148S Multilayer Fabric Switch, and it includes the following sections:

note.gif

Noteblank.gif For information about how to query the switch for configuration information, see the Cisco NX-OS Fundamentals Configuration Guide.


Site Preparation Checklist

Planning the location and layout of your equipment rack or wiring closet is essential for successful switch operation, ventilation, and accessibility. Table 1-1 lists the site planning tasks that we recommend completing before installing the Cisco MDS 9148S Switch.

Consider heat dissipation when sizing the air-conditioning requirements for an installation. See Table 1-1 for environmental requirements and Table 1-4 for power and heat ratings.

 

Table 1-1 Site Planning Checklist

Task No.
Planning Activity
Verified By
Time
Date

1

Space evaluation:

  • Space and layout
  • Floor covering
  • Impact and vibration
  • Lighting
  • Maintenance access

 

 

 

2

Environmental evaluation:

  • Ambient temperature
  • Humidity
  • Altitude
  • Atmospheric contamination
  • Air flow

 

 

 

3

Power evaluation:

  • Input power type
  • Power receptacles1
  • Receptacle proximity to the equipment
  • Dedicated circuit for power supply
  • Dedicated (separate) circuits for redundant power supplies
  • UPS2 for power failures

 

 

 

4

Grounding evaluation:

  • Circuit breaker size
  • CO ground (AC- powered systems)

 

 

 

5

Cable and interface equipment evaluation:

  • Cable type
  • Connector type
  • Cable distance limitations
  • Interface equipment (transceivers)

 

 

 

6

Electromagnetic interference (EMI) evaluation:

  • Distance limitations for signaling
  • Site wiring
  • RFI3 levels

 

 

 

1.Verify that the power supply installed in the chassis has a dedicated AC source circuit.

2.UPS = uninterruptible power supply.

3.RFI = radio frequency interference.

Contact and Site Information

Use the following worksheet to record contact and site information.

 

Table 1-2 Contact and Site Information

Contact person

 

Contact phone

 

Contact E-Mail

 

Building/site name

Data center location

Floor location

 

Address (line 1)

 

Address (line 2)

 

City

State

 

Zip code

 

Country

 

Chassis and Network Information

Use the following worksheets to record chassis and network information.

Contract Number

 

Chassis Serial Number

 

Product Number

 

Table 1-3 Network-Related Information

Switch IP address
Switch IP netmask
 
Host name
Domain name
IP broadcast address
Gateway/router address
 
DNS address
 
Modem telephone number