This appendix includes a site planning checklist and maintenance records to use when installing the Cisco MDS 9148S Multilayer Fabric Switch, and it includes the following sections:
Note For information about how to query the switch for configuration information, see the Cisco NX-OS Fundamentals Configuration Guide.
Planning the location and layout of your equipment rack or wiring closet is essential for successful switch operation, ventilation, and accessibility. Table 1-1 lists the site planning tasks that we recommend completing before installing the Cisco MDS 9148S Switch.
Consider heat dissipation when sizing the air-conditioning requirements for an installation. See Table 1-1 for environmental requirements and Table 1-4 for power and heat ratings.
|
|
|
|
|
---|---|---|---|---|
Electromagnetic interference (EMI) evaluation:
|
1.Verify that the power supply installed in the chassis has a dedicated AC source circuit. |
Use the following worksheet to record contact and site information.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Use the following worksheets to record chassis and network information.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|