The documentation set for this product strives to use bias-free language. For the purposes of this documentation set, bias-free is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, sexual orientation, socioeconomic status, and intersectionality. Exceptions may be present in the documentation due to language that is hardcoded in the user interfaces of the product software, language used based on RFP documentation, or language that is used by a referenced third-party product. Learn more about how Cisco is using Inclusive Language.
A
AC input power 4-3
acronyms 2-3
B
boot system flash command 1-19
C
cd command 1-15
commands
boot system flash filename 1-19
cd 1-15
config-register 1-20
delete 1-18
dir 1-15
pwd 1-15
CompactFlash Disk
installing 1-6
CompactFlash Disk options 1-2
config-register command 1-20
copy bootable image between PC cards 1-10
copy bootable image to PC card 1-9
copying to Flash memory 1-17
D
DC input power 4-4
DC-input power supply
Cisco 7200 series 4-7
Cisco uBR7200 series 4-6
delete command 1-18
DIMMs
NPE-175 4-17
NPE-225 4-17
NPE-300 4-17
NPE-G2 4-11
NSE-1 4-17
dir command 1-15
DRAM
NPE-100 4-20
NPE-150 4-20
NPE-200 4-20
replacement 4-10
E
electrostatic discharge prevention 3-14
F
Flash Disk options 1-2
Flash memory
copying to 1-17
Flash memory cards 1-2
functions
memory systems 2-2
G
guidelines
electrical equipment 3-13
safety 3-8
I
input power
AC 4-3
DC 4-4
installing
CompactFlash Disk 1-6
M
memory
NPE-100 4-22
NPE-150 4-22
NPE-175 4-17
NPE-200 4-20
NPE-225 4-17
NPE-300 4-17
NPE-400 4-14
NPE-G1 4-12
NPE-G2 4-11
NSE-1 4-17
replacement 4-10
SODIMM 4-14
memory configurations
NPE-100 2-22
NPE-150 2-20
NPE-175 2-16
NPE-200 2-18
NPE-225 2-16
NPE-300 2-13
NPE-G1 2-7
NPE-G2 2-6
NSE-1 2-9
memory information
NPE-100 2-20
NPE-150 2-18
NPE-175 and NPE-225 2-14
NPE-200 2-16
NPE-300 2-11
NPE-400 2-10
NPE-G1 2-6
NPE-G2 2-5
NSE-1 2-8
memory location on an NPE or NSE-1 2-4
memory replacement
NPE-100 4-20
NPE-150 4-20
NPE-200 4-20
NPE-G1 4-12
NPE-G2 4-11
memory specifications
NPE-100 2-21
NPE-150 2-20
NPE-200 2-18
NPE-300 2-12
NPE-400 2-10
NPE-G1 2-7
NPE-G2 2-5
NSE-1 2-8
memory specifications for an NPE or NSE-1 2-4
memory systems functions 2-2
memory upgrade
verification 4-23
N
network processing engine
installation 4-26
removal 4-8
network services engine
installation 4-26
removal 4-8
NPE-100
memory specifications 2-21
platforms supported 2-2
NPE-100 memory configurations 2-22
NPE-150
memory configurations 2-20
memory specifications 2-20
platforms supported 2-2
NPE-175
memory configurations 2-16
memory specifications 2-15
platforms supported 2-2
NPE-200
memory configurations 2-18
memory specifications 2-18
platforms supported 2-2
NPE-225
memory configurations 2-16
memory specifications 2-15
platforms supported 2-1
NPE-300
memory configurations 2-13
memory specifications 2-12
platforms supported 2-2
NPE-400
memory configurations 2-10, 2-11
memory information 2-10
memory specifications 2-10
platforms supported 2-1
NPE-G1
memory configurations 2-7
platforms supported 2-1
NPE-G1 memory specifications 2-7
NPE-G2
memory configuration 2-6
memory specifications 2-5
platforms supported 2-1
NSE-1
memory configurations 2-9
memory specifications 2-8
platforms supported 2-1
O
options
PC card 1-3
P
parts and tools for installation 3-1
PC card 1-2
installation 1-4
reformatting 1-7
PC card options 1-3
PC cards 1-2
platforms supported 1-viii
platforms supporting NPE-100 through NPE-200 2-1
platforms supporting NPE-225 through NPE-G2 2-1
power
AC input 4-3
power supply
installation 4-38
removal 4-36
procedures
copying to Flash memory 1-17
pwd command 1-15
R
requirements
hardware 3-2
software
NPE-200, NPE-150, NPE-100 3-5
NPE-225, NPE-175 3-5
NPE-G2 and NPE-G1 3-3
S
SDRAM
NPE-225 4-17
NPE-300 4-17
NPE-400 4-14
NPE-G2 4-11
NSE-1 4-17
replacement 4-10
SDRAM DIMMs
NPE-175 4-17
NPE-G2 4-11
SIMMs
NPE-100 4-20
NPE-150 4-20
NPE-200 4-20
SODIMM
NPE-400 4-14
NPE-G1 4-12
proper handling 4-15
T
telephone wiring guidelines 3-13
terms 2-3
U
upgrading the boot helper image 3-6
V
verification
memory upgrade 4-23