The documentation set for this product strives to use bias-free language. For the purposes of this documentation set, bias-free is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, sexual orientation, socioeconomic status, and intersectionality. Exceptions may be present in the documentation due to language that is hardcoded in the user interfaces of the product software, language used based on RFP documentation, or language that is used by a referenced third-party product. Learn more about how Cisco is using Inclusive Language.
This chapter describes how to update software on the Cisco ASR 903 Series Router.
Note | The Cisco ASR 900 Series Routers supports both consolidated and sub-package mode boot. |
Note | In-Service Software Upgrade (ISSU) is supported only on sub-package on the router. See Understanding In-Service Software Upgrades. |
Sub-Package |
Purpose |
||
---|---|---|---|
RPBase |
Route Switch Processor (RSP) operating system |
||
RPControl |
Control plane processes between IOS process and the rest of the platform. |
||
RPAccess |
Handles security features including Secure Socket Layer (SSL) and Secure Shell (SSH) |
||
RPIOS |
Cisco IOS kernel, which is where IOS features are stored and run.
|
||
FP Pkg |
Controls FP daemons. |
||
IO Pkg |
Controls input/output driver daemons. |
||
LC Base |
Controls basic kernel functions including runtime, initialization scripts, and chassis control daemons. |
Provisioning files manage the boot process when the Cisco ASR 903 Series Router is configured to boot in sub-packages. The provisioning file manages the bootup of each individual sub-package. Provisioning files are extracted automatically when individual sub-package files are extracted from a consolidated package. Provisioning files are not necessary for running the router using the complete consolidated package.
File System |
Description |
---|---|
bootflash: |
The boot flash memory file system on the active RSP. |
cns: |
The Cisco Networking Services file directory. |
nvram: |
Router NVRAM. You can copy the startup configuration to NVRAM or from NVRAM. |
stby-bootflash: |
The boot flash memory file system on the standby RSP. |
stby-harddisk: |
The hard disk file system on the standby RSP. |
stby-usb[0-1]: |
The Universal Serial Bus (USB) flash drive file systems on the standby RSP. |
system: |
The system memory file system, which includes the running configuration. |
tar: |
The archive file system. |
tmpsys: |
The temporary system files file system. |
usb[0-1]: |
The Universal Serial Bus (USB) flash drive file systems on the active RSP. |
If you see a file system not listed in the above table, enter the ? help option or see the copy command reference for additional information on that file system.
Platform |
Image Name |
Software Image |
Individual Sub-package Contents |
DRAM Memory |
---|---|---|---|---|
Cisco ASR 903 Router |
Cisco ASR 903 Series RSP1 UNIVERSAL W/O CRYPTO |
asr903rsp1-universal.version .bin |
asr903rsp1-rpbase.version .pkg |
2 GB (RSP1) 4 GB (RSP1+) |
asr903rsp1-rpcontrol.version .pkg |
||||
asr903rsp1-rpaccess.version .pkg |
||||
asr903rsp1-rpios-universal.version. pkg |
||||
asr903rsp1-espbase.version.pkg |
||||
asr903rsp1-sipbase.version .pkg |
||||
asr903rsp1-sipspa.version .pkg |
||||
asr903rsp1-packages-universal. version.conf |
||||
packages.conf |
||||
Cisco ASR 903 Router |
Cisco ASR 903 Series RSP1 UNIVERSAL NPE |
asr903rsp1-universalk9_npe. version .bin |
asr903-hw-programmables.version . pkg |
2 GB (RSP1) 4 GB (RSP1+) |
asr903rsp1-espbase.version .pkg |
||||
asr903rsp1-packages-universalk9.version .pkg |
||||
asr903rsp1-rpacess.version .pkg |
||||
asr903rsp1-rpbase.version .pkg |
||||
asr903rsp1-rpcontrol.version .pkg |
||||
asr903rsp1-rpios-universalk9_npe.version .pkg |
||||
asr903rsp1-sipbase.version.pkg |
||||
asr903rsp1-sipspa.version.pkg |
||||
packages.conf |
ROMMON Release 15.3(1r)S1 is the recommended release for all ROMMON upgradeable components. For more information about ROMMON images, see Release Notes for the Cisco ASR 903 Router.
