Site Preparation and Maintenance Records
This appendix includes the following sections:
- Contact and Site Information Checklist
- Environmental Checklist
- Power Checklist
- LAN Connectivity Checklist
- SAN Connectivity Checklist
- Port Connection Record
Contact and Site Information Checklist
Planning the location and layout of your equipment rack is essential for successful equipment operation, ventilation, and accessibility.
This table lists the site planning tasks that we recommend that you complete before you install the Cisco UCS equipment. Your completion of each task ensures a successful installation.
Environmental Checklist
Use this checklist to record environmental information for the installation site.
Power Checklist
Use this checklist to record information about the power setup and requirements.
LAN Connectivity Checklist
Use this checklist to record information about LAN connectivity.
SAN Connectivity Checklist
Are the required optics available on the customer’s SAN switch to provide FC connectivity to the UCS Fabric Interconnect? |
||
Are the required cables available to connect the customer’s SAN switch to the UCS system? For example, “UCS Fabric Interconnect FC optic is SFP-10G-SR.” |
If yes, what are the length, type (fiber or copper), and quantity? |
|
5 |
What is the agreed upon plan to rectify the outstanding SAN connectivity issues? Include any notes needed by the implementation team. |
Port Connection Record
Use this checklist to record information about the cabling between fabric interconnects and chassis’.