Overview of Installation Steps
Step |
See |
Check |
|
---|---|---|---|
1 |
Verify that the chassis is securely bolted to the floor. |
Cisco Network Convergence System 6000 Series Routers Unpacking, Moving, and Securing Guide |
|
2 |
Ground the chassis. |
||
3 |
Install the external cosmetics on the front of the chassis. |
||
4 |
Install the external cosmetics on the rear of the chassis. |
||
5 |
Install either AC or DC input power connections to the power trays. |
“Installing AC Input Power Cords” or “Installing DC Input Power Cables” |
|
6 |
Install power modules in the power trays. |
||
7 |
Power on the chassis. |
||
8 |
Install cards and remaining components in the chassis. |
“Installing Route Processor Cards, Line Cards, and Fabric Cards” |
|
9 |
Connect the cables to the other chassis if you are installing a back-to-back or multi-chassis system. |
Refer to the Cisco Network Convergence System 6000 Series Routers Migration Guide. |