You can use the show version installed command to list the installed sub-packages on the router.
Cisco IOS XE 3S Version |
Cisco IOS Version |
---|---|
3.5.0S |
15.2(1)S |
3.5.1S |
15.2(1)S1 |
3.6.0S |
15.2(2)S |
3.6.1S |
15.2(2)S1 |
3.7.0S |
15.2(4)S |
3.8.0S |
15.3(1)S |
3.9.0S |
15.3(2)S |
3.10.0S |
15.3(3)S |
3.11.0S |
15.4(1)S |
3.12.0S |
15.4(2)S |
3.13.0S |
15.4(3)S |
Note | The Cisco ASR 903 Series Router does not support IOS XE versions prior to 3.50S. |
Caution | Do not alter any autogenerated file in the bootflash: directory should not be deleted, renamed, moved, or altered in any way unless directed by customer support; altering these files can have unpredictable consequences for system performance. |
File or Directory |
Description |
||
---|---|---|---|
crashinfo files |
A crashinfo file may appear in the bootflash: file system. Crashinfo files are useful for tuning and troubleshooting, but are not related to router operations: you can erase them without impacting the router’s performance. |
||
core files |
The bootflash/core directory is the storage area for .core files.
|
||
lost+found directory |
This directory is created on bootup if a system check is performed. Its appearance is completely normal and does not indicate any issues with the router. |
||
tracelogs files |
The storage area for trace files is bootflash/tracelogs. Trace files are useful for troubleshooting; you can access trace files using diagnostic mode to gather information related to the IOS failure.
|
Note | For instructions on how to download an image file, see Downloading an Image. In the following example, the image is located in the bootflash: Image/image-name. |
1.
configure
terminal
2.
config-register
3.
exit
4.
request
platform
software
package
expand
file
source-URL
[to
destination-URL] [force] [verbose] [wipe]
5.
request
platform
software
package
expand
file
source-URL
[todestination-URL] [force] [verbose] [wipe]
6.
configure
terminal
7. boot system flash [flash-fs:] [partition-number:] [filename]
8.
exit
9.
copy
running-config
startup-config
10.
reload
The ISSU process allows you to update the router software with minimal service interruption.
The ISSU process requires a minimum of 600 MB available space in bootflash memory.
A single command upgrade allows you to install a complete set of sub-packages using a single command.
The command installs the complete set of packages on the standby RSP, and then perform a rolling reload of the interface modules on the active RSP. After the interface modules are reloaded, an HA switchover is performed and the complete set of sub-packages will be installed on the new (i.e. previously active) RSP. For information about completing a single-command upgrade, see Completing the Single Command Upgrade.
Starting with Cisco IOS XE Release 3.11S and later releases, step-by-step ISSU upgrade is available on the router. For information on performing a step-by-step ISSU, see Performing Step-by-Step ISSU Upgrade.
Note | Ensure that you have chosen an upgrade image that is supported by your current software version. |
A single command upgrade updates the active and standby RSPs with a single IOS command. Follow these steps to complete the one-shot upgrade.
1. Verify the chassis is booted using sub-package mode and in hot standby state, else set the router to sub-package mode.
2. Download the new image file from Cisco.com on the chassis.
3. Open a console session to the active RSP.
4. Copy the new consolidated image file to the active image bootflash directory such that the new image file is in the same location as the existing image file.
5.
configure
terminal
6.
redundancy
7.
mode
sso
8.
end
9. Confirm that the router has reached SSO state
10.
copy
running-config
startup-config
Command or Action | Purpose | |||||
---|---|---|---|---|---|---|
Step 1 | Verify the chassis is booted using sub-package mode and in hot standby state, else set the router to sub-package mode. |
For more information, see Setting the Router to Boot in Sub-Package Mode. | ||||
Step 2 | Download the new image file from Cisco.com on the chassis. |
For more information about downloading Cisco software image, see Using Cisco IOS XE Software in Cisco ASR 903 Router Chassis Software Configuration Guide. | ||||
Step 3 | Open a console session to the active RSP. |
For instructions on how to open a console session, see Console Port, Telnet, and SSH Handling in Cisco ASR 903 Router Chassis Software Configuration Guide. . | ||||
Step 4 | Copy the new consolidated image file to the active image bootflash directory such that the new image file is in the same location as the existing image file. |
| ||||
Step 5 | configure
terminal
Example: Router# configure terminal |
Enters configuration mode. | ||||
Step 6 | redundancy
Example: Router(config)# redundancy Router(config-red)# |
Enters redundancy configuration mode. | ||||
Step 7 | mode
sso
Example: Router(config-red)# mode sso |
Sets the router in SSO redundancy mode. | ||||
Step 8 | end
Example: Router(config)# end |
Exits configuration mode and returns to the EXEC command prompt. | ||||
Step 9 | Confirm that the
router has reached SSO state
Example: *Jan 12 17:52:26.516: %RF-5-RF_TERMINAL_STATE: Terminal state reached for (SSO) |
Wait for the output before proceeding. | ||||
Step 10 | copy
running-config
startup-config
Example: Router# copy running-config startup-config |
Saves the configuration. |
1.
request platform software package install node file file-URL [interface-module-delay delay]
2. Wait for the router messages
3. Wait for original active RSP to reboot.
4. Switch to the new active console.
5. Wait for new active console to return to SSO state
Command or Action | Purpose | |||
---|---|---|---|---|
Step 1 | request platform software package install node file file-URL [interface-module-delay delay] Example: Router# request platform software package install node file bootflash:Image/asr903rsp1-adventerprisek9.upgrade.bin interface-module-delay 160 |
| ||
Step 2 | Wait for the router messages |
The router displays a series of STAGE/SUCCESS messages. For sample output of a single command upgrade, see Example: Single Command Software Upgrade. | ||
Step 3 | Wait for original active RSP to reboot. |
The active RSP reboots and returns to the console prompt | ||
Step 4 | Switch to the new active console. | |||
Step 5 | Wait for new active console to return to SSO state Example: *Jan 12 17:52:26.516: %RF-5-RF_TERMINAL_STATE: Terminal state reached for (SSO) | Confirms that the router has reached SSO state; wait for this output before proceeding |
Step 1 | Verify the chassis is booted using sub-package mode and in hot standby state, else set the router to sub-package mode, see Setting the Router to Boot in Sub-Package Mode. | ||
Step 2 | Download the image on the chassis. | ||
Step 3 | Extract the sub-package images from the asr903rsp1-adventerprisek9.upgrade.bin image on the active RSP using the request platform software package expand file bootflash:Image/ asr903rsp1-adventerprisek9.upgrade.bin command. | ||
Step 4 | Extract the sub-package image from the asr903rsp1-adventerprisek9.upgrade.bin image on the standby RSP using the request platform software package expand file stby-bootflash:Image/asr903rsp1-adventerprisek9.upgrade.bin command. | ||
Step 5 | Upgrade all the sub-packages on the standby RSP using the request platform software package install rp stdby_slot_num file stby-bootflash:asr903rsp1-*.upgrade.pkg command. | ||
Step 6 | Reload the standby module from active RP using the hw-module slot stdby_slot_num reload command and wait for the standby to reach Hot standby state. | ||
Step 7 |
Execute the request platform software package install file rp active_slot_num file bootflash:asr903rsp1-sipspa.upgrade.pkg slot 0 bay im_slot_num force command for each IM present in the router.
| ||
Step 8 |
Upgrade all the sub-packages on the active RSP using the request platform software package install rp active_slot_num file bootflash:asr903rsp1-*.upgrade.pkg command.
| ||
Step 9 |
Perform a switchover. Wait for the new standby RSP module to reach hot standby state.
