Postupgrade Tasks
You can perform these postupgrade tasks in any order.
Component |
Task |
---|---|
Finesse |
Complete postupgrade tasks for the Finesse desktop layout. See Finesse Desktop Layout Postupgrade Tasks. Finesse server need a restart after the upgrade of peripheral gateways (PG). |
Unified CVP |
Upgrade Call Studio. |
Optional: Synchronize the metadata files for the Unified CVP REST API using the sync-up tool. See Initiate Metadata Synchronization for Unified CVP Rest API. |
|
All |
Optional: Upgrade ESXi. |