Table of Contents
index
- 10/100BASE-T
- Ethernet management port 5-4
- 10/100BASE-T port LEDs 5-15
- 1000BASE-LX/LH GBICs 5-24
- 1000BASE-SX GBICs 5-24
- 1000BASE-X 1-5, 1-10
- 1000BASE-ZX GBICs 5-24
- 100BASE-T 1-3, 1-8
- 100BASE-TX RJ-45 connector 5-22
- 10BASE-T 1-3, 1-8
- Ethernet management port 5-4
- management port pinouts A-1
- 12-port Gigabit Ethernet switching module 5-11
- 18-Port Gigabit Ethernet switching modules (figure) 5-11
- 24-port Fast Ethernet switching module 5-6
- 2-port Gigabit Ethernet and 32-Port 10/100-Mbps BASE-T switching modules (figure) 5-7
- 32-port 10/100/1000 BASE Layer 3 route switching module 5-8
- 32-port 10/100-Mbps Fast Ethernet switching module 5-9
- 48-port 10/100-Mbps Fast Ethernet switching modules (figure) 5-7
- 48-port 10/100-Mbps Fast Ethernet switching modules with RJ-21 connectors 5-7
- 48-Port Inline Power 10/100BASE-TX switching modules (figure) 5-14
- 6-Port 1000BASE-X Gigabit Ethernet switching modules (figure) 5-10
- 802.1D Spanning Tree 1-4, 1-9
- 802.3z, IEEE C-1
- AC-input power
- power cords
- international options (table) 2-9
- length 2-8
- plugs and coupler (figure) 2-9
- AC-input power supplies
- description 1-14
- troubleshooting 6-4
- agency approvals
- FCC A-5, A-7
- safety A-5, A-7
- airflow
- direction 1-12
- internal temperature 1-14
- airflow (figure) 1-13
- autonegotiation 1-3, 1-8
- backplane channel modules (figure) 5-14
- BER 5-30
- bit error rate
- See BER
- boot process
- initial 6-2
- observing LEDs 5-32
- cables
- AC-input power 2-8
- cabling
- connecting switch and remote DCE device 5-23
- multimode fiber-optic 5-30
- captive installation screws (figure) 5-21
- CDP 1-4, 1-9
- CGMP 1-4, 1-9
- chassis
- dimensions A-4, A-6
- checklists
- site planning 2-9
- Cisco Discovery Protocol
- See CDP
- Cisco Group Management Protocol
- See CGMP
- CLI 1-4, 1-9
- command-line interface
- See CLI
- commands
- show module 5-21
- show port 5-17, 5-29
- components
- front panel 5-3
- switch 1-11
- troubleshooting 6-2
- configuration, patch cord (figure) 5-31
- connectors
- 100BASE-TX RJ-45 5-22
- console port 5-3
- DCE and DTE 5-23
- console port
- connecting 5-23
- description 5-5
- specifications A-2
- console port connectors 5-3
- conventions, document xiii
- current rating, chassis A-4, A-7
- customer service 6-7
- DCE connectors 5-23
- DC-input power supplies
- connecting system ground 2-5
- description 1-14
- troubleshooting 6-4
- description, switch (figure) 1-2
- differential mode delay C-1
- dimensions, chassis A-4, A-6
- documentation, related xii
- document conventions xiii
- DTE connectors 5-23
- ejector levers, switching module (figure) 5-20, 5-21
- environmental monitoring
- power supplies 1-17
- Ethernet management port 5-4
- connecting 5-22
- description 5-4
- Ethernet speeds
- 1000BASE-X 1-5, 1-10
- 100BASE-T 1-3, 1-8
- 10BASE-T 1-3, 1-8
- external power shelf 1-17
- Fail LED 1-16
- fan assemblies
- description 1-12, 4-8
- during boot 6-2
- installing 4-10
- power supply 1-16
- removing 4-10
- required tools 4-10
- support 1-3, 1-8
- troubleshooting 6-2, 6-5
- verifying installation 4-11
- features, switch (table) 1-2, 1-7
- figures
- AC-input power cord
- plugs and coupler 2-9
- filler plate, module 5-19
- Flashcode, troubleshooting 6-4
- flow control 5-12
- forwarding rate 1-3, 1-8
- frames
- flow-controlled 5-12
- pause 5-12
- frequency, specifications A-4, A-6
- front panel components 5-3
