NOTE: This version is only for new installations and cannot be used to upgrade existing Joulex Energy Manager installations to Cisco EnergyWise Management. Please contact Joulex technical support (support@joulex.net) in case you would like to migrate.
| Minimum | Recommended 5000 Devices | 10.000+ Devices 1) | 50.000+ Devices | ||
| Deployment | Single-Server | Single-Server | Single-Server |
Multi-Server
Central |
Multi-Server
per Controller |
| CPU | Dual Core, 2GHz | Dual Core, 2GHz | 2 Quad CPUs | 2 Quad CPUs | Quad Core, 2GHz |
| RAM | 4 GB | 8 GB | 16 GB | 16 GB | 4 GB |
| Hard Disk 2) | 40 GB | 250 GB | 1 TB | 1 TB | 250 GB |
| Operating System | Windows 7 (32-Bit) | Win Server 2008 R2 (64-Bit) | Win Server 2008 R2 (64-Bit) | Win Server 2008 R2 (64-Bit) | Windows 7 or Server (64-Bit) |
1) Recommended configuration for more than 30.000 devices: 12 Cores, 24GB RAM
2) Hard disk performance plays a critical role in a Cisco EnergyWise Management deployment. Cisco EnergyWise Management comes with it's own database to store device data, power measurements and other data at a high rate. A local physical storage or high-performance SAN is recommended, especially when deploying on a VM.