The latest image is upgraded on the router. |
Caution | To avoid actions that might make your system unable to boot, read this entire section before starting the upgrade. |
Step 1 |
Check the RSP bootup ROMMON region (ROM0 or ROM1). The example, shows the RSP boots up from ROM0 region. Example: System Bootstrap, Version 15.2(1r)S1, RELEASE SOFTWARE (fc1) Technical Support: http://www.cisco.com/techsupport Copyright (c) 2011 by cisco Systems, Inc. Compiled Wed 07-Dec-11 07:33 by tinhuang Current image running: Boot ROM0 | ||
Step 2 |
Copy the ROMMON image to the bootflash on the active and standby RSP. Example: copy bootflash:asr903-rommon.153-1r.S1.pkg | ||
Step 3 |
Use the upgrade rom-monitor filename bootflash:asr903-rommon.153-1r.S1.pkg R0 command to upgrade the version.
| ||
Step 4 |
Upgrade the ROMMON on the Standby RSP (for High Availability) using upgrade rom-monitor filename bootflash:asr903-rommon.153-1r.S1.pkg R1 command.
| ||
Step 5 |
Reload the router. Example: System Bootstrap, Version 15.2(1r)S1, RELEASE SOFTWARE (fc1) Technical Support: http://www.cisco.com/techsupport Copyright (c) 2011 by cisco Systems, Inc. Compiled Wed 07-Dec-11 07:33 by tinhuang Current image running: Boot ROM0 Last reset cause: RSP-Board UEA platform with 2097152 Kbytes of main memory Rommon upgrade requested Flash upgrade reset 1 in progress ....... System Bootstrap, Version 12.2(20120514:121217) [npenumar-pegasus_rommon_02 183], DEVELOPMENT SOFTWARE Copyright (c) 1994-2008 by cisco Systems, Inc. Compiled Fri 15-Jun-12 11:45 by ccai Current image running: *Upgrade in progress* Boot ROM1 Last reset cause: BootRomUpgrade UEA platform with 2097152 Kbytes of main memory | ||
Step 6 |
Reload the router again to confirm bootup from upgraded ROMMON region ROM1. Example: System Bootstrap, Version 15.2(1r)S1, RELEASE SOFTWARE (fc1) Technical Support: http://www.cisco.com/techsupport Copyright (c) 2011 by cisco Systems, Inc. Compiled Fri 15-Jun-12 11:45 by ccai Current image running: Boot ROM1 | ||
Step 7 |
Repeat Step 3 to Step 6 to update the other region on the RSP (ROM0) region in this procedure).
|
Router# show platform Chassis type: ASR-903 Slot Type State Insert time (ago) --------- ------------------- --------------------- ----------------- 0/0 A900-IMA1X ok 04:48:07 0/1 A900-IMA1X ok 04:43:42 0/4 A900-IMA8T ok 05:18:21 0/5 A900-IMA8T ok 05:18:21 R0 A903-RSP1A-55 ok, active 05:23:11 R1 A903-RSP1A-55 ok, standby 05:23:11 F0 ok, active 05:23:11 F1 ok, standby 05:23:11 P0 A900-PWR550-D ok 05:20:02 P1 A900-PWR550-D ok 05:19:55 P2 A903-FAN ok 05:19:45 Slot CPLD Version Firmware Version --------- ------------------- --------------------------------------- R0 11102133 15.3(1r)S1 R1 11102133 15.3(1r)S1 F0 11102133 15.3(1r)S1 F1 11102133 15.3(1r)S1
Router# request platform software package install node file bootflash:XE371_k9_0810.bin interface-module-delay 150 NOTE: Currently node has booted from a provisioning file NOTE: Going to start a dual rp sub-packages node ISSU install --- Starting initial file path checking --- Copying bootflash:XE371_k9_0810.bin to stby-bootflash:XE371_k9_0810.bin Finished initial file path checking --- Starting config-register verification --- Finished config-register verfication --- Starting image file expansion --- Expanding image file: bootflash:XE371_k9_0810.bin Image file expanded and copied Expanding image file: stby-bootflash:XE371_k9_0810.bin Image file expanded and copied Finished image file expansion STAGE 1: Installing software on standby RP ========================================== --- Starting local lock acquisition on R0 --- Finished local lock acquisition on R0 --- Starting installation state synchronization --- Finished installation state synchronization --- Starting local lock acquisition on R1 --- Finished local lock acquisition on R1 --- Starting file path checking --- Finished file path checking --- Starting image file verification --- Checking image file names Locating image files and validating name syntax Found asr903rsp1-espbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpaccess.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpcontrol.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpios-universalk9_npe.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-sipbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-sipspa.