Contents

Safety Overview

Parts List

Required Tools

Installation Guidelines

Shutting Down the System

Replacing the Panel Safety Cover

Replacing the Fan Tray

Removing the Fan Tray

Installing the High Speed Fan Tray

Replacing the Power Supply

Removing an AC-Input Power Supply

Installing the 3000 W AC-Input Power Supply

Connecting Power to the Fan Tray

Installing the Fan Tray Power Cable for AC-Input Systems

Connecting Site Power to the Fan Tray for DC-Input Systems

Replacing the Supervisor Engine

Removing the Supervisor Engine

Installing the Supervisor Engine

Powering Up the System

AC-Input Systems

DC-Input Systems

Verifying Installation

Related Documentation

Obtaining Documentation and Submitting a Service Request


Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note


Product Number: WS-6509-NEB-UPGRD=

This publication describes how to upgrade your Catalyst 6509-NEB switch or Cisco OSR-7609 Router to use the Supervisor Engine 720 and the Supervisor Engine 32.


Note AC-Input Systems—If your switch or router is using an AC-input power supply, you are required to install the WS-CAC-3000W power supply. The 3000 W AC-input provides a power output to power the fan tray.



Note DC-Input Systems—If your switch or router is using a DC-input power supply, you are required to install the WS-CDC-2500W or PWR-4000-DC power supply. You must provide a separate, direct connection to power the fan tray. Each input of the fan tray is rated 10 A @ -40 to -60 VDC.



Caution It is important that you follow the steps in this document in the order they are presented.

Contents

This publication consists of the following sections:

Safety Overview

Parts List

Required Tools

Installation Guidelines

Shutting Down the System

Replacing the Panel Safety Cover

Replacing the Fan Tray

Replacing the Power Supply

Connecting Power to the Fan Tray

Replacing the Supervisor Engine

Powering Up the System

Verifying Installation

Related Documentation

Obtaining Documentation and Submitting a Service Request

Safety Overview

Safety warnings appear throughout this publication in procedures that, if performed incorrectly, may harm you. A warning symbol precedes each warning statement.

Warning


IMPORTANT SAFETY INSTRUCTIONS

This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for preventing accidents. Use the statement number provided at the end of each warning to locate its translation in the translated safety warnings that accompanied this device. Statement 1071

SAVE THESE INSTRUCTIONS



Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003



Warning This unit might have more than one power supply connection. All connections must be removed to de-energize the unit. Statement 1028



Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Statement 1030



Warning Hazardous voltage or energy is present on the backplane when the system is operating. Use caution when servicing. Statement 1034



Warning This product requires short-circuit (overcurrent) protection, to be provided as part of the building installation. Install only in accordance with national and local wiring regulations. Statement 1045



Warning When installing or replacing the unit, the ground connection must always be made first and disconnected last. Statement 1046


Parts List

The following items are included in the upgrade kit:

One high speed fan tray

The high speed fan tray provides additional cooling for the Supervisor Engine 720 and the Supervisor Engine 32.

The high speed fan tray requires external power, either from the 3000 W AC-input power supply or from an external DC power source. The fan tray ships with power wires secured at each terminal block. Use these wires to connect the fan tray to the 3000 W AC-input power supply using the supplied cable, or remove them to connect to a DC power source.

One panel safety cover

The panel safety cover provides increased chassis airflow.

Two fan tray power cables (for AC-input systems)

The fan tray power cable provides a connection between the fan tray and the 3000 W AC-input power supply. Two cables are provided for systems with redundant power supplies.

Required Tools

These tools are required to perform the installation:

Number 1 Phillips-head screwdriver

Number 2 Phillips-head screwdriver

Flat-blade screwdriver (for DC-input systems)

Installation Guidelines

Follow these guidelines when upgrading the chassis:

If your switch or router is using an AC-input power supply, you are required to install the WS-CAC-3000W power supply. The 3000 W AC-input provides a power output to power the fan tray.

If your switch or router is using a DC-input power supply, you are required to install the WS-CDC-2500W or PWR-4000-DC power supply. You must provide a separate, direct connection to power the fan tray. Each input of the fan tray is rated 10 A @ -40 to -60 VDC.

Observe the following cautions:


Caution It is important that you follow the steps in this document in the order they are presented.

