Configure the controller upgrade scheduler to resume operations when it has been paused.
Before you begin
Follow these steps to resume paused controller upgrade scheduler:
The switch upgrade scheduler is not available in the GUI from Cisco APIC Release 5.2(x) and later. If you are running Cisco APIC Release 5.2(x) or later use the REST API to resume a paused switch upgrade scheduler.
Procedure
| 1. | On the menu bar, choose . |
|
| 2. | In the Navigation pane, expand . |
|
| 3. | In the Work pane, click the Policy tab. |
|
| 4. | In the Controller Maintenance Policy area, verify that the Running Status field displays Paused. |
|
| 5. | Click the Actions tab, and click Resume Upgrade Scheduler. |
|
| 6. | Click the Actions tab, and choose Upgrade Controller Firmware Policy from the drop-down list. |
|
| 7. | Click the Actions tab, and choose Apply Now from the drop-down list. |