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Verifying image file locations Inspecting image file types WARNING: In-service installation of IOSD package WARNING: requires software redundancy on target RP WARNING: or on-reboot parameter WARNING: Automatically setting the on-reboot flag WARNING: In-service installation of RP Base package WARNING: requires software reboot of target RP Processing image file constraints Creating candidate provisioning file Finished image file verification --- Starting candidate package set construction --- Verifying existing software set Processing candidate provisioning file Constructing working set for candidate package set Constructing working set for running package set Checking command output Constructing merge of running and candidate packages Checking if resulting candidate package set would be complete Finished candidate package set construction --- Starting compatibility testing --- Determining whether candidate package set is compatible Determining whether installation is valid Determining whether installation is valid ... skipped Verifying image type compatibility Checking IPC compatibility for candidate software Checking candidate package set infrastructure compatibility Checking infrastructure compatibility with running software Checking infrastructure compatibility with running software ... skipped Checking package specific compatibility Finished compatibility testing --- Starting list of software package changes --- Old files list: Removed asr903rsp1-espbase.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpaccess.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpbase.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpcontrol.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpios-universalk9_npe.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-sipbase.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-sipspa.2012-08-12_15.26_amprajap.pkg New files list: Added asr903rsp1-espbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpaccess.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpcontrol.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpios-universalk9_npe.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-sipbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-sipspa.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Finished list of software package changes --- Starting commit of software changes --- Updating provisioning rollback files Creating pending provisioning file Committing provisioning file Finished commit of software changes SUCCESS: Software provisioned. New software will load on reboot. STAGE 2: Restarting standby RP ============================== --- Starting standby reload --- Finished standby reload --- Starting wait for Standby RP to reach terminal redundancy state --- Finished wait for Standby RP to reach terminal redundancy state STAGE 3: Installing sipspa package on local RP ============================================== --- Starting local lock acquisition on R0 --- Finished local lock acquisition on R0 --- Starting installation state synchronization --- Finished installation state synchronization --- Starting file path checking --- Finished file path checking --- Starting image file verification --- Checking image file names Locating image files and validating name syntax Found asr903rsp1-sipspa.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Verifying image file locations Inspecting image file types Processing image file constraints Creating candidate provisioning file Finished image file verification --- Starting candidate package set construction --- Verifying existing software set Processing candidate provisioning file Constructing working set for candidate package set Constructing working set for running package set Checking command output Constructing merge of running and candidate packages Checking if resulting candidate package set would be complete Finished candidate package set construction --- Starting compatibility testing --- Determining whether candidate package set is compatible WARNING: WARNING: Candidate software combination not found in compatibility database WARNING: Determining whether installation is valid WARNING: WARNING: Candidate software combination not found in compatibility database WARNING: WARNING: WARNING: Candidate software combination not found in compatibility database WARNING: Software sets are identified as compatible Verifying image type compatibility Checking IPC compatibility with running software Checking candidate package set infrastructure compatibility Checking infrastructure compatibility with running software Checking package specific compatibility Finished compatibility testing --- Starting impact testing --- Checking operational impact of change Finished impact testing --- Starting list of software package changes --- Old files list: Removed asr903rsp1-sipspa.2012-08-12_15.26_amprajap.pkg New files list: Added asr903rsp1-sipspa.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Finished list of software package changes --- Starting commit of software changes --- Updating provisioning rollback files Creating pending provisioning file Committing provisioning file Finished commit of software changes --- Starting analysis of software changes --- Finished analysis of software changes --- Starting update running software --- Blocking peer synchronization of operating information Creating the command set placeholder directory Finding latest command set Finding latest command shortlist lookup file Finding latest command shortlist file Assembling CLI output libraries Assembling CLI input libraries Assembling Dynamic configuration files Applying interim IPC and database definitions Replacing running software Replacing CLI software Restarting software Restarting IM: 0/0 Skipping IM reload for Ethernet IM Restarting