Caution Always use an ESD wrist strap when handling modules or coming into contact with internal components.

Caution Use both hands to install and remove power supplies. Each Catalyst 6500 series AC-input power supply weighs between 22 pounds (9.9 kg) and 28 pounds (12.6 kg).

Caution Do not exert too much pressure on the ejector levers. They will bend and be damaged.

Caution In a system with dual power supplies, connect each power supply to a separate input source. In case of a power source failure, the second source will most likely still be available.

Shutting Down the System

To perform the upgrade, you must shut down the system.

Before you shut down the system, you should first upload the current configuration to a server. This saves time when bringing the module back online. You can recover the configuration by downloading it from the server to the nonvolatile memory of the supervisor engine. For more information, refer to the "Working with Configuration Files" chapter in the Catalyst 6500 Series Software Configuration Guide.

To properly shut down the system, follow these steps:


Step 1 Upload the current configuration to a server. On any modules running Cisco IOS, save the running configuration.


Warning Before working on a system that has an on/off switch, turn OFF the power and unplug the power cord. Statement 1



Warning This unit might have more than one power supply connection. All connections must be removed to de-energize the unit. Statement 1028


Step 2 Depending on how your system is powered, perform one of the two sets of substeps below.

AC-Input Systems

a. Turn the power switch to the Off (0) position on each power supply. Turning the power switch off also disengages a pawl that unlocks the power supply from the chassis.

b. Disconnect the power cord from the power source.

c. Loosen the screw on the cable retention device, and disconnect the power cord from the power supply being removed.


Note The AC power cord for the 4000 W power supply is hard wired and cannot be removed from the supply.



Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003


DC-Input Systems

a. Verify that power is off to the DC circuit for each power supply. As an added safety precaution, you should secure the source DC circuit breaker switch in the OFF position with electrical tape.

b. Turn the power switch to the Off (0) position on each power supply. Turning the power switch off also disengages a pawl that unlocks the power supply from the chassis.


Replacing the Panel Safety Cover

This section describes how to remove and install the panel safety cover for the Catalyst 6509-NEB switch and Cisco OSR-7609 Router. A number 1 Phillips-head screwdriver is required to perform this procedure.


Caution Always use an ESD wrist strap when handling modules or coming into contact with internal components.


Warning Hazardous voltage or energy is present on the backplane when the system is operating. Use caution when servicing. Statement 1034


To remove the panel safety cover, perform these steps:


Step 1 Use a number 1 Phillips-head screwdriver to remove the 8 panel screws, 4 each located along the top and bottom of the chassis. (See Figure 1.) Set the screws aside.

Step 2 Grasp the panel handle and pull the panel away from the chassis.

Figure 1 Removing the Panel Safety Cover

Step 3 On the new panel safety cover, grasp the panel handle and press the panel into place, starting at the bottom of the chassis and working up. Be careful not to damage the EMI gasket.

Step 4 Use a number 1 Phillips-head screwdriver to install the 8 panel screws, 4 each located along the top and bottom of the chassis. (See Figure 2.)

Step 5 Proceed to the "Replacing the Fan Tray" section to replace the fan tray.

Figure 2 Installing the Panel Safety Cover


Replacing the Fan Tray

This section describes how to remove and install the fan tray for the Catalyst 6509-NEB switch and Cisco OSR-7609 Router. The standard fan tray (WS-C6509-NEB-FAN) must be removed and replaced with the high-speed fan tray (WS-C6509-NEB-FAN2). A flat-blade or number 2 Phillips-head screwdriver is required to perform this procedure.

Removing the Fan Tray


Warning When removing the fan tray, keep your hands and fingers away from the spinning fan blades. Let the fan blades completely stop before you remove the fan tray. Statement 258


To remove the standard fan tray (WS-C6509-NEB-FAN), follow these steps:


Step 1 Use a flat-blade or number 2 Phillips-head screwdriver to loosen the two captive installation screws on the fan tray by turning them counterclockwise. (See Figure 3.)

Figure 3 Removing the Fan Tray

Step 2 Grasp the fan tray handle with one hand and pull the fan tray outward about 1 inch; rock it gently, if necessary, to unseat the power connector from the backplane. Wait for the fans to stop spinning.

