A - B - C - D - E - F - G - H - I - K - L - M - N - O - P - R - S - T - V - W -

Index

A

acoustic noise specification, system A-3

AC power cord illustrations 2-4

AC power shelf

converting to DC power 2-14

enable switches (figure) 2-7

figure 2-25

installing 2-24

removing 2-26

weight of 2-27

air circulation components

installing 3-1

removing 3-3

air filter 1-7, 3-2

figure 2-20, 3-8, 3-9

installing 3-7

removing 3-9

replacement frequency recommendation 3-2

air filter (power tray)

figure 3-11, 3-12

installing 3-10

removing 3-12

airflow 3-1

(figure) 1-8, 3-2, 3-3

altitude specifications, system A-3

B

bale-clasp SFP

installing 4-54

removing 4-55

bonding

(figure) 2-3

guidelines 2-2

C

cable management bracket 1-7

(figure) 1-7

figure 4-5

information about 4-5

card

handle 4-11

handle (figure) 4-12

installation and removal, guidelines for 4-2

online insertion and removal (OIR) 4-2

slide-assistance arm 4-11

cards

performance route processor (PRP) 1-4

chassis

air circulation components 3-1

air filter (figure) 2-20, 3-8, 3-9

airflow 3-1

airflow (figure) 1-8, 3-2, 3-3

components 1-2

cooling system 1-7, 3-1

front view (figure) 1-2

grounding (figure) 2-3

installation task sequence 1-10

midplane, description 1-4

overview 1-1

rear view (figure) 1-3

slot numbers 1-5

specifications A-1

Cisco CRS

FP (forward processor card) 4-1

LSP (label switch processor card) 4-1

MSC (modular services card) 4-1

components, CRS routing system 1-2

cooling system, chassis 1-7, 3-1

CRS routing system

air filter 1-7

airflow and exhaust 1-8

chassis installation task sequence 1-10

chassis slot numbers 1-5

environmental specifications A-3

line card chassis specifications A-1

power system recommendations 2-1

D

DC power

lug torque ranges A-2

DC power input module 2-7, 2-14

Cisco product number 2-7

coupling screw (figure) 2-17

figure 2-16, 2-24

installing 2-16

mating to DC power input shelf 2-17

weight of 2-16

wiring block 2-10

wiring block covers, cabling orientation 2-19

DC power input shelf

Cisco product number 2-7

figure 2-17

installing 2-16, 2-17

mating to PIM 2-17

removing 2-23, 2-24

weight of 2-16

DC power shelf

cable wiring (figure) 2-18

components 2-7

coupling screw 2-17

DC input current and voltage 2-10

earth conductor gauge 2-11

enable switches 2-22

ground wire torque value 2-18

guidelines 2-9

installing 2-14

power input module (PIM) 2-7

removing 2-20

torque value for DC input power cables 2-18

torque value for ground wire 2-18

wiring 2-18

wiring block covers 2-19

DC power systems

cable lug (figure) 2-9

color coding of DC power cable 2-9, 2-18

converting from AC power 2-14

DC power input shelf 2-17

DC power shelf guidelines 2-9

input current and voltage 2-10

input-power-present LEDs 2-11

polarity, verifying 2-9, 2-18

power cables, recommendations 2-9

power supplies 2-19

reverse polarity, if detected 2-9

wire characteristics 2-11

doors

installing 5-4

knob latch 5-5

latch button 5-6

lower door mounting bracket 5-4

opening 5-7

removing 5-8

E

earth conductor guage 2-11

ejector levers

and captive screws (figure) 4-2

operating (figure) 4-3

electrostatic discharge, preventing 1-9

enable switches

AC power shelf 2-7

DC power shelf 2-22

F

fabric card

(figure) 4-19

installing 4-18

removing 4-22

fan tray

figure 3-4, 3-6

hot swapping caution 3-6

installation steps 3-5

installing 3-4

removing 3-5, 3-7

Figures

AC power enable switches 2-7

AC power shelf 2-25

air filter (chassis) 2-20, 3-8, 3-9

air filter (power tray) 3-11, 3-12

airflow 1-8, 3-2, 3-3

bale-clasp SFP 4-54

cable management bracket 1-7, 4-5

card handle 4-12

DC power cable lug 2-9

DC power input module (PIM) 2-16, 2-24

DC power input shelf 2-17

DC Power Shelf 2-8

DC power shelf coupling screw 2-17

DC power shelf enable switches 2-22

DC power shelf wiring 2-18

DC power supplies 2-19

ejector levers and captive screws 4-2

fan tray 3-4, 3-6

front view of line card chassis 1-2

installing a pillow block 4-16

installing bale-claps SFP 4-55

installing MSC 4-36

installing PLIM 4-46

installing switch fabric card 4-20

MSC 4-34, 4-36

MSC impedance carrier 4-9

NEBS bonding and grounding 2-3

operating ejector levers 4-3

PLIM 4-44

PLIM front panel 4-50

PLIM impedance carrier 4-8

Power Input Module (DC power) 2-10

power supply 2-28

power supply door grille in open position 2-29

rear view of line card chassis 1-3

removing a pillow block 4-17

removing bale-clasp SFP 4-57

removing MSC 4-39

removing PLIM 4-49

removing switch fabric card 4-23

removing the DC power input shelf 2-24

removing wiring block covers and DC power input cables 2-23

RP card 4-27

RP card front panel 4-31

RP card PCMCIA slot door 4-51

RP impedance carrier 4-7

slide-assistance arm 4-12

slot numbers (front) 1-5, 4-25

