cc/td/doc/product/lan/cat4000
hometocprevnextglossaryfeedbacksearchhelp
PDF

Table of Contents

index

index

Numerics


10/100BASE-T
Ethernet management port   5-4

10/100BASE-T port LEDs   5-15

1000BASE-LX/LH GBICs   5-24

1000BASE-SX GBICs   5-24

1000BASE-X   1-5, 1-10

1000BASE-ZX GBICs   5-24

100BASE-T   1-3, 1-8

100BASE-TX RJ-45 connector   5-22

10BASE-T   1-3, 1-8
Ethernet management port   5-4
management port pinouts   A-1

12-port Gigabit Ethernet switching module   5-11

18-Port Gigabit Ethernet switching modules (figure)   5-11

24-port Fast Ethernet switching module   5-6

2-port Gigabit Ethernet and 32-Port 10/100-Mbps BASE-T switching modules (figure)   5-7

32-port 10/100/1000 BASE Layer 3 route switching module   5-8

32-port 10/100-Mbps Fast Ethernet switching module   5-9

48-port 10/100-Mbps Fast Ethernet switching modules (figure)   5-7

48-port 10/100-Mbps Fast Ethernet switching modules with RJ-21 connectors   5-7

48-Port Inline Power 10/100BASE-TX switching modules (figure)   5-14

6-Port 1000BASE-X Gigabit Ethernet switching modules (figure)   5-10

802.1D Spanning Tree   1-4, 1-9

802.3z, IEEE   C-1

A


AC-input power
power cords
international options (table)   2-9
length   2-8
plugs and coupler (figure)   2-9

AC-input power supplies
description   1-14
troubleshooting   6-4

agency approvals
FCC   A-5, A-7
safety   A-5, A-7

airflow
direction   1-12
internal temperature   1-14

airflow (figure)   1-13

autonegotiation   1-3, 1-8

B


backplane channel modules (figure)   5-14

BER   5-30

bit error rate
See BER

boot process
initial   6-2
observing LEDs   5-32

C


cables
AC-input power   2-8

cabling
connecting switch and remote DCE device   5-23
multimode fiber-optic   5-30

captive installation screws (figure)   5-21

CDP   1-4, 1-9

CGMP   1-4, 1-9

chassis
dimensions   A-4, A-6

checklists
site planning   2-9

Cisco Discovery Protocol
See CDP

Cisco Group Management Protocol
See CGMP

CLI   1-4, 1-9

command-line interface
See CLI

commands
show module   5-21
show port   5-17, 5-29

components
front panel   5-3
switch   1-11
troubleshooting   6-2

configuration, patch cord (figure)   5-31

connectors
100BASE-TX RJ-45   5-22
console port   5-3
DCE and DTE   5-23

console port
connecting   5-23
description   5-5
specifications   A-2

console port connectors   5-3

conventions, document   xiii

current rating, chassis   A-4, A-7

customer service   6-7

D


DCE connectors   5-23

DC-input power supplies
connecting system ground   2-5
description   1-14
troubleshooting   6-4

description, switch (figure)   1-2

differential mode delay   C-1

dimensions, chassis   A-4, A-6

documentation, related   xii

document conventions   xiii

DTE connectors   5-23

E


ejector levers, switching module (figure)   5-20, 5-21

environmental monitoring
power supplies   1-17

Ethernet management port   5-4
connecting   5-22
description   5-4

Ethernet speeds
1000BASE-X   1-5, 1-10
100BASE-T   1-3, 1-8
10BASE-T   1-3, 1-8

external power shelf   1-17

F


Fail LED   1-16

fan assemblies
description   1-12, 4-8
during boot   6-2
installing   4-10
power supply   1-16
removing   4-10
required tools   4-10
support   1-3, 1-8
troubleshooting   6-2, 6-5
verifying installation   4-11

features, switch (table)   1-2, 1-7

figures
AC-input power cord
plugs and coupler   2-9

filler plate, module   5-19

Flashcode, troubleshooting   6-4

flow control   5-12

forwarding rate   1-3, 1-8

frames
flow-controlled   5-12
pause   5-12

frequency, specifications   A-4, A-6

front panel components   5-3

G


GBIC optical power specifications   5-26

GBICs
1000BASE-LX/LH   5-24
1000BASE-SX   5-24
1000BASE-ZX   5-24
care and handling   5-30
features   5-24
installing   5-27
removing   5-29

Gigabit Ethernet
Ethernet speeds   1-5, 1-10
port and status LEDs (figure)   5-15

Good LED   1-16, 5-32

grounding   2-5

H


hardware
components   1-11
fan assemblies   1-12

heat dissipation   2-2

hot swapping
modules   5-16
screen display   5-17

I


IEEE 802.1D Spanning Tree   1-4, 1-9

IEEE 802.3z   C-1

installing the switch
rack-mounting
description   3-2
procedure   3-3
tools required   3-3
troubleshooting   6-1

internal temperature   1-14

L


label, chassis serial number   6-7

laser transmission   C-1

Layer 2 forwarding   1-3, 1-8

LEDs
10/100BASE-T port (figure)   5-15
Fail   1-16
Gigabit Ethernet port and status (figure)   5-15
Good   1-16, 5-32
link status   5-4
Output Fail   1-17
power supply   1-16, 6-3
Status   5-3
supervisor engine (table)   5-4
switching modules   5-15
switching modules (table)   5-4
switch load indicators   5-3

levers, ejector (figure)   5-20, 5-21

link status LED   5-4

load sharing, power supplies   1-16

M


MAC addresses   1-3, 1-8

management
Ethernet   5-4
local   1-2, 1-7
performance   1-4, 1-9
remote   1-2, 1-7

