Table Of Contents
Preface
Preface
This preface explains the objectives, intended audience, and organization of this Cisco CRS-1 Carrier Routing System 16-Slot Line Card Chassis Site Planning Guide, referred to in this document as the site planning guide, and describes the conventions used in the document.
Objective
This guide describes the basic facilities requirements, such as floor space, power requirements, environmental requirements, and so on, for the Cisco CRS-1 16-slot line card chassis. The guide is intended to help you plan the sites where the chassis will be installed. It should be used with
Cisco Systems site planning coordinators and site inspectors, well in advance of the delivery of the chassis.
Audience
This guide is intended for anyone who plans the facilities, including space, floor weighting, power, cooling, cabling, delivery, and storage, for the installation of a Cisco CRS-1 16-slot line card chassis.
Document Organization
This guide contains the following chapters and appendixes:
•
Chapter 1, "Cisco CRS-1 Carrier Routing System," describes the Cisco CRS-1 routing system and presents an overview of the steps required to prepare the site for the installation of a line card chassis.
•
Chapter 2, "Space Planning," provides information about chassis space requirements and other site preparation details (for example, floor loading and securing the chassis to the floor).
•
Chapter 3, "Power and Cooling Requirements," describes the power and cooling requirements for the chassis.
•
Chapter 4, "Shipping and Receiving," describes the things to consider as you plan for the shipment of the chassis and transport to the installation site.
•
Chapter 5, "System Planning Considerations," provides information about system planning considerations, such as high availability.
•
Appendix A, "Product IDs," provides the product identifiers (IDs) for orderable chassis components.
•
Appendix B, "Preliminary Site Survey," contains a sample preliminary site survey in which you can enter information about the installation site and site-preparation process.
•
Appendix C, "System Specifications," lists the chassis specifications and provides information about wire gauges and resistances for DC power cabling.
Document Conventions
This guide uses the following conventions:
Caution 
Means
reader be careful. You are capable of doing something that might result in equipment damage or loss of data.
Note
Means reader take note. Notes contain helpful suggestions or references to materials not contained in this manual.
Warning Definition
Warning 
|
IMPORTANT SAFETY INSTRUCTIONS
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device. Statement 1071
SAVE THESE INSTRUCTIONS
|
See Cisco CRS-1 Carrier Routing System Regulatory Compliance and Safety Information for translations of warnings and information about the compliance and safety standards with which the Cisco CRS-1 routing system conforms.
Related Cisco CRS-1 Documentation
For a complete listing of Cisco CRS-1 planning, installation, and configuration documents, see the following publications:
•
Cisco CRS-1 Carrier Routing System Hardware Documentation Guide
•
About Cisco IOS XR Software Documentation
See the "Obtaining Documentation, Obtaining Support, and Security Guidelines" section for information on obtaining these and other publications.
Changes to This Document
Table 1 lists the technical changes made to this document since it was first printed.
Table 1 Changes to This Document
Revision
|
Date
|
Change Summary
|
OL-6326-07
|
February 2008
|
The document was updated with technical corrections.
|
OL-6326-06
|
August 2007
|
This revision includes technical corrections and other updates throughout the document.
|
OL-6326-05
|
June 2007
|
This revision updates the two-pole DC power requirements.
|
OL-6326-04
|
September 2006
|
This revision includes general technical corrections.
|
OL-6326-03
|
April 2006
|
This revision incorporates the following changes:
• Document title changed.
• Updated specifications for chassis dolly.
|
OL-6326-02
|
December 2005
|
This revision incorporates the following changes:
• The document was reorganized to more closely align with the steps in the site preparation process.
• Chapter 2, "Space Planning," and Chapter 4, "Shipping and Receiving," were updated with information about chassis dimensions and weight, required aisle clearances, and floor loading.
• Chapter 3, "Power and Cooling Requirements," was updated with new information on general power and grounding requirements and DC power requirements, and a few clarifications were made in the AC power section.
• Chapter 5, "System Planning Considerations," was updated with information about high availability.
• Several new product IDs were added to Appendix A "Product IDs."
• Chassis specifications were updated in Appendix C "System Specifications." The section "DC Wire Gauge and Resistance" was added.
|
OL-6326-01
|
July 2004 December 2004
|
The document was released in July and updated with technical corrections in December.
|
Obtaining Documentation, Obtaining Support, and Security Guidelines
For information on obtaining documentation, obtaining support, providing documentation feedback, security guidelines, and also recommended aliases and general Cisco documents, see the monthly What's New in Cisco Product Documentation, which also lists all new and revised Cisco technical documentation, at:
http://www.cisco.com/en/US/docs/general/whatsnew/whatsnew.html