Describes the multiple methods available to configure Cisco Application Centric Infrastructure (ACI) leaf switch interfaces.
Physical ports configuration is a network administration process that
-
enables configuration of Cisco Application Centric Infrastructure (ACI) leaf switch interfaces through multiple methods
-
provides selector and profile-based configuration models for interface management, and
-
supports simplified configuration workflows to reduce administrative complexity.
Configuration methods
There are multiple ways to configure Cisco Application Centric Infrastructure (ACI) leaf switch interfaces:
-
By using the selector and profile-based configuration model. From , you can configure a switch profile that selects a leaf node with a leaf selector and the associated interface profiles to select the interface profiles (), which in turn select one or more interfaces and associate them to interface policy groups.
-
By using the interface configuration beginning with the Cisco Application Centric Infrastructure (APIC) 6.0(1) release. Go to . This configuration option simplifies the configuration workflow by reducing the number of configuration steps from four to one.
-
By using the inventory view from . Beginning with the Cisco APIC 6.0(1) release, the inventory view configuration also uses the interface configuration.
-
By using the wizard. Beginning with the Cisco APIC 6.0(1) release, the inventory view configuration also uses the interface configuration.