slot numbers (rear) 1-6, 4-18

switch fabric card 4-19

switch fabric card (front view) 4-23

switch fabric slot impedance carrier 4-6

filter, air 1-7, 3-2

G

grille

installing 5-1

removing 5-3

grounding

(figure) 2-3

ground wire 2-10

guidelines 2-2

H

handle, card 4-11

humidity guidelines, system A-3

I

impedance carrier

MSC (figure) 4-9

PLIM (figure) 4-8

RP (figure) 4-7

switch fabric (figure) 4-6

input-power-present LEDs 2-11

installing

AC power shelf 2-24

air circulation components 3-1, 3-3

air filter 3-7

bale-clasp SFP 4-54

chassis installation task sequence 1-10

DC power input module 2-16

DC power input shelf 2-16

DC power shelf 2-14

doors 5-4

fan try 3-4

grille 5-1

MSC 4-33

MSCs, FPs, LSPs, PLIMs, and components 4-1

PCMCIA card 4-51

pillow block 4-15

PLIM 4-42

power components 2-1

power supply 2-28

power tray air filter 3-10

RP card 4-24, 4-26

SFP modules 4-53

switch fabric card 4-18

K

knob latch 5-5

L

latch button 5-6

LEDs

DC power 2-11

if not lit 2-11

MSC 4-41

RP card 4-32

switch fabric card 4-24

line card chassis

cable management 1-7

components 1-2

cooling system 1-7

electrostatic discharge, preventing 1-9

FPs 4-1

LSPs 4-1

MSCs 4-1

MSC-side slot numbers 1-6

overview of 1-1

powering up or down 2-6

power system 1-8

power system recommendations 2-1

slot numbers 1-5

lower door mounting bracket 5-4

lug, DC power cable (figure) 2-9

M

midplane, description 1-4

MSC

(figure) 4-34, 4-36

installing 4-1, 4-33

installing (figure) 4-36

LEDs 4-41

and PLIMs 1-3

removing 4-1, 4-37

removing (figure) 4-39

troubleshooting 4-42

verifying installation 4-40

MSC-side slot numbers 1-6

N

NEBS

bonding (figure) 2-3

grounding (figure) 2-3

Telcordia GR-1089 standard 4-29

O

online insertion and removal (OIR) 4-2

overview of line card chassis 1-1

P

PCMCIA card

installing 4-51

overview 4-4, 4-51

removing 4-51, 4-52

RP card slot door (figure) 4-51

performance route processor (PRP) card 1-4

pillow block

installing 4-15

removing 4-16

PIM. See DC power input module

PLIM

(figure) 4-44

front panel (figure) 4-50

installing 4-42

installing (figure) 4-46

and MSC 1-3

removing 4-42, 4-48

removing (figure) 4-49

troubleshooting 4-50

verifying 4-50

polarity, verifying (DC power) 2-9, 2-18

power components

installing 2-1

power plug types 2-4

power supply

figure 2-28

installation 2-28

removing 2-30

weight of 2-29

power system

DC input power connections 2-8

line card chassis 1-8

powering chassis up or down 2-6

power tray air filter (figure) 3-11, 3-12

recommendations 2-1

preventing electrostatic discharge 1-9

R

removing

AC power shelf 2-26

air circulation components 3-3

air filter 3-9

bale-clasp SFP 4-55

DC power input cables 2-23

DC power input shelf 2-23, 2-24

DC power shelf 2-20

doors 5-8

fan try 3-5, 3-7

grille 5-3

MSC 4-37

MSCs, FPs, LSPs, PLIMs, components 4-1

PCMCIA card 4-51, 4-52

pillow block 4-16

PLIM 4-42, 4-48

power supply 2-30

power tray air filter 3-12

RP card 4-24, 4-29

SFP modules 4-53

switch fabric card 4-22

wiring block covers 2-22

requirements

airflow exhaust 1-8, 3-3

DC input power connections 2-8

routing system

air filter 3-2

airflow and exhaust 3-3

chassis midplane 1-4

components 1-2

front and back 1-4

switch fabric cards 1-4

RP card

(figure) 4-27

front panel (figure) 4-31

installation guidelines 4-26

installing 4-24, 4-26

LEDs 4-32

monitoring start-up process 4-26

PCMCIA slot door (figure) 4-51

removing 4-24, 4-29

verifying 4-30

verifying installation 4-30

S

safety guidelines 1-8

SFP

bale-clasp (figure) 4-54

installing bale-clasp (figure) 4-55

removing bale-clasp (figure) 4-57

SFP modules

information about 4-4

installing 4-53

removing 4-53

shock and vibration specifications, system A-3

slide-assistance arm 4-11

slide-assistance arm (figure) 4-12

slot numbers 1-5

front (figure) 1-5, 4-25

MSC side 1-6

rear (figure) 1-6, 4-18

specifications

acoustic noise A-3

altitude A-3

chassis A-1

humidity A-3

shock and vibration A-3

temperature A-3

supplemental grounding guidelines 2-2

switch fabric card

(figure) 4-19

front view (figure) 4-23

installing 4-18

installing (figure) 4-20

LEDs 4-24

removing 4-22

removing (figure) 4-23

troubleshooting 4-24

verifying installation 4-23

switch fabric cards 1-4

T

Telcordia GR-1089 NEBS standard 4-29

temperature, system specifications A-3

thermal alarms 4-4

torque ranges, DC power lug A-2

torque values

DC PIM wiring block 2-10

ground wire 2-10

power cables 2-10

troubleshooting

MSC 4-42

PLIM 4-50

RP card installation 4-32

switch fabric card 4-24

V

verifying

MSC installation 4-40

PLIM 4-50

RP card 4-30

switch fabric card installation 4-23

W

warnings

PLIM installation 4-47

wire characteristics, DC power 2-11

wiring block on DC PIM 2-10