IM: 0/1 Skipping IM reload for Ethernet IM Restarting IM: 0/2 Skipping IM reload for Ethernet IM Restarting IM: 0/3 Skipping IM reload for Ethernet IM Restarting IM: 0/4 Skipping IM reload for Ethernet IM Applying final IPC and database definitions Generating software version information Notifying running software of updates Unblocking peer synchronization of operating information Unmounting old packages Cleaning temporary installation files Finished update running software SUCCESS: Finished installing software. STAGE 4: Installing software on active RP ========================================= --- Starting local lock acquisition on R0 --- Finished local lock acquisition on R0 --- Starting installation state synchronization --- Finished installation state synchronization --- Starting file path checking --- Finished file path checking --- Starting image file verification --- Checking image file names Locating image files and validating name syntax Found asr903rsp1-espbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpaccess.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpcontrol.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-rpios-universalk9_npe.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-sipbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Found asr903rsp1-sipspa.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Verifying image file locations Inspecting image file types WARNING: In-service installation of IOSD package WARNING: requires software redundancy on target RP WARNING: or on-reboot parameter WARNING: Automatically setting the on-reboot flag WARNING: In-service installation of RP Base package WARNING: requires software reboot of target RP Processing image file constraints Creating candidate provisioning file Finished image file verification --- Starting candidate package set construction --- Verifying existing software set Processing candidate provisioning file Constructing working set for candidate package set Constructing working set for running package set Checking command output Constructing merge of running and candidate packages Checking if resulting candidate package set would be complete Finished candidate package set construction --- Starting compatibility testing --- Determining whether candidate package set is compatible Determining whether installation is valid Determining whether installation is valid ... skipped Verifying image type compatibility Checking IPC compatibility for candidate software Checking candidate package set infrastructure compatibility Checking infrastructure compatibility with running software Checking infrastructure compatibility with running software ... skipped Checking package specific compatibility Finished compatibility testing --- Starting list of software package changes --- Old files list: Removed asr903rsp1-espbase.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpaccess.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpbase.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpcontrol.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-rpios-universalk9_npe.2012-08-12_15.26_amprajap.pkg Removed asr903rsp1-sipbase.2012-08-12_15.26_amprajap.pkg New files list: Added asr903rsp1-espbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpaccess.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpcontrol.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-rpios-universalk9_npe.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Added asr903rsp1-sipbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Finished list of software package changes --- Starting commit of software changes --- Updating provisioning rollback files Creating pending provisioning file Committing provisioning file Finished commit of software changes SUCCESS: Software provisioned. New software will load on reboot. STAGE 5: Restarting active RP (switchover to stdby) =================================================== --- Starting active reload --- Finished active reload SUCCESS: node ISSU finished successfully. RUDY-1# RUDY-1#Aug 24 07:54:41.715 R0/0: %PMAN-5-EXITACTION: Process manager is exiting: reload fru action requested System Bootstrap, Version 15.3(1r)S1, RELEASE SOFTWARE (fc1) Technical Support: http://www.cisco.com/techsupport Copyright (c) 2012 by cisco Systems, Inc. Compiled Tue 26-Jun-12 12:42 by ccai Current image running: Boot ROM0UEA platform with 3670016 Kbytes of main memory Located packages.conf Image size 7519 inode num 38, bks cnt 2 blk size 8*512 # Located asr903rsp1-rpbase.BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021.pkg Image size 34216240 inode num 90631, bks cnt 8354 blk size 8*512 ############################################################################# ############################################################################################ ############################################################################################# ######################################################################### Boot image size = 34216240 (0x20a1930) bytes Package header rev 0 structure detected Calculating