Install Cisco UCS B-Series Tested Reference Configurations
Procedure
Step 1 |
Ensure that your UCS Mini or Fabric Interconnect Switches, Blade Server Chassis, and Fabric Extenders are installed in the rack. |
Step 2 |
Ensure that the network connections of your UCS Mini or Fabric Interconnect Switches are connected to their designated, trunked, switch ports. |
Step 3 |
Ensure that your Fabric Interconnect Switches are properly connected to your Fabric Extenders. |
Step 4 |
Ensure that you are able to access the blade remotely using UCS Manager software. |
Step 5 |
For the remaining server installation, see Cisco documentation at http://www.cisco.com/go/ucs. |