Media Access Control addresses
See MAC addresses

memory, specifications   A-3, A-6

microprocessor, specifications   A-3, A-6

modules
filler plate   5-19
supervisor engines   5-2

multimode fiber-optic cabling
patch cord   5-30

O


Output Fail LED   1-17

overfilled launch condition   C-2

oversubscribed ports   5-12

P


packaging materials   B-1

PAgP   1-3, 1-8

patch cord
configuration (figure)   5-31
description   5-30
installing   5-31

pause frames
see flow control

PEM   1-17, 4-11

performance management   1-4, 1-9

pinouts
10BASE-T management port   A-1
console port   A-2

Port Aggregation Protocol
See PAgP

power
requirements   2-2

power entry module
See PEM

power supplies   1-14
description   1-14
during boot   6-2
environmental monitoring   1-17
external power shelf   1-17
fan assembly   1-16
installing   4-4
LEDs   1-16, 6-3
load sharing   1-16
PEM   1-17
redundancy   1-15
removing   4-3
required tools   4-3
specifications   A-4, A-6, A-7
support   1-3, 1-4, 1-8, 1-9
troubleshooting   6-2, 6-3, 6-4

procedures
checking shipping container contents   3-2
connecting system ground   2-5
connecting terminals to the console port   5-23
connecting to the Ethernet management port   5-22
fan assembly installation   4-10
fan assembly removal   4-10
GBIC installation   5-27
GBIC removal   5-29
installing the PEM   4-11
patch cord installation   5-31
power supply installation   4-4
power supply removal   4-3
rack-mounting   3-3
rack-mounting the switch   3-2
removing and replacing the chassis fan assembly (figure)   4-8
repacking a switch   B-1
switching module installation   5-17
switching module removal   5-21
switching module verification   5-32
verifying installation   4-11

protocols
802.1D Spanning Tree   1-4, 1-9
CDP   1-4, 1-9
CGMP   1-4, 1-9

PS1 and PS2 LEDs   1-16

R


rack-mounting
checklist   3-4
description   3-2
installing (figure)   3-8

related documentation   xii

Remote Monitoring
See RMON

repacking   B-1

repacking instructions   B-1

requirements
power   2-2
tools   3-3

reset switch   5-4

returns   B-1

RJ-45 connectors, usage   1-4, 1-9

RMON   1-4, 1-9

S


screws, captive installation (figure)   5-21

serial number, chassis   6-7

shipping instructions   B-1

show module command   5-21

show port command   5-17, 5-29

Simple Network Management Protocol
See SNMP

site planning
checklist   2-9

slots
supervisor engine   1-2, 1-7
switching modules   1-2, 1-7

SNMP   1-4, 1-9

specifications
Catalyst 4003 switch   A-3
Catalyst 4006 switch   A-6
switching modules   A-8

startup
troubleshooting   6-3

Status LED   5-3

supervisor engines
10BASE-T management port pinouts   A-1
console port   5-5, A-2
description   5-2
LEDs   5-4, 5-32
management   1-4, 1-9
slot location   1-2, 1-7
support   1-10
troubleshooting   6-2

switching modules
12-port Gigabit Ethernet switching module   5-11
18-Port Gigabit Ethernet (figure)   5-11
24-port Fast Ethernet switching module   5-6
2-port Gigabit Ethernet and 32-Port 10/100-Mbps BASE-T (figure)   5-7
32-port 10/100/1000 BASE Layer 3 route switching module   5-8
48-port 10/100-Mbps Fast Ethernet (figure)   5-7
48-port 10/100-Mbps Fast Ethernet with RJ-21 connectors   5-7
48-Port Inline Power 10/100BASE-TX (figure)   5-14
6-Port 1000BASE-X Gigabit Ethernet (figure)   5-10
backplane channel module (figure)   5-14
description   5-5
ejector levers (figure)   5-20, 5-21
Ethernet   5-14
Gigabit Ethernet   5-10
installation tools   5-18
installing   5-17  to 5-21
LEDs   5-15
LEDs (table)   5-4
removing   5-21
support   1-5, 1-10
troubleshooting   6-3, 6-6
verifying   5-32

switch load indicators   5-3

system specifications   A-1

T


tables
AC-input power cord options   2-9

temperature
internal air   1-14

terminals
connecting to the console port   5-23
connecting to the Ethernet management port   5-22

tools, required   3-3

troubleshooting
contacting customer service   6-7
fan assemblies   6-2, 6-5
Flashcode   6-4
initial boot   6-2
methodology   6-2
power supplies   6-2, 6-3, 6-4
related documentation   xii
startup   6-3
supervisor engines   6-2
switching modules   6-3, 6-6

V


virtual LANs
See VLANs

VLANs   1-3, 1-8

VLAN Truck Protocol
See VTP

voltage
AC input   A-4, A-6, A-7

VTP   1-3, 1-8

W


weight, chassis   A-4, A-6

WS-U4504-FX-MT   5-9

WS-X4019   5-14

WS-X4124-FX-MT   5-6

WS-X4148-RJ   5-7

WS-X4148-RJ21   5-7

WS-X4148-RJ45V   5-14

WS-X4232-GB-RJ   5-7

WS-X4232-L3   5-8

WS-X4232-RJ-XX   5-9

WS-X4306-GB   5-10

WS-X4412-2GB-T   5-11

WS-X4418-GB   5-11

WS-X4604-GWY   5-14

hometocprevnextglossaryfeedbacksearchhelp
Posted: Fri Apr 13 19:37:13 PDT 2001
All contents are Copyright © 1992--2001 Cisco Systems, Inc. All rights reserved.
Important Notices and Privacy Statement.