Table B-1 Sample Routing System Preliminary Site Survey
Preliminary Site Survey
|
Order Information
|
Sales order number:
|
|
Estimated shipping date:
|
|
Site ready date:
|
|
Installation date:
|
|
|
Site Location and Address
|
Company name:
|
|
Site address:
|
|
Shipping address:
|
|
Building or computer room access:
|
|
Special instructions:
|
|
Hours and days of operation:
|
|
|
Site Survey Contacts
|
Primary Contact
|
Name:
|
|
Title:
|
|
Phone number:
|
|
Mobile phone number:
|
|
Fax number:
|
|
Pager number:
|
|
E-mail address:
|
|
|
Secondary Contact
|
Name:
|
|
Title:
|
|
Phone number:
|
|
Mobile phone number:
|
|
Fax number:
|
|
Pager number:
|
|
E-mail address:
|
|
|
Delivery and Installation Constraints
|
Is there a loading dock available to unload the equipment at this site?
|
|
Is the path to the installation area unobstructed? If not, can special arrangements be made to get the equipment to the installation area? Describe them.
|
|
On what floor is the installation?
|
|
If it is on a floor other than the ground floor, is there a freight elevator available? Note if the equipment will have to be brought up a flight of stairs.
|
|
Is there someone on site during working hours to accept delivery of the materials? If not, list the times this person would be available.
|
|
|
Floor Mounting
|
How many line card chassis will be installed? Is there floor space available for all of the chassis?
|
|
Does the floor meet the routing system floor-loading requirements?
|
|
Can the primary or secondary chassis mounting locations be used to secure the chassis to the floor, or will an outrigger kit be required?
|
|
Make a sketch of the area where the chassis is to be installed and note the chassis location.
|
|
|
Power
|
Is AC or DC power available for the chassis? Is there a connection point on the panel for the chassis?
|
|
Is there a fuse access panel (FAP) available for the equipment? Provide a connection point on the fuse access panel for each chassis.
|
|
Will a fuse access panel be installed in time for the routing system installation? Provide a date when the FAP will be installed.
|
|
Is the FAP in the same room as the chassis?
|
|
Is there an AC power outlet (220 V or 110 V) located within 10 feet of each chassis for PCs and test equipment?
|
|
Is there proper grounding for the equipment? If not, when will the grounding be available? Provide a connection point for the grounding.
|
|
Are there any restrictions when the equipment can be powered on or when electrical work can be done? If so, describe them.
|
|
Are there special requirements for power or power cables (for example, a different wire gauge, and so on)? If so, describe them.
|
|
|
Air conditioning
|
Does the site have the air conditioning capacity to handle the routing system? If not, note what will be done to rectify the lack of adequate cooling.
|
|
Describe the air conditioning at the site.
|
|
|
System Interconnection Cabling
|
Has the chassis-to-chassis interconnection cabling been considered?
|
|
|
Control Plane, BITS, and Alarm Interfaces
|
Will the facility building integrated timing source (BITS) be used? Has the cabling been considered?
|
|
Will the chassis be connected to an external alarm system? Has the cabling been considered?
|
|
|
Supported Data Interfaces
|
Will the routing system be connected to OC-3/STM-1 POS circuits? How many ports?
|
|
Will the routing system be connected to OC-48/STM-16 POS or DPT circuits? How many ports?
|
|
Will the routing system be connected to OC-192/STM-64 POS or RPR XFP circuits? How many ports?
|
|
Will the routing system be connected to OC-768/STM-256 POS circuits? How many ports?
|
|
|
Will the routing system be connected to Gigabit Ethernet (GE) or 10-GE circuits? How many ports?
|
|
|
|
Cable Plant
|
Have the cables been pulled for all data interfaces? If not, list the outstanding cabling that needs to be installed and the scheduled completion dates.
|
|
Are there connection points on the fiber distribution panel for all optical cables connecting to the routing system?
|
|
Will fiber jumpers be provided? What length of fiber jumper is required to complete the installation?
|
|
What type of fiber connector is used at the site?
|
|
If attenuation is required, will attenuators be provided? If not, who will pay for the attenuators?
|
|
|