- Preface
- Introduction
- Overview of SPA Interface Processors
- Overview of Shared Port Adapters
- Packing SIP and SPA for Shipment
- Unpacking SIP and SPA
- Preparing to Install a SIP or a SPA
- Installing and Removing a SPA Interface Processor
- Installing and Removing a Shared Port Adapter
- Verifying and Troubleshooting SIPs and SPAs
Contents
Unpacking SIP and SPA
Unpacking the SIP and SPA
To unpack the SIP and SPA:
Caution | Ensure that you are properly grounded with an ESD-preventative ground strap. |
Note | For Class B emission compliance requirements, the two ferrites available in the Cisco uBR10012 router accessory kit must be installed on the input DC power harness of the chassis. These ferrite beads are clamp-on type and should be placed as close to the input DC power connector (DC input terminal connector) as possible. |
If you want to install the SIP card in the Cisco uBR10012 chassis, see the Preparing to Install a SIP or a SPA chapter before following the instructions in Installing and Removing a SPA Interface Processor chapter.
If you want to install the SPA card in the SIP, see the Preparing to Install a SIP or a SPA chapter before following the instructions in Installing and Removing a Shared Port Adapter chapter.
If you want to pack the SIP or the SPA for shipment, follow instructions in Packing SIP and SPA for Shipment chapter.