Manufacturers for Headend Provisioning Requirements
Table F-1 and Table F-2 provide information on some of the manufacturers, websites, and product offerings required to prepare and provision a North American cable headend site for two-way data. Table F-3 and Table F-4 provide information on some of the manufacturers, websites, and product offerings required to prepare and provision a European cable headend site for two-way data.
North American Channel Plans
Table F-1 Manufacturers for North American Headend Provisioning Requirements
1The lead times for upconverters can run from 2 to 18 weeks. Contact the upconverter manufacturers listed above for current information on lead times.
2The Barco Gemini model upconverter is no longer available or supported by Barco. Note that Barco currently supports the Gemini model stereoscopic projection package that is not related to the previous Gemini upconverter.
4Formerly Hewlett-Packard Test and Measurement Division.
In addition, Cisco recommends the following manufacturers, websites, and product offerings for various measurement devices you will need to prepare and provision a North American cable headend site for two-way data.
Table F-2 Manufacturers for North American Headend Measurement Devices
1The lead times for upconverters can run from 2 to 18 weeks. Contact the upconverter manufacturers listed above for current information on lead times.
2The Barco Gemini model upconverter is no longer available or supported by Barco. Note that Barco currently supports the Gemini model stereoscopic projection package that is not related to the previous Gemini upconverter.
5Formerly Hewlett-Packard Test and Measurement Division.
In addition, Cisco recommends the following manufacturers, websites, and product offerings for various measurement devices you will need to prepare and provision a European cable headend site for two-way data.
Table F-4 Manufacturers for European Headend Measurement Devices