Step 3 Once the fans have stopped spinning, pull the fan tray out further and support the underside of the fan tray with the other hand.

Step 4 Pull the fan tray clear of the chassis, and put it in a safe place.


Installing the High Speed Fan Tray

To install the high speed fan tray (WS-C6509-NEB-FAN2), follow these steps:


Step 1 Hold the fan tray with the fans facing down and the FAN FAIL LED on the right. (See Figure 4.)

Figure 4 Installing the High Speed Fan Tray

Step 2 Place the fan tray into the front chassis cavity so that it rests on the chassis, and then lift the fan tray up slightly, aligning the top and bottom chassis guides.

Step 3 Push the fan tray into the chassis until the power connector seats in the backplane and the captive installation screws make contact with the chassis.

Step 4 Use a flat-blade or number 2 Phillips-head screwdriver to tighten the captive installation screws.

Step 5 Proceed to the "Replacing the Power Supply" section to replace the power supply.


Replacing the Power Supply


Note DC-input systems—See the "Connecting Site Power to the Fan Tray for DC-Input Systems" section to connect site power to the high speed fan tray.


This section describes how to remove and install AC-input power supplies for the Catalyst 6509-NEB switch and Cisco OSR-7609 router.

Removing an AC-Input Power Supply


Warning Hazardous voltage or energy is present on the backplane when the system is operating. Use caution when servicing. Statement 1034


To remove an AC-input power supply, follow these steps:


Step 1 Loosen the captive installation screw. (See Figure 5.)


Caution Use both hands to install and remove power supplies. Each Catalyst 6500 series AC-input power supply weighs between 22 pounds (9.9 kg) and 28 pounds (12.6 kg).

Step 2 Grasp the power supply handle with one hand, and slide the power supply part of the way out of the chassis. Place your other hand underneath the power supply, as shown in Figure 6, and slide the power supply completely out of the chassis.


Figure 5 AC-Input Power Supply Front Panel

Figure 6 Removing an AC-Input Power Supply

Installing the 3000 W AC-Input Power Supply


Caution Use both hands to install and remove power supplies. Each Catalyst 6500 series AC-input power supply weighs between 22 pounds (9.9 kg) and 28 pounds (12.6 kg).

To install the 3000 W AC-input power supply, follow these steps:


Step 1 Ensure that the system (earth) ground connection has been made. For ground connection instructions, refer to the installation guide for your hardware platform.

Step 2 Verify that the power switch is in the Off (0) position on the power supply you are installing. (See Figure 7.)

Figure 7 3000 Watt AC-Input Power Supply Front Panel

Step 3 Grasp the power supply handle with one hand. Place your other hand underneath the power supply, as shown in Figure 8. Slide the power supply into the power supply bay. Make sure that the power supply is fully seated in the bay.

Figure 8 Installing the 3000 W Power Supply

Step 4 Tighten the power supply captive installation screw. (See Figure 7.)

Step 5 If you have a redundant power supply, install it now following the steps in this section.

Step 6 Proceed to the "Connecting Power to the Fan Tray" section to connect power to the high speed fan tray.


Connecting Power to the Fan Tray

The high-speed fan tray requires external power, either from the 3000 W AC-input power supply or from an external DC power source. The fan tray ships with power wires secured at each terminal block.

If you are using the 3000 W AC-input power supply, use the supplied cables to connect the fan tray wires to the power supply.

If you are using a DC-input power supply, remove the wires from the fan tray and connect directly to a DC power source.

The following sections describe how to connect power to the fan tray:

Installing the Fan Tray Power Cable for AC-Input Systems

Connecting Site Power to the Fan Tray for DC-Input Systems

Installing the Fan Tray Power Cable for AC-Input Systems


Note The fan tray ships with power wires secured at each terminal block. Use these wires to connect the fan tray to the 3000 W AC-input power supply using the supplied cables. If you have redundant power supplies, repeat the steps in this section for the redundant power supply.


To connect the high speed fan tray to the 3000 W AC-input power supply, follow these steps:


Step 1 Connect the female end of the supplied power cable (see Figure 9) to the fan tray wire connector. Press the two ends together until you hear a click.

