This document provides the installation instructions and workflow for Cisco Crosswork Network Controller version 7.1.2, including details on patch file versions.

Patch installation workflow

Summary

These are the stages of the high-level workflow for installing the Crosswork Network Controller 7.1.2 patch.

You can upgrade to Crosswork Network Controller version 7.1.2 only from version 7.1.0 and 7.1.1.

Upgrade process considerations

The upgrade process is disruptive and must be performed during a planned maintenance window. While the upgrade is deploying, some processes may temporarily report as unhealthy or degraded. The time required for each application or system patch can vary significantly, depending on factors such as the number of nodes in your deployment, the number of microservices being patched, and the overall system load.

  • Most applications return to healthy status within 30–60 minutes per application. System patch may require additional time (45 – 75 minutes), especially in larger deployments. For multi-node clusters, allow extra time proportional to the number of nodes.
  • Wait until the system status reflects "Healthy" before proceeding to install the next patch file.
  • If the system status does not return to "Healthy" within the expected time for your environment, or if you encounter any errors during patch installation, contact your Cisco Customer Experience representative for assistance before taking further steps.
  • If you are upgrading to Crosswork Network Controller 7.1.2 from 7.1.1, then restart the cw-topo-visualization pod from Administration > Crosswork Manager > Platform Infrastructure and then select the cw-topo-visualization pod > Restart. If you are applying the 7.1.2 patch on an existing 7.1 version, no action is required.

Workflow

  1. Ensure that your environment meets all the Patch installation prerequisites.
  2. Compare the versions of your current Crosswork Network Controller components with the new patch versions to determine which components need an upgrade. See Crosswork Network Controller 7.1.2 component patch files for the versions you need.
  3. Extract and validate patch files the Crosswork Network Controller 7.1.2 patch files.
  4. (Applicable only for AWS EC2 deployments) Apply kube-proxy patch (only for EC2 deployments) to ensure CAPP installations proceed smoothly. This step should be completed before applying patches.
  5. Verify the inventory information on Crosswork Network Controller UI. If the information is not available, you cannot proceed with the patch installation. See Verify the inventory details.
  6. Add and install System OS patch file.
  7. Add and install 7.1.2 patch files in the Crosswork Network Controller UI.
  8. (Optional) Install Geo Redundancy patch.
     Note

    If you are not using geo redundancy, you do not need to install this patch.

  9. Install the Cisco NSO function packs.

Patch installation prerequisites

This section describes the prerequisites needed to install the Crosswork Network Controller 7.1.2 patch.

  • Install Crosswork Network Controller version 7.1.0 or 7.1.1. See the Cisco Crosswork Network Controller 7.1 Installation Guide for installation instructions.
  • For Crosswork Workflow Manager, download and install Crosswork Network Controller Premier package.
  • Ensure you have Cisco Crosswork Controller Administrator user credentials.
  • Identify the Management IP address (either a physical IP address or the Virtual IP address) used for your Crosswork VM deployment.
  • Back up your data. For more information, see Manage Crosswork Network Controller Backup and Restore. Additionally, the server being patched should have sufficient space to unarchive and copy the files.
    • At least 5GB of free space in the /home/cw-admin/ directory.
    • At least 1GB of free space in the /tmp/ directory.
  • Update Cisco NSO to version 6.4.1.3 on the external NSO VM. For installation instructions, refer to the Upgrade NSO documentation.
     Note

    These instructions apply only to external NSO VMs. For eNSO on SVM, migrating from version 7.1.1 to 7.1.2 will automatically upgrade the patch files.

  • In a geo-redundant setup, ensure that all relevant files, such as the Crosswork Network Controller cluster, application CAPPs, and data gateways are installed on both the active and standby clusters. Disable periodic synchronization by toggling off the Sync button on the Cross Cluster settings page before applying patches. No on-demand or periodic synchronization should be performed until the patch upgrades are completed and all services are confirmed to be healthy in both active and standby clusters. For more information, refer to Configure Cross Cluster Settings in the Cisco Crosswork Network Controller 7.1 Installation Guide.

Crosswork Network Controller 7.1.2 component patch files

This section lists the component patch files available in the Crosswork Network Controller 7.1.2 release. Note that some patch files may be optional for your specific upgrade path.

Installation sequence

Download these patch files from the Cisco Crosswork Network Controller 7.1.2 Software Download page to a local machine that can be accessed via SCP by Crosswork Network Controller.