SHA-1 hash...done validate_package: SHA-1 hash: calculated e7674970:dbc1eb86:325219c7:b3da0e0f:077e5e4d expected e7674970:dbc1eb86:325219c7:b3da0e0f:077e5e4d Image validated %IOSXEBOOT-4-BOOT_ACTIVITY_LONG_TIME: (rp/0): load_crash_kernel took: 2 seconds, expected max time 2 seconds %IOSXEBOOT-4-DEBUG_CONF: (rp/0): File /bootflash/debug.conf is absent, ignoring %IOSXEBOOT-4-BOOT_ACTIVITY_LONG_TIME: (rp/0): Chassis initialization took: 26 seconds, expected max time 10 seconds %IOSXEBOOT-4-BOOT_ACTIVITY_LONG_TIME: (rp/0): upgrade hw-programmable took: 2 seconds, expected max time 2 seconds Restricted Rights Legend Use, duplication, or disclosure by the Government is subject to restrictions as set forth in subparagraph (c) of the Commercial Computer Software - Restricted Rights clause at FAR sec. 52.227-19 and subparagraph (c) (1) (ii) of the Rights in Technical Data and Computer Software clause at DFARS sec. 252.227-7013. cisco Systems, Inc. 170 West Tasman Drive San Jose, California 95134-1706 Cisco IOS Software, IOS-XE Software (PPC_LINUX_IOSD-UNIVERSALK9_NPE-M), Experimental Version 15.2(20120810:081250) [v152_4_s_xe37_throttle-BLD-BLD_V152_4_S_XE37_THROTTLE_LATEST_20120810_070021-ios 131] Copyright (c) 1986-2012 by Cisco Systems, Inc. Compiled Fri 10-Aug-12 03:50 by mcpre Cisco IOS-XE software, Copyright (c) 2005-2012 by cisco Systems, Inc. All rights reserved. Certain components of Cisco IOS-XE software are licensed under the GNU General Public License ("GPL") Version 2.0. The software code licensed under GPL Version 2.0 is free software that comes with ABSOLUTELY NO WARRANTY. You can redistribute and/or modify such GPL code under the terms of GPL Version 2.0. For more details, see the documentation or "License Notice" file accompanying the IOS-XE software, or the applicable URL provided on the flyer accompanying the IOS-XE software. This product contains cryptographic features and is subject to United States and local country laws governing import, export, transfer and use. Delivery of Cisco cryptographic products does not imply third-party authority to import, export, distribute or use encryption. Importers, exporters, distributors and users are responsible for compliance with U.S. and local country laws. By using this product you agree to comply with applicable laws and regulations. If you are unable to comply with U.S. and local laws, return this product immediately. A summary of U.S. laws governing Cisco cryptographic products may be found at: http://www.cisco.com/wwl/export/crypto/tool/stqrg.html If you require further assistance please contact us by sending email to export@cisco.com. cisco ASR-903 (RSP1) processor with 540359K/6147K bytes of memory. Processor board ID FOX1518P0GP 32768K bytes of non-volatile configuration memory. 3670016K bytes of physical memory. 1328927K bytes of SD flash at bootflash:. Press RETURN to get started!
Related Topic |
Document Title |
---|---|
Cisco IOS master command list |
Cisco IOS Master Command List , All Releases |
Cisco IOS High Availability commands |
Cisco IOS High Availability Command Reference |
Standard |
Title |
---|---|
No new or modified standards are supported, and support for existing standards has not been modified. |
-- |
MIB |
MIBs Link |
---|---|
No new or modified MIBs are supported, and support for existing MIBs has not been modified. Cisco ASR 900 Series Aggregation Services Routers MIB Specifications Guide |
To locate and download MIBs for selected platforms, Cisco IOS releases, and feature sets, use Cisco MIB Locator found at the following URL: http://www.cisco.com/go/mibs Cisco ASR 900 Series Aggregation Services Routers MIB Specifications Guide |
RFC |
Title |
---|---|
No new or modified RFCs are supported, and support for existing RFCs has not been modified. |
-- |
Description |
Link |
---|---|
The Cisco Support and Documentation website provides online resources to download documentation, software, and tools. Use these resources to install and configure the software and to troubleshoot and resolve technical issues with Cisco products and technologies. Access to most tools on the Cisco Support and Documentation website requires a Cisco.com user ID and password. |
The following table provides release information about the feature or features described in this module. This table lists only the software release that introduced support for a given feature in a given software release train. Unless noted otherwise, subsequent releases of that software release train also support that feature.
Use Cisco Feature Navigator to find information about platform support and Cisco software image support. To access Cisco Feature Navigator, go to www.cisco.com/go/cfn. An account on Cisco.com is not required.
Feature Name |
Releases |
Feature Information |
---|---|---|
In Service Software Upgrade |
Cisco IOS XE Release 3.6S |
In Cisco IOS XE Release 3.6S, support was added for the Cisco ASR 903 Router. |
Step-by-Step ISSU Upgrade |
Cisco IOS XE Release 3.11S |
In Cisco IOS XE Release 3.11S, step-by-step ISSU upgrade was supported on the Cisco ASR 900 Series Router. |