Figure 9 Cable Connectors

Step 2 On the power supply, loosen the thumb screw on the external power connector cover and lift up the cover. (See Figure 10.)

Figure 10 External Power Connector Cover

Step 3 Connect the male end of the supplied power cable to the female end of the external power connector on the power supply until you hear a click.

Step 4 If you have redundant power supplies, repeat the steps in this section for the redundant power supply.


Connecting Site Power to the Fan Tray for DC-Input Systems


Note To provide redundancy, you may choose to connect each fan terminal block to a separate power source.



Note Each input of the fan tray is rated 10 A @ -40 to -60 VDC.



Warning This product requires short-circuit (overcurrent) protection, to be provided as part of the building installation. Install only in accordance with national and local wiring regulations. Statement 1045



Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003


To connect the high speed fan tray to an external DC power source, follow these steps:


Step 1 Locate the terminal block covers on the fan tray. (See Figure 11.)

Figure 11 Terminal Block Covers on Fan Tray

Step 2 The terminal block cover is held in place by two clips inserted into the fan tray front panel. Press the bottom of the terminal block cover, lift the cover up, and remove the cover. (See Figure 12.)

Figure 12 Removing the Terminal Block Cover

Step 3 With a flat blade screwdriver, disconnect the input wires from the terminal block. (See Figure 13.)

Figure 13 Input Wire Connections on the Terminal Block

Step 4 Connect the DC-input wires to the terminal block (see Figure 14) in this order:

Ground

Negative (-)

Positive (+)

Figure 14 DC-Input Wire Connections on the Terminal Block


Warning When installing or replacing the unit, the ground connection must always be made first and disconnected last. Statement 1046


Step 5 After ensuring that all wire connections are secure, reinstall the terminal block cover.


Replacing the Supervisor Engine

Before you can power up the system, you need to remove the supervisor engine from slot 1 (if a redundant supervisor engine is present, remove it from slot 2) and install the Supervisor Engine 720 or the Supervisor Engine 32 in slot 5 or 6.

Removing the Supervisor Engine

This section describes how to remove an existing supervisor engine from a chassis slot.

To remove a supervisor engine from the chassis, perform these steps:


Step 1 Disconnect any network interface cables attached to the supervisor engine.

Step 2 Verify that the captive installation screws on all of the modules in the chassis are tight. This step assures that the space created by the removed supervisor engine is maintained.


Note If the captive installation screws are loose, the electromagnetic interference (EMI) gaskets on the installed modules will push the modules toward the open slot, reducing the opening size and making it difficult to install the replacement module.


Step 3 Loosen the two captive installation screws on the supervisor engine.

Step 4 Place your thumbs on the ejector levers located at the top and bottom of the supervisor engine, and simultaneously rotate the levers outward to unseat the supervisor engine from the backplane connector.

Step 5 Grasp the edges of the supervisor engine, and slide the supervisor engine straight out of the slot. Do not touch the module circuitry.

Step 6 Place the supervisor engine on an antistatic mat or antistatic foam.

Step 7 If the slot is to remain empty, install a module filler plate to keep dust out of the chassis and to maintain proper airflow through the chassis.


Installing the Supervisor Engine

This section describes how to install the Supervisor Engine 720 or the Supervisor Engine 32 in the Catalyst 6509-NEB switch and the Cisco OSR-7609 Router.


Caution To prevent ESD damage, handle modules by the carrier edges only.


Note The Supervisor Engine 720 or Supervisor Engine 32 must be installed in slot 5 or 6 of the Catalyst 6509NEB or Cisco OSR7609 chassis.


To install the supervisor engine in the chassis, perform these steps:


Step 1 Choose a slot for the supervisor engine.

Step 2 Verify that there is enough clearance to accommodate any interface equipment that you will connect directly to the supervisor engine ports. If possible, place modules between empty slots that contain only module filler plates.

Step 3 Verify that the captive installation screws are tightened on all modules installed in the chassis. This assures that the EMI gaskets on all modules are fully compressed in order to maximize the opening space for the new module or the replacement module.


Note If the captive installation screws are loose, the EMI gaskets on the installed modules will push adjacent modules toward the open slot, reducing the opening size and making it difficult to install the replacement module.


Step 4 Remove the module filler plate by removing the two Phillips pan-head screws from the filler plate. To remove a module, see the "Removing the Supervisor Engine" section.