Install patch files in this sequence:

  1. Crosswork System patch: signed-cnc-system-patch-7.1.2-97.tar.gz
  2. Crosswork Infrastructure patch: signed-cw-na-infra-patch-7.1.2-15-release-260123.tar.gz
  3. Geo Redundancy Manager: signed-cw-na-geo-patch-7.1.2-5-release-251024.tar.gz
  4. Element Management Function: signed-cw-na-element-management-functions-patch-7.1.2-7-release-251118.tar.gz
  5. Crosswork Optimization Engine: signed-cw-na-coe-patch-7.1.2-5-release-251218.tar.gz
  6. Crosswork Active Topology: signed-cw-na-cat-patch-7.1.2-6-release-251024.tar.gz
  7. Crosswork Service Health: signed-cw-na-aa-patch-7.1.2-8-release-251111.tar.gz
  8. Health Insights: signed-cw-na-hi-patch-7.1.2-6-release-251024.tar.gz
  9. eCDG CAPP (CNC-SVM only): signed-cw-na-collectors-patch-7.1.2-2-release-251025.tar.gz

Workflow Manager patch files

Download these patch files from the Cisco Crosswork Workflow Manager 2.0.2 Software Download page.

 Note

Crosswork Workflow Manager and Crosswork Workflow Manager Solutions CAPPs are supported only on cluster deployment for Crosswork Network Controller 7.1.2.

  1. Crosswork Workflow Manager (SVM/Cluster): cw-na-cwm-2.0.2-4-releasecwm-202-251119.tar.gz
  2. Crosswork Workflow Manager-Solutions (SVM/Cluster): cw-na-cwm-sol-2.0.2-2-releasecwms202-251119.tar.gz

Additional component patch files

If any of the components listed above are not part of the patch release, ensure that you install the latest version of the components from the 7.1.1 release bundle.

Additional components to be installed on NSO are listed in the Install the Cisco NSO function packs section. These instructions apply only to external NSO VMs integrated with Crosswork Network Controller and not to SVMs.

Extract and validate patch files

This section explains how to extract and validate the downloaded 7.1.2 patch files.


Step 1

Navigate to the folder where the tar file was downloaded. As an example, consider the Crosswork Infrastructure signed patch image signed-cw-na-infra-patch-7.1.2-15-release-260123.tar.gz for this procedure.

cd <folder where the tar file was downloaded>

Step 2

Extract the signed file using this command.

tar -xzvf <signed image file>

The signed image package contains the patch file (.tar.gz) and relevant certificates for validation.

Example:

tar -xzvf signed-cw-na-infra-patch-7.1.2-15-release-260123.tar.gz

Output:

README
cw-na-infra-patch-7.1.2-15-release-260123.tar.gz

cw-na-infra-patch-7.1.2-15-release-260123.tar.gz
.tar.gz.signature
CW-CCO_RELEASE.cer
cisco_x509_verify_release.py3
cisco_x509_verify_release.py

Step 3

Validate the extracted patch file using this command.

python3 cisco_x509_verify_release.py3 -e <.cer file> -i <.tar.gz file> -s <.tar.gz.signature file> -v dgst -sha512
 Note

You must include this command as a single line, and the tool will wrap it according to the screen width.

Example:

python3 cisco_x509_verify_release.py3 -e CW-CCO_RELEASE.cer -i cw-na-infra-patch-7.1.2-15-release-260123.tar.gz
 -s cw-na-infra-patch-7.1.2-15-release-260123.tar.gz
.signature -v dgst -sha512

Output:

Retrieving CA certificate from http://www.cisco.com/security/pki/certs/crcam2.cer ...
Successfully retrieved and verified crcam2.cer.
Retrieving SubCA certificate from http://www.cisco.com/security/pki/certs/innerspace.cer ...
Successfully retrieved and verified innerspace.cer.
Successfully verified root, subca and end-entity certificate chain.
Successfully fetched a public key from CW-CCO_RELEASE.cer.
Successfully verified the signature of cw-na-infra-patch-7.1.2-15-release-260123.tar.gz
 using CW-CCO_RELEASE.cer

Step 4

Repeat these steps for each patch file you plan to install.


Apply kube-proxy patch (only for EC2 deployments)

This section provides instructions on how to apply the kube-proxy.sh script. This script is required only for AWS EC2 deployments and should be applied before installing 7.1.2 patch files.

Run these commands on any Crosswork Network Controller cluster VM/node (preferably CW VM1/Node1) by connecting via CLI.

Step 1

Make the script executable.

chmod +x scripts/patch-kube-proxy.sh

Step 2

Apply the kube-proxy patch.

./scripts/patch-kube-proxy.sh

Step 3

Optional commands:

  • Verify if the patch is already applied:./scripts/patch-kube-proxy.sh --verify-only
  • Back up the current configuration only:./scripts/patch-kube-proxy.sh --backup-only
  • Display help and usage instructions:./scripts/patch-kube-proxy.sh --help

Verify the inventory details

This step describes a recommended pre-patch verification step to confirm cluster or single VM health, node visibility, and service readiness across hybrid and worker nodes. Performing this verification can help identify potential issues such as resource discrepancies, VM status mismatches, or communication failures before patching begins. Although this step is optional, performing it can reduce the risk of patch failures during sequential updates.


