Numerics - A - D - E - F - G - I - L - M - N - P - R - S - T - U -

Index

Numerics

10GbE iSCSI

port1-5to 1-6

port LED 1-6

A

audible alarm, silencing 1-5

D

disk drives

description 1-8

inserting 5-8

loading procedures3-7to 3-9

removing5-7to 5-8

replacement procedures 5-6

unpacking 2-5

E

electrostatic discharge (ESD) 2-2, 3-3

emergency mode 1-4, 1-5

F

fans

drawer front fans

CPS-SS-4RU 1-2, A-2

CPS-SS-4RU-EX 1-2, B-2

inserting 5-10

removing 5-10

replacement procedures5-9to 5-11

failure 2-3

LEDs

environment (ENV) 1-2, 5-11

Power Supply Unit fan status 1-4, 1-7, 5-1

rear fan pack

CPS-SS-4RU 1-8, A-2

CPS-SS-4RU-EX 1-8, B-2

inserting 5-12

removing 5-12

replacement procedures5-11to 5-13

Fibre Channel

port1-5to 1-6, 4-1

port LED 1-5

field-replaceable modules

disk drives

description 1-8

inserting 5-8

loading procedures3-7to 3-9

removing5-7to 5-8

replacement procedures 5-6

unpacking 2-5

expansion controller

description 1-6

inserting3-5to 3-6, 5-5

removing2-7to 2-8, 5-4

replacement procedures5-4to 5-5

fans

description 1-2, 1-8

inserting 5-10, 5-12

removing 5-10, 5-12

replacement procedures 5-9

specifications A-2, B-2

Power Supply Unit (PSU)

description 1-3, 1-6

inserting 3-5, 5-2

removing 2-7, 5-2

replacement procedures 5-1

RAID controller

description 1-3

emergency mode 1-4, 1-5

inserting3-5to 3-6, 5-4

powering down 1-5

removing2-7to 2-8, 5-3

replacement procedures 5-2

single-controller configuration 1-3, 2-3

single-controller shutdown 5-3

front panel

CPS-SS-4RU1-1to 1-2

CPS-SS-4RU-EX1-1to 1-2

G

grounding

equipment 2-2

rack. See rack, grounding

yourself 2-2, 3-3, 3-3

I

installing

cabling procedures4-1to 4-2

CPS-SS-4RU3-1to 3-9

CPS-SS-4RU-EX3-1to 3-9

grounding yourself 2-2, 3-3, 3-3

mounting hardware3-1to 3-2

preparing units 2-7

rack mounting hardware 2-8

tools and equipment required 2-1

unpacking 2-3

iSCSI

port 1-4

port LEDs 1-4

L

LEDs

10GbE iSCSI port 1-6

controller status (STAT), rear panel 1-4, 1-7, 5-3, 5-4

disk (DSK), front panel 1-2, 5-6

disk status, interior 1-8, 5-7

environment (ENV) 1-2, 5-11

expansion port (EXP IN L0/L1) 1-7, 4-2

Fibre Channel port 1-5

front panel

CPS-SS-4RU 1-2

CPS-SS-4RU-EX 1-2

iSCSI port 1-4

management port 1-4

power (PWR) 1-2

Power Supply Unit fan status (FAN) 1-4, 1-7, 5-1

Power Supply Unit status (PSU) 1-4, 1-7, 5-1

rear panel

CPS-SS-4RU 1-4

CPS-SS-4RU-EX 1-7

SAS port 1-4

unit status (STAT), front panel 1-2, 5-9

M

modules

active drawer

closing3-8to 3-9, 5-8

description 1-2

lock 1-2, 3-7, 5-6

opening3-7to3-8, 5-6to 5-7

STAT LED 1-2, 5-6, 5-9, 5-11

disk drives

description 1-8

inserting 5-8

loading procedures3-7to 3-9

removing5-7to 5-8

replacement procedures 5-6

unpacking 2-5

expansion controller

description 1-6

inserting3-5to 3-6, 5-5

removing2-7to 2-8, 5-4

replacement procedures5-4to 5-5

fans

description 1-2, 1-8

inserting 5-10, 5-12

removing 5-10, 5-12

replacement procedures 5-9

specifications A-2, B-2

Interconnect Service Module (ISM) 1-3, 1-6

Power Supply Unit (PSU)

description 1-3, 1-6

inserting 3-5, 5-2

removing 2-7, 5-2

replacement procedures 5-1

RAID controller

description 1-3

emergency mode 1-4, 1-5

inserting3-5to 3-6, 5-4

powering down 1-5

removing2-7to 2-8, 5-3

replacement procedures 5-2

single-controller configuration 1-3, 2-3

single-controller shutdown 5-3

N

non-field-replaceable modules

active drawer

closing3-8to 3-9, 5-8

description 1-2

lock 1-2, 3-7, 5-6

opening3-7to3-8, 5-6to 5-7

STAT LED 1-2, 5-6, 5-9, 5-11

Interconnect Service Module (ISM) 1-3, 1-6

P

port

10GbE iSCSI1-5to 1-6

cabling procedures4-1to 4-2

expansion 1-7, 4-1, 5-5

Fibre Channel1-5to 1-6, 4-1

host port options1-5to 1-6

iSCSI 1-4

management 1-4, 4-1

SAS 1-4, 4-1

serial 1-4

power

applying 1-5, 4-2

overloading, prevention 2-2

socket 1-4, 1-7, 5-1, 5-2

specifications 1-4, 1-7, 2-2, A-1, B-1

switches 1-5, 4-3, 5-4

R

rack

grounding 2-2

mechanical loading 2-1, 2-2, 3-1

mounting hardware

installing2-8, 3-1to 3-2

specifications A-1, B-1

unpacking 2-4

mounting procedures

CPS-SS-4RU3-1to 3-9

CPS-SS-4U-EX3-1to 3-9

rails. See mounting hardware

size 2-1, A-1, B-1

rear panel

CPS-SS-4RU1-3to 1-6

CPS-SS-4RU-EX1-6to 1-7

S

switches

SW0 1-5, 4-3, 5-4

T

technical specifications

CPS-SS-4RUA-1to A-2

CPS-SS-4RU-EXB-1to B-2

temperature specifications

ambient temperature 2-2

chassis 2-2, A-2, B-2

drawer 2-3, 3-7, A-2, B-2

environment (ENV) LED 1-2, 5-11

fan failure 2-3

FAN LED 1-4, 1-7, 5-1

STAT LED 1-2

U

unpacking

CPS-SS-4RU 2-6

CPS-SS-4RU-EX 2-6

disk drives 2-5

rack mounting hardware 2-4