- Preface
- Installation Roadmap
- Overview
- Installing the Power Enclosure, Power Trays, and Exterior Cosmetics
- Installing the Power Components
- Installing the Shelf Controller Cards and Fabric Cards
- Removing and Replacing Chassis Components
- System Specifications
- System Product IDs
- Cabling a Multi-Chassis Configuration
- Power System Overview
- Installing the Power Modules and Input Power Cables
Installing the Power
Components
This chapter provides an overview of the AC and DC power systems and how to install the power modules and input power cables into the Cisco NCS 6000 Fabric Card Chassis (FCC). For information about removing power components, see the Removing the Power Components section.
- Power System Overview
- Installing the Power Modules and Input Power Cables
- Powering On and Powering Off the Fabric Card Chassis
Power System Overview
The Cisco NCS 6000 FCC can be configured with either an AC input power system or a DC input power system. Site power requirements differ, depending on the source voltage used.
For information about power safety requirements, see the Regulatory Compliance and Safety Information for the Cisco Network Convergence System 6000 Series Routers.
Prerequisites
Follow these precautions and recommendations when planning power connections to the FCC:
-
Check the power at your site before installation to ensure that you are receiving clean power (free of spikes and noise). Install a power conditioner, if necessary.
-
Install proper grounding to avoid damage from lightning and power surges.
Installing the Fabric Card Chassis Ground Cable
The FCC has two safety earth ground connections. You can connect the central office ground system or interior equipment grounding system to either of these grounding points on the rear side of the FCC. One chassis ground is located near the top of the FCC and one chassis ground is located at the bottom of the FCC. These grounding points are also referred to as Network Equipment Building System (NEBS) bonding and grounding point, and are provided to satisfy the Telcordia NEBS safety requirements.

|
1 |
NEBS bonding and grounding points (upper) |
2 |
NEBS bonding and grounding point (lower) |
![]() Caution | Do not remove the FCC ground cable unless the FCC is being replaced. |
Required Tools and Equipment
You will need to provide the following tools and equipment:
-
Number-2 Phillips screwdriver
-
Ground lug
-
Ground cable
-
Crimping tool and lug specific die
-
3/8-inch drive torque wrench rated to include 30 in-lb (3.39 N-m)
To ensure a satisfactory ground connection:
-
One 180-degree angle (straight) grounding lug that has two M6 bolt holes with 0.63 inch (16 mm) spacing center to center between them, and a wire receptacle able to accept a 2-6-AWG multistrand copper wire.
-
Two M6 bolts with integrated square cone locking washers (shipped pre-installed on the FCC, two at each grounding point).
-
2-6-AWG multistrand copper ground cable. This cable is not available from Cisco; it is available from any commercial cable vendor such as Panduit (see http://www.panduit.com). The cable should be sized according to local and national installation requirements.
![]() Note | The DC return of this system should remain isolated from the system frame and FCC (DC-I: Isolated DC Return). |

Steps
To attach the ground cable to the FCC, follow these steps:
| Step 1 | Use the crimping tool mandated by the lug manufacturer to crimp the lug to the ground cable. |
| Step 2 | Use the socket
wrench to attach the lug and ground cable to one the NEBS grounding point
(Figure
1).
![]() |
| Step 3 | Use the torque wrench to tighten the bolts to a torque of 30 in-lb (3.39 N-m). |
| Step 4 | Connect the other end of the ground cable to a grounding point at your site, according to site requirements. |
AC Power System
Overview of the AC Power System
An AC-powered Cisco NCS 6000 FCC contains four AC power trays that are part of the FCC power enclosure (Figure 1). The upper two power trays (PT0 and PT1) are referred to as PS0, and the lower two power trays (PT2 and PT3) are referred to as PS1. Figure 3. Each set of power trays has a power control module (PCM) with its own I/O power switch.
Each AC power tray has three slots for PMs. The AC power trays are field-replaceable (after power down), however the PMs are hot-swappable.
Each inserted AC PM requires a single-phase, 50 to 60 Hz, 200 to 240 VAC input. Input current is variable and based on facility minimum voltage. For N+N redundancy, power feeds A must power the upper two AC power trays and power feeds B must power the lower two AC power trays (not all of the power module bays need to be filled). This allows the system to balance its load across each set of power trays and across the power modules within each tray.
The AC power system requires single-phase AC input power to each inserted PM. If you have a 3-phase AC Delta or AC Wye at your equipment, a Cisco NCS power distribution unit (PDU) is required to convert 3-phase AC input power to single-phase AC input power system.
![]() Note | If you plan to use a three-phase AC PDU we recommend that you install three AC PMs in each AC power tray to maintain a balanced three-phase power load. |
![]() Note | We recommend that you use appropriate short-circuit protection in compliance with national and local electrical codes. |
Installing an AC Power Distribution Unit
The AC PDU converts three-phase AC input power to single-phase AC input power that connects directly to the rear of each PM. The AC PDU includes either an AC Delta (Cisco PID NCS-PDU-DELTA) or AC Wye (Cisco PID NCS-PDU-WYE) power interface, and has power input and power output cords entering and exiting the box.

