Contents

Unpacking SIP and SPA

Unpacking the SIP and SPA

To unpack the SIP and SPA:


Caution


Ensure that you are properly grounded with an ESD-preventative ground strap.


Procedure
    Step 1  

    Remove the SIP or the SPA card from the box.

    Step 2  

    Place the card on an antistatic surface.

    Step 3  

    Review the installation information for the card.



    Note


    For Class B emission compliance requirements, the two ferrites available in the Cisco uBR10012 router accessory kit must be installed on the input DC power harness of the chassis. These ferrite beads are clamp-on type and should be placed as close to the input DC power connector (DC input terminal connector) as possible.


    What to Do Next


    Unpacking SIP and SPA

    Unpacking SIP and SPA

    Unpacking the SIP and SPA

    To unpack the SIP and SPA:


    Caution


    Ensure that you are properly grounded with an ESD-preventative ground strap.


    Procedure
      Step 1  

      Remove the SIP or the SPA card from the box.

      Step 2  

      Place the card on an antistatic surface.

      Step 3  

      Review the installation information for the card.



      Note


      For Class B emission compliance requirements, the two ferrites available in the Cisco uBR10012 router accessory kit must be installed on the input DC power harness of the chassis. These ferrite beads are clamp-on type and should be placed as close to the input DC power connector (DC input terminal connector) as possible.


      What to Do Next