- GBIC optical power specifications 5-26
- GBICs
- 1000BASE-LX/LH 5-24
- 1000BASE-SX 5-24
- 1000BASE-ZX 5-24
- care and handling 5-30
- features 5-24
- installing 5-27
- removing 5-29
- Gigabit Ethernet
- Ethernet speeds 1-5, 1-10
- port and status LEDs (figure) 5-15
- Good LED 1-16, 5-32
- grounding 2-5
- hardware
- components 1-11
- fan assemblies 1-12
- heat dissipation 2-2
- hot swapping
- modules 5-16
- screen display 5-17
- IEEE 802.1D Spanning Tree 1-4, 1-9
- IEEE 802.3z C-1
- installing the switch
- rack-mounting
- description 3-2
- procedure 3-3
- tools required 3-3
- troubleshooting 6-1
- internal temperature 1-14
- label, chassis serial number 6-7
- laser transmission C-1
- Layer 2 forwarding 1-3, 1-8
- LEDs
- 10/100BASE-T port (figure) 5-15
- Fail 1-16
- Gigabit Ethernet port and status (figure) 5-15
- Good 1-16, 5-32
- link status 5-4
- Output Fail 1-17
- power supply 1-16, 6-3
- Status 5-3
- supervisor engine (table) 5-4
- switching modules 5-15
- switching modules (table) 5-4
- switch load indicators 5-3
- levers, ejector (figure) 5-20, 5-21
- link status LED 5-4
- load sharing, power supplies 1-16
- MAC addresses 1-3, 1-8
- management
- Ethernet 5-4
- local 1-2, 1-7
- performance 1-4, 1-9
- remote 1-2, 1-7
- Media Access Control addresses
- See MAC addresses
- memory, specifications A-3, A-6
- microprocessor, specifications A-3, A-6
- modules
- filler plate 5-19
- supervisor engines 5-2
- multimode fiber-optic cabling
- patch cord 5-30
- Output Fail LED 1-17
- overfilled launch condition C-2
- oversubscribed ports 5-12
- packaging materials B-1
- PAgP 1-3, 1-8
- patch cord
- configuration (figure) 5-31
- description 5-30
- installing 5-31
- pause frames
- see flow control
- PEM 1-17, 4-11
- performance management 1-4, 1-9
- pinouts
- 10BASE-T management port A-1
- console port A-2
- Port Aggregation Protocol
- See PAgP
- power
- requirements 2-2
- power entry module
- See PEM
- power supplies 1-14
- description 1-14
- during boot 6-2
- environmental monitoring 1-17
- external power shelf 1-17
- fan assembly 1-16
- installing 4-4
- LEDs 1-16, 6-3
- load sharing 1-16
- PEM 1-17
- redundancy 1-15
- removing 4-3
- required tools 4-3
- specifications A-4, A-6, A-7
- support 1-3, 1-4, 1-8, 1-9
- troubleshooting 6-2, 6-3, 6-4
- procedures
- checking shipping container contents 3-2
- connecting system ground 2-5
- connecting terminals to the console port 5-23
- connecting to the Ethernet management port 5-22
- fan assembly installation 4-10
- fan assembly removal 4-10
- GBIC installation 5-27
- GBIC removal 5-29
- installing the PEM 4-11
- patch cord installation 5-31
- power supply installation 4-4
- power supply removal 4-3
- rack-mounting 3-3
- rack-mounting the switch 3-2
- removing and replacing the chassis fan assembly (figure) 4-8
- repacking a switch B-1
- switching module installation 5-17
- switching module removal 5-21
- switching module verification 5-32
- verifying installation 4-11
- protocols
- 802.1D Spanning Tree 1-4, 1-9
- CDP 1-4, 1-9
- CGMP 1-4, 1-9
- PS1 and PS2 LEDs 1-16
- rack-mounting
- checklist 3-4
- description 3-2
- installing (figure) 3-8
- related documentation xii
- Remote Monitoring
- See RMON
- repacking B-1
- repacking instructions B-1
- requirements
- power 2-2
- tools 3-3
- reset switch 5-4
- returns B-1
- RJ-45 connectors, usage 1-4, 1-9
- RMON 1-4, 1-9
- screws, captive installation (figure) 5-21
- serial number, chassis 6-7
- shