Cisco APIC Installation and ACI Upgrade and Downgrade Guide

PDF

Cisco APIC Installation and ACI Upgrade and Downgrade Guide

Resume paused switch upgrade scheduler using the GUI

Want to summarize with AI?

Log in

Configure the switch upgrade scheduler to resume after it has been paused in a maintenance group.


Before you begin

Follow these steps to resume a paused switch upgrade scheduler using the GUI:

Procedure

1.

On the menu bar, choose ADMIN > Firmware.

2.

In the Navigation pane, expand Fabric Node Firmware > Maintenance Groups > maintenance_group_name.

3.

In the Work pane, click the Policy tab.

4.

In the Maintenance Policy area, verify that the Running Status field displays Paused.

5.

In the Maintenance Policy area, verify that the Scheduler Status field displays Paused and that the Waiting for Cluster Convergence field displays No.

6.

Click the Actions tab, and click Resume Upgrade Scheduler.

7.

Click the Actions tab, and choose Upgrade Now from the drop-down list.