|
1 |
Rack mounting ears |
4 |
Output cord |
|
2 |
Rack tray |
5 |
Two PDUs |
|
3 |
Input cord |
|
|
For detailed information on AC PDUs, see the Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide.
Mounting the PDU
The AC PDU mounting bracket holds two AC PDUs. The mounting bracket can be attached to both sides of the FCC by using the existing screws that hold the side panels on (Figure 5). The PDUs are attached to the mounting brackets with four M5 screws per AC PDU.
Optionally, you can mount the AC PDU in an external 19-inch rack by using six pan-head screws (Figure 6).

|
1 |
AC PDUs (one each side) |
2 |
PDU bracket (chassis mount) |

Installing the Tie-Down Bar
A 19-inch tie-down bar can be used to add strain relief for input power cables from the AC PDUs or cables routed from a raised floor. The following figure shows holes for two 10-32 x 0.50 inch screws that are pre-drilled on the FCC for attaching a tie-down bar.
![]() Note | The 19-inch tie-down bar and screws are not supplied by Cisco. You can order these parts from a commercial vendor such as Panduit. |

|
1 |
Tie-down bar |
DC Power System
A DC-powered Cisco NCS 6000 FCC contains four DC power trays that are part of the FCC power enclosure (Figure 1). The upper two power trays (PT0 and PT1) are referred to as power shelf 0 (PS0), and the lower two power trays (PT2 and PT3) are referred to as power shelf 1 (PS1). Figure 3. Each set of power trays has a power control module (PCM) with its own I/O power switch.
The DC power tray has four slots for PMs. The DC power trays are field-replaceable (after power down), however the PMs are hot-swappable.
For N+N redundancy, “A” power feeds must power the upper two DC power trays and “B” power feeds must power the lower two DC power trays (not all of the PM bays need to be filled). This allows the system to balance its load across the two set of power trays and across the power modules within each tray.
The following table lists the DC input current and voltage specifications.
|
Nominal input voltage |
–48 VDC or –60 VDC (tolerance range: –40 to –72 VDC) |
|
Input line current |
50 A maximum at –48 VDC 40 A maximum at –60 VDC 60 A maximum at –40 VDC |
Each wiring block on the DC power tray contains two sets of terminals, one positive and one negative, and is covered by a plastic terminal block cover that is secured by a screw to a torque of 5 to 7 in-lb (0.56 to 0.79 N-m). Each DC power cable is connected to a power tray with a torque of 45 to 55 in-lb (5.1 to 6.2 N-m). The terminal block supports 4-6-AWG input wire.
The cable should be sized according to local and national installation requirements. Use only copper cable.
![]() Note | An “allpole” separation of the power source is not required. The DC PM is an isolated DC/DC converter with no galvanic connection between “L+” and the FCC. In addition, the “L+” potentials of each PM are isolated from each other. |
The power supply terminal posts are centered 0.63 inches (16 mm) apart and are 1/4-20 thread. We recommend that you use an appropriately sized 90-degree angle, industry-standard, dual-hole, standard barrel compression lug.

Installing the Power Modules and Input Power Cables
This section describes how to install the power modules and AC and DC power cables in the Cisco NCS 6000 FCC. We recommend that you perform the installation in the order outlined in this section.
![]() Note | Ensure that the ground cable is installed on the FCC before you install the power modules and input power cables. See the Installing the Fabric Card Chassis Ground Cable. |
- Installing an AC or DC Power Module
- About the Power Module Status Indicators
- Installing an AC or DC Power Module Slot Cover
- Installing AC Input Power Cords
- Installing DC Input Power Cables
Installing an AC or DC Power Module
This section describes how to install an AC or DC power module (PM) into the power trays in the Cisco NCS 6000 FCC. Although there are differences between the AC and DC PMs, they are installed by using the same procedures.
![]() Note | An AC-powered FCC supports up to 12 AC PMs (three per power tray). A DC-powered FCC supports up to 16 DC PM (four per power tray). |
Each PM has three status LEDs located on the front left side of its faceplate (Figure 14). See Table 2 for the meaning of each status LED.




Prerequisites
![]() Caution | Do not install a power module into an AC or DC power tray until the power tray is securely screwed into the power enclosure. |
Required Tools and Equipment
-
ESD-preventive wrist strap
-
6-inch, Number1 Phillips-head screwdriver
-
Torque screwdriver with Number-1 Phillips bit and rated torque at 5.5 in-lb (0.62 N-m)
-
AC or DC PM
-
AC PM (Cisco PID PWR-3KW-AC-V2)
-
DC PM (Cisco PID PWR-2KW-DC-V2)
-
Steps
![]() Note | Power modules are keyed to prevent incorrect insertion into the power tray. |
To install a PM into a power tray, follow these steps:
| Step 1 | Attach the ESD-preventive wrist strap to your wrist and connect its leash to the ESD jack on the front side of the FCC (see Preventing Electrostatic Discharge). You can also connect the ESD-preventive wrist strap leash to any bare metal surface on the FCC. | ||||||||
| Step 2 | Use two hands to support and guide the PM, and then slide it into the power tray.
| ||||||||
| Step 3 | Rotate the ejector lever upwards to seat the PM into the power tray. | ||||||||
| Step 4 | Tighten the ejector lever screw to a nominal installation torque of 5.5 in-lb (0.62 N-m). Do not exceed a maximum installation torque of 10 in-lb (1.13 N-m).
![]()
| ||||||||
| Step 5 | Fill the power tray, in PM ascending order, to the required configuration. | ||||||||
| Step 6 | If necessary, repeat these steps for the remaining power trays. |
About the Power Module Status Indicators
The input-power-present LED on the AC and DC power modules provide a visual indication that voltage is present across the input terminal connection.
-
For DC power modules, the DC input LED lights up when the input voltage reaches within the acceptable range.
-
For AC power modules, the AC Input LED lights up when the input voltage reaches within the acceptable range.
![]() Note | Always disconnect power servicing the input power connection. |
![]() Caution | If the input voltage polarity is reversed, or if the LED circuit fails, the LED will not light. In this case, service personnel should check for hazardous voltages before working on the system. |

|
1 |
Input OK LED |
3 |
Fault LED |
|
2 |
Output OK LED |
|
|
|
LED Name |
Color |
Meaning |
|---|---|---|
|
Input OK |
Green |
On: The input voltage is present and within regulation range. Blinking: The input voltage is present but out of regulation range. Off: The input voltage is not present. |
|
Output OK |
Green |
On: The output voltage is on. Blinking: The PM is in a power limit or Over Current condition. Off: The output voltage is off. |
|
Fault |
Red |
On: An internal fault is detected within the PM. Off: No internal faults detected on the PM. |
Installing an AC or DC Power Module Slot Cover
This section describes how to install a PM slot cover into an empty PM slot on an AC or DC power tray.
Prerequisites
Before performing this task, you must remove the cosmetic grilles and install the PMs to the required configuration in each power tray.
Required Tools and Equipment
-
ESD-preventive wrist strap
-
AC or DC PM slot cover (Cisco PID A9K-PEM-V2-FILR)
Steps
To install a PM slot cover in an AC or DC power tray, follow these steps:
| Step 1 | Attach the ESD-preventive wrist strap to your wrist and connect its leash to the ESD jack on the front side of the FCC (see Preventing Electrostatic Discharge). You can also connect the ESD-preventive wrist strap leash to any bare metal surface on the FCC. |
| Step 2 | Align the PM slot cover with the empty PM slot in the power tray. |
| Step 3 | Insert the two tabs on the top of the PM slot cover into the two holes on the top of the PM slot. |
| Step 4 | Push in the top of the PM slot cover gently until it clicks into place.
![]() |
Installing AC Input Power Cords
This section describes how to connect the AC input power cords to the power modules and includes the following topics:
Prerequisites
Ensure that there is a readily accessible disconnect device incorporated in the building's installation wiring.
![]() Caution | Before connecting AC input power cords to the power system, make sure that the input power cords are not energized. |
![]() Caution | The circuit breaker and fuse lockout procedures should follow the rules and regulations in the National Electrical Code (NEC) and any local codes. |
![]() Note | The AC power system requires single-phase AC input power to each PM. If you have 3-phase AC Delta or AC Wye at your equipment, a Cisco NCS 6000 Series power distribution unit (PDU) is required to convert 3-phase AC input power to single-phase AC input power (Cisco PID NCS-PDU-DELTA or Cisco PID NCS-PDU-WYE). For more information, see the Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide. |
Required Tools and Equipment
Steps
To install the AC input power cords, follow these steps:
Installing DC Input Power Cables
This section describes how to connect the DC input power cables and install DC terminal block covers. The DC terminal block cover is one piece that covers all four DC connections per tray.
The following figure shows the DC input power cabling on the rear of the power enclosure. In this example, the cabling for the four power trays all route to the right.

Prerequisites
![]() Note | Before installing the cabling on the power tray, ensure that the input power cables are not energized. |
![]() Note | Ensure that there is a readily accessible disconnect device incorporated in the building's installation wiring. |
![]() Note | The circuit breaker and fuse lockout procedures should follow the rules and regulations in the National Electrical Code (NEC) and any local codes. |
Required Tools and Equipment
-
DC power cables
-
DC power cable lugs
-
Crimping tool and lug-specific die
-
3/8-inch ratchet wrench with 7/16-pt. socket
-
Multimeter
-
Torque wrench with torque value rated up to 55 in-lb (6.2 N-m)
-
Terminal block cover
-
Torque screwdriver with Number-1 Phillips 8-inch shank, and a torque rating of 5 to 7 in-lb (0.56 to 0.79 N-m)
Steps
To connect the DC input power cables, follow these steps:
| Step 1 | Remove any DC terminal block covers, if installed.
![]() | ||||
| Step 2 | Verify the following resistance values:
| ||||
| Step 3 | Use the crimping tool mandated by the lug manufacturer to crimp the lugs to the DC input cables. For details on lugs, see the DC Power System.
The cable should be sized according to local and national installation requirements. Use only copper cable.
| ||||
| Step 4 | Using the wrench, attach the positive and negative cable pairs to each terminal block on the power tray (PT0). Start with PM0 (located on the right side) and move left, finishing with PM3 (located on the left side). Use the torque wrench to tighten to a torque of 45 to 55 in-lb (5.1 to 6.2 N-m).
| ||||
| Step 5 | Align the DC terminal block cover with the cover latch tab. | ||||
| Step 6 | Slide the terminal block cover upwards to align the screw with the mounting standoff. | ||||
| Step 7 | Use the screwdriver to secure the screw into the mounting standoff and tighten to a torque of 5 to 7 in-lb (0.56 to 0.79 N-m). | ||||
| Step 8 | Repeat these steps for all the power trays. |
Powering On and Powering Off the Fabric Card Chassis
This section describes how to power on and power off an AC-powered or DC-powered Cisco NCS 6000 FCC.
Powering On the Fabric Card Chassis
Prerequisites
Ensure that the FCC is properly grounded (see the Installing the Fabric Card Chassis Ground Cable section).
If you have a DC power system installed, the wiring at the Battery Distribution Fuse Bay (BDFB) or at the power plant must be complete.
Required Tools and Equipment
-
Voltmeter
Steps
To power on the FCC, follow these steps:
| Step 1 | Ensure that the I/O switches on the PCMs on the rear of the FCC are in the OFF position.
![]()
| ||
| Step 2 | Verify that none of the Output OK LEDs on the front of the PMs installed in the tray are green (Table 2). | ||
| Step 3 | If you have a DC power system installed, follow these steps: | ||
| Step 4 | If you have an AC power system installed, follow these steps:
| ||
| Step 5 | Turn the I/O switches on the PCMs to the ON position, and verify that the output LED is on (Figure 19). | ||
| Step 6 | Verify that the fan tray status LEDs are lit and that the fans are running. | ||
| Step 7 | Turn off the rear power breakers for power trays (FT0) and power trays (FT1).
| ||
| Step 8 | Install all cards in the FCC. For installation information, see Installing the Shelf Controller Cards and Fabric Cards | ||
| Step 9 | Turn on the output breakers when finished. |
Powering Off the Fabric Card Chassis
This section describes how to power off an AC-powered or DC-powered Cisco NCS 6000 FCC.
Steps
To power off the FCC follow these steps:
| Step 1 | Turn the I/O switches on the PCMs to the OFF position (Figure 19). | ||
| Step 2 | If you have a DC power system installed, remove the power fuse at the BDFB or power plant for each PM on all power trays. | ||
| Step 3 | If you have an AC power system installed, turn off the source circuit breakers to de-energize the PMs in all the power trays. | ||
| Step 4 | Verify that all
PM input LEDs are off (Figure
14).
|








Feedback