Powering Up the Cisco cBR Chassis
Powering Up the Cisco cBR
Before You BeginProcedureAfter all the interfaces and other cables are connected, perform a visual check of all connections and check that:
Step 1 Make sure the chassis ground connection is attached. Step 2 Push the toggle switch on the FPIM (AC or DC) on the rear of the chassis to ON position.
What to Do Next
Ensure the POWER ENABLE LED on the FPIM illuminates green.
Verify if the LEDs on the Power Module indicate input voltage presence within correct range.
Copyright © 2015, Cisco Systems, Inc. All rights reserved.