Step 5 Fully open both ejector levers on the supervisor engine. (See Figure 15.)

Step 6 Position the supervisor engine in the slot. (See Figure 15.) Make sure that you align the sides of the module carrier with the slot guides on the top and bottom of the slot.

Step 7 Carefully slide the supervisor engine into the slot until the EMI gasket along the right edge of the supervisor engine makes contact with the module in the slot adjacent to it and both ejector levers have closed to approximately 45 degrees with respect to the supervisor engine faceplate. (See Figure 16.)

Step 8 Using the thumb and forefinger of each hand, grasp the two ejector levers and exert a slight pressure to the left, deflecting the module approximately 0.040 inches (1 mm) to create a small gap between the supervisor engine's EMI gasket and the module adjacent to it. (See Figure 16.)


Caution Do not exert too much pressure on the ejector levers. They will bend and be damaged.

Step 9 While pressing on the ejector levers, simultaneously close them to fully seat the supervisor engine in the backplane connector. The ejector levers are fully closed when they are flush with the supervisor engine faceplate. (See Figure 17.)

Step 10 Tighten the two captive installation screws on the supervisor engine.


Note Make sure the ejector levers are fully closed before tightening the captive installation screws.


Figure 15 Positioning the Supervisor Engine in the Chassis

Figure 16 Clearing the EMI Gasket in the Chassis

Figure 17 Ejector Lever Closure in the Chassis


Powering Up the System

This section describes how to power up the system.

AC-Input Systems

DC-Input Systems

AC-Input Systems

To power up your AC-input system, follow these steps:


Step 1 Plug the power cord into the power supply, and tighten the screw on the cable retention device.

Step 2 Connect the other end of the power cord to an AC-input power source.


Caution In a system with dual power supplies, connect each power supply to a separate input source. In case of a power source failure, the second source will most likely still be available.

Step 3 Turn the power switch to the On (|) position on the power supply. Switching the power switch to On also engages a pawl that locks the power supply in the bay.


DC-Input Systems

To power up your DC-input system, follow these steps:


Step 1 Remove the tape from the circuit breaker switch handle, and restore power by moving the circuit breaker switch handle to the On (|) position.

Step 2 Turn the power switch to the On (|) position on the power supply. Turning the power switch on also engages a pawl that locks the power supply in the chassis.


Verifying Installation

After you have powered up the switch, verify the operation of the newly installed hardware as follows:


Step 1 Verify power supply operation by checking that the power supply front panel LEDs are in these states:

INPUT OK LED is green

FAN OK LED is green

OUTPUT FAIL LED is not lit

42V LED is green

If the LEDs indicate a power problem, refer to the installation guide for your hardware platform for troubleshooting information.

Step 2 Verify the high speed fan tray operation by checking that the fan tray LEDs are in these:

INPUT POWER GOOD LED is green (there is one LED for each power input; if both inputs are used, verify both LEDs)

FAN FAIL LED is green

If the LEDs indicate a problem, refer to the installation guide for your hardware platform for troubleshooting information.

Step 3 Verify that the supervisor engine STATUS LED is lit. Check the STATUS LED periodically. If the STATUS LED changes from orange to green, the supervisor engine has successfully completed the boot process and is now online. If the STATUS LED remains orange or turns red, the supervisor engine has not successfully completed the boot process and may have encountered an error.


Related Documentation

For additional information on Catalyst 6500 series switches and command-line interface (CLI) commands, refer to the following publications:

Regulatory Compliance and Safety Information for the Catalyst 6500 Series Switches

Regulatory Compliance and Safety Information for the Cisco 7600 Series Routers

Catalyst 6500 Series Switch Installation Guide

Cisco 7609 Router Installation Guide

Obtaining Documentation and Submitting a Service Request

For information on obtaining documentation, submitting a service request, and gathering additional information, see the monthly What's New in Cisco Product Documentation, which also lists all new and revised Cisco technical documentation, at:

http://www.cisco.com/en/US/docs/general/whatsnew/whatsnew.html

Subscribe to the What's New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed and set content to be delivered directly to your desktop using a reader application. The RSS feeds are a free service and Cisco currently supports RSS Version 2.0.