Table Of Contents
Numerics - A - B - C - D - E - F - G - H - I - K - L - M - N - O - P - R - S - T - U - W - X -
Index
Numerics
2-post hardware kit
rack-mount 3-3
2-post rack, front-mounting appliance on 3-16
2-post rack, mid-mounting appliance on 3-11
4-post hardware kit
rack-mount 3-3
4-post rack, mounting appliance on 3-5
A
adapter cards
troubleshooting C-4
ADE 1010 and 2120 Series appliance
front view 1-4
rear view 1-5
airflow
guidelines 2-8
altitude
guidelines A-4
B
Backing up appliance configuration 5-1
back panel 1-5, 3-25
Boot loader F-1
C
cable
connecting 3-25
management 3-29
checking
LEDs 3-30
checklist, installation 2-14
checklist, power up 3-29
CLI commands
exsession 4-4
ip broadcast 4-4
ip domain 4-4
ip gateway 4-4
ip host 4-4
ip interface 4-3
ip nameserver 4-5
ping 4-5
show ip 4-5
compliance
regulatory 1-10
Configuration
backing up 5-1
checking 4-5
restoring 5-2
configuration
site 2-8
Configuring
broadcast address 4-4
ip address 4-3
NAM interface for management traffic 4-3
connecting
cables 3-25
connections
console port 2-15
troubleshooting C-4
considerations
power 2-9
console port
connections 2-15
serial 1-8
console port, pinouts
serial 1-9
cooling system
troubleshooting C-3
corrosion
preventing damage A-2
CPI tool
identification 1-3, C-7
D
dust
preventing damage A-4
E
electricity
safety with 2-3
electromagnetic interference
See EMI
electrostatic discharge
See ESD
EMI
preventing effects of A-4
environment
maintaining A-1
site 2-8
environmental
features C-3
specifications (table) 2-9
equipment
racks
rack-mounting 2-9
safety with 2-3
ESD
preventing damage A-4
preventing effects of 2-5, A-4
Ethernet ports
NIC 1 1-7
F
fastener
pack 3-4
features
environmental reporting C-3
front panel
LEDs 1-4
front view
ADE 1010 and 2120 Series appliance 1-4
G
general
precautions 2-2
GNU GRUB F-1
grounding (warning) 3-29
guidelines
airflow 2-8
lifting 2-5
rack installation 2-6
rack-mounting configuration 3-2
safety 2-2
temperature and humidity 2-9
temperature maintenance A-3
H
hardware
installing 3-1
troubleshooting procedures C-1
helper utility F-1
humidity
maintenance guidelines A-4
I
identification
CPI 1-3, C-7
information
packet 2-12
installation
checklist 2-14
hardware 3-1
K
kit
rack-mount hardware (table) 3-3
L
LEDs
checking 3-30
front panel 1-4
front panel and NIC C-5
NIC 1 and NIC 2 1-6
lifting guidelines 2-5
location
serial number 1-3, C-7
log, site 2-14, D-1
Login prompt 4-2
logging in for the first time 4-1
M
magnetism
preventing effects of A-5
maintenance A-1
temperature A-3
management
cable 3-29
method of procedures
See MOP
MOP 2-6, 2-10
N
NIC 1
Ethernet ports 1-7
NIC 1 and NIC 2
LEDs 1-6
RJ-45 pinout 1-8
O
Optical tap device 3-28
overcurrent
protection 1-9
overtemperature
protection 1-10
overview
product 1-2
overvoltage
protection 1-9
P
pack
fastener 3-4
fastener (figure) 3-4
fastener (table) 3-4
packet
information 2-12
packing list (table) 2-11
planning
site 2-6
power
considerations 2-9
power lines (warning) 2-4
power source interruptions
preventing damage from A-5
power supplies (warning) 2-4
power supply (warning) 2-3, 3-29
power system
troubleshooting C-3
power up
procedure 3-29
precautions
general 2-2
problem solving
See troubleshooting
procedure
method of 2-10
power up 3-29
product
overview 1-2
protection
overcurrent 1-9
overtemperature 1-10
overvoltage 1-9
R
rack
2-post (telco) 2-7
4-post (open) 2-7
enclosed (do not use) 2-7
rack, front-mounting on 2-post 3-16
rack, mid-mounting on 2-post 3-11
rack, mounting on 4-post 3-5
rack installation
guidelines 2-6
rack-mount
2-post hardware kit 3-3
4-post hardware kit 3-3
rack-mounting configuration
guidelines 3-2
radio frequency interference. See RFI
rear view
ADE 1010 and 2120 Series appliance 1-5
regulatory
compliance 1-10
removing
ADE 1010 and 2120 Series appliance 3-31
restricted access (warning) 2-3, 2-6, 3-1
RFI
preventing effects of A-4
RJ-45 pinout
NIC 1 and NIC 2 1-8
Root user password
changing 4-2
S
safety
guidelines 2-2
SELV circuits (warning) 2-3
serial
console port 1-8
console port, pinouts 1-9
serial number
location 1-3, C-7
shipment
unpacking and checking 2-10
site
configuration 2-8
environment 2-8
maintenance factors A-1
log 2-14, D-1
planning 2-6
requirement, MOPs 2-10
T
temperature
maintenance guidelines A-3
temperature and humidity
guidelines 2-9
tools and equipment
required 2-13
trained and qualified (warning) 3-1
troubleshooting
adapter cards C-4
cables C-4
connections C-4
cooling system C-3
front-panel and NIC LEDs C-5
power system C-3
U
unpacking and checking
shipment 2-10
W
warranty 2-12
Web server
enabling 4-6
X
XFP transceiver module 3-23