Table Of Contents A - B - C - D - E - F - G - I - L - M - N - O - P - R - S - T - U - V - Index A AC power 6 AC-input power supplies connection guidelines 3 audience description iii B bracket re-install 8 brackets front rack mount, installation 7 C cabinet 4 cabinet installation guidelines 2 cabinets requirements 1 See also racks space requirements 1 Cables and connectors 3 cabling 2 console port 2 MGMT 10/100/1000 Ethernet port 3 requirements 2 SFP transceivers 7, 8 chassis 4 installing guidelines 4 unpacking 2 chassis (MDS 9513 Director) serial number location 2 Command-Line Interface vii connecting console port 2 Fibre Channel ports 3 connector 3 console port 2 cabling 2 connecting 2 pinouts 2 contact and site information 6 customer service, contacting 1 D DC power 6 E electrostatic discharge 11 environmental specifications 1 ESD 14 Ethernet port 3 F fan modules removing and installing 18 FCoE ports 1 fiber optic cables, maintaining 9 Fibre Channel ports 1 connecting 3 connecting with LC-type cables (figure) 8 G grounding attaching the ESD wrist strap 12 establishing the system ground 13 required tools and equipment 14 grounding lug kit 3 I installing equipment required 3 guidelines 4 rack mount brackets 5 rack-mounting guidelines 2 SFP transceiver cables 8 SFP transceivers (note) 5 installing SFP transceivers 7 L LC-type cables connecting to Fibre Channel ports 8 figure 8 LEDs 3 M maintaining fiber optic cables 9 SFP transceivers 9 maintenance records 1 MGMT 10/100/1000 Ethernet port 3 cabling 3 pinouts 3 MGMT 10/100/1000 port 3 N NEBS 12 network connections, preparing 2 O open racks 1 open racks, standard (requirements) 2 organization description iii P physical specifications (table) 2 pinouts 2 console port 2 MGMT 10/100/1000 Ethernet port 3 plugs supported for power supplies 4 power cords, length 4 power supplies circuits 4 starting up the switch 14 supported plugs 4 voltage specifications 3 See also AC-input power supplies power supplies (Cisco MDS 9509 Director) specifications 2 powering up the switch 15 pre-installation guidelines 2 rack mount brackets 3 R rack-mount installation options 2 racks EIA installing 4 open, requirements 2 required equipment 3 requirements 1 See also cabinets. space requirements 1 records 1 chassis and module information 7 contact and site information 6 site planning and maintenance 1 removing SFP transceiver cables 7 SFP transceivers 5 required tools and equipment 14 S SFP and SFP+ transceivers specifications 4 SFP transceivers cabling 7, 8 description 7, 4 Fibre Channel 7 Fibre Channel specifications 3, 4 Fibre Channel supported 3, 4 installing 7 latches supported 4 removing 5 SFP+ transceivers description 4 shelf brackets 6 site planning preparation checklist 2 specifications cables 1 environmental 1 pinouts 1 power, MDS 9509 Director 2 SFP and SFP+ transceivers 4 Supervisor-2 Ethernet port 3 supported power cords and plugs 4 system grounding 11 T technical specifications voltage 3 transceivers 7 description 7 supported SFP transceivers 7 supported X2 transceiver 7 troubleshooting 1 contacting customer service 1 U unpacking 2 V voltage specifications (table) 3
A
B
C
D
E
F
G
I
L
M
N
O
P
R
S
T
U
V