Step 1

Verify the inventory details.

  1. From the main menu, choose Administration > Crosswork Manager.

  2. On the Crosswork Summary tab, click the System Summary tile to display the Cluster Management window.

The cluster details are displayed. If the information does not appear, import the inventory file.

Step 2

Import the inventory file.

  1. From the Cluster Management window, choose Actions > Import Cluster Inventory to display the Import Cluster Inventory dialog box.

     Note

    In a single VM deployment, click and select Import Inventory.

  2. (Optional) Click Download sample template file to download the template.

  3. Update the file with information about the VMs in your cluster or single VM environment, and include the data center parameters. Then, verify the contents of the template file. For information about the parameters, see Installation parameters in the Cisco Crosswork Network Controller 7.1 Installation Guide.

     Note

    Uncomment or set the OP_Status = 2 parameter while importing the cluster inventory file manually. If you do not, the VM may incorrectly appear as "Initializing" even after becoming functional.

  4. Click Browse and select the cluster inventory file.

  5. Click Import to complete the operation.

For more details and supporting documentation, see:


The inventory is updated, and Crosswork Network Controller displays correct VM and node details.

Add and install system OS patch

This section explains how to add and install an OS patch from the Crosswork Network Controller UI.

 Note

This patch must be installed on the active, standby, and arbiter VMs in a geo-redundant setup.

Before you begin

For non-docker based deployments, before installing the OS patch, verify that all inventory details are visible in the System summary page.

 Important

For this, you must import an inventory file (.tfvars file) to Crosswork Network Controller to reflect the details of your cluster. If inventory is missing, the patch installation will fail. Crosswork Network Controller cannot deploy or remove VM nodes in your cluster until you import the inventory file.

For instructions to import an inventory file, see Import cluster inventory in the Cisco Crosswork Network Controller 7.1 Administration Guide.


Step 1

Create a new backup if you do not already have one.

Step 2

From the main menu, choose Administration > Crosswork Manager.

The Crosswork Manager page is displayed with System Summary and Crosswork Platform Infrastructure tiles. If the 7.1.1 CAPPs are installed, the corresponding CAPP tiles appear on the Crosswork Manager page.

Step 3

Click the System Management tab.

Step 4

Click Add OS patch.

  1. In the popup window choose either URL or SCP as your preferred protocol. Based on your selection, fill in the additional fields with the required information.

    Individual jobs are created to add the patch to repository, and to apply the package to each node in your cluster.
  2. Click Add to proceed.

Step 5

Click System Management > Job History to monitor the status of each job.

For details on each node’s operation, open the Job Details page.

Step 6

Once jobs complete successfully, check that the newly added OS patch is listed under the System updates tab.

Step 7

To upgrade an installed OS patch, use the Upgrade button in the System updates tab.

Step 8

(Optional) To see patch details, select the patch file and click Package details. You’ll see information such as package name, version, and description.

Step 9

(Optional) After all jobs are completed successfully, verify the updated package list for each node by navigating to Administration > Crosswork Manager > System Summary > <Node-Name> > View details > Package details tab.


Add and install 7.1.2 patch files

This section explains how to add and install the 7.1.2 patch files in the Crosswork Network Controller UI.

 Important

The infrastructure patch must be applied on the active, standby, and arbiter VMs. All other application patches should be applied only on the active and standby VMs.

Before you begin

Extract and validate the required 7.1.2 patch files using the instructions in Extract and validate patch files.


Step 1

Check the health status of your system. If any components are unhealthy or degraded, resolve the issues or contact your Cisco Customer Experience representative before proceeding.

Step 2

Click on Administration > Crosswork Management > Application Management tab. The Platform Infrastructure and any applications that are added are displayed here as tiles.

Step 3

Click on the Add File (.tar.gz) option to add the patch file that you extracted. As an example, consider the Platform Infrastructure patch file, signed-cw-na-infra-patch-7.1.2-15-release-260123.tar.gz for this procedure.

The Add File (tar.gz) via Secure Copy popup window is displayed.

Step 4

Enter the relevant information and click Add.

Step 5

Once the patch file is added, you can observe the existing application tile displaying an upgrade prompt. Click the upgrade prompt to install the patch file.

Step 6

In the Upgrade pop-up screen, select the new version that you want to upgrade to, and click Upgrade. Click on Job History to see the progress of the upgrade operation.

Step 7

After the installation is complete, go to Administration > Crosswork Manager and confirm all of the applications are reporting a Healthy status.

Step 8

Repeat steps 2 to 8 to add and install the remaining Crosswork Network Controller application patch files that you need.


Install Geo Redundancy patch

This section guides you through the process of enabling geo-redundancy and applying the required geo redundancy patch in the Crosswork Network Controller.

 Note

Geo-HA applies only to Crosswork Network Controller clusters where Geo-HA is enabled. The patch must be installed on both the active and standby clusters. If you are not using geo redundancy, you do not need to install this patch.

Before you begin

  • In a geo-redundant setup, ensure that all relevant files, such as the Crosswork Network Controller cluster, application CAPPs, and Data Gateways are installed on both the active and standby clusters.
  • Disable periodic synchronization by toggling off the Sync button on the Cross Cluster settings page before applying patches. No on-demand or periodic synchronization should be performed until the patch upgrades are completed and all services are confirmed to be healthy in both active and standby clusters. See Update an Application After Enabling Geo Redundancy.
  • Extract and validate the Geo Redundancy 7.1.2 patch, signed-cw-na-geo-patch-7.1.2-5-release-251024.tar.gz, using the instructions in Extract and validate patch files.
  • Ensure that you have enabled Geo Redundancy in the Crosswork Network Controller UI. See Enable Geo Redundancy Solution.
  • Create a backup of your Crosswork cluster. Follow the instructions in Manage Backups chapter in Cisco Crosswork Network Controller 7.1 Administration Guide.
     Note

    Importing the cross cluster inventory template cannot be undone if there is no pre-existing backup of the system before the template is loaded.


Step 1

On both the active and standby clusters, complete Steps 2 and 3 to apply the patch file and provide the required details.

Step 2

Apply the Crosswork System, Crosswork Infrastructure, and Geo Redundancy Manager patches in this order with the active node first, then the standby node, and finally the arbiter node.

  1. In the Crosswork Network Controller UI, navigate to Administration > Crosswork Management > Application Management tab.

  2. Click on the Add File (.tar.gz) option to add the patch file. The Add File (tar.gz) via Secure Copy popup window is displayed.

  3. Enter the relevant information and click Add.

  4. Once the patch file is added, you can observe the existing application tile displaying an upgrade prompt. Click the upgrade prompt to install the patch file.

  5. In the Upgrade pop-up screen, select the new version that you want to upgrade to, and click Upgrade. Click on Job History to see the progress of the upgrade operation.

Step 3

After the installation is complete, go to Administration > Crosswork Manager and confirm all of the applications are reporting a Healthy status.


Install the Cisco NSO function packs

 Note

For eNSO, migrating from version 7.1.1 to 7.1.2 automatically upgrades the patch files. These patch files are included in the NSO function pack bundle and are deployed using the NSO Deployment Manager through the Crosswork Network Controller UI. See Install Cisco NSO Function Pack Bundles from Crosswork UI.

For external NSO VM, you must install or upgrade the Cisco NSO Function Packs to ensure compatibility with the Crosswork Network Controller 7.1.2. The Cisco Crosswork Network Controller Function Pack (cnc-function-packs-7.1.2.tar.gz) for the 7.1.2 release includes the following function pack files:

  • T-SDN core function pack: tsdn-7.1.2-nso-6.4.1.3.20251016.a0670cbe.tar.gz
  • Device Lifecycle Management (DLM) function pack: dlm-7.1.2-nso-6.4.1.3.20251016.f7a58e6.tar.gz
  • Telemetry Traffic Collector (TM-TC) function pack: tmtc-7.1.2-nso-6.4.1.3.20251016.da698016.tar.gz
  • Change Automation (CA) function pack: nca-7.1.2-nso-6.4.1.3.20251016.b3a8154.tar.gz
  • TE Manager function pack: temanager-7.1.2-nso-6.4.1.3.20251016.a0670cbe.tar.gz

Before you begin

  • Determine whether you want to perform a fresh installation or upgrade your existing NSO function packs.
  • Ensure that NSO version 6.4.1.3 is installed on the external NSO VM. For upgrade instructions, see Upgrade NSO documentation.

Step 1

Install or upgrade NSO function packs.

Step 2

Update the ncs.conf file to enable and configure NSO keepalive settings for stable RESTCONF integration.

Add the keepalive and keepalive-timeout configuration under both the <tcp> and <ssl> transport configurations.

<webui>
    <enabled>true</enabled>
    <transport>
      <tcp>
        <enabled>true</enabled>
        <keepalive>true</keepalive>       
        <keepalive-timeout>3600</keepalive-timeout>
      </tcp>
      <ssl>
        <enabled>true</enabled>
         <keepalive>true</keepalive>   
         <keepalive-timeout>3600</keepalive-timeout>
      </ssl>
    </transport>
  </webui>
......
</webui>

Step 3

Restart NSO for the configuration in ncs.conf to take effect.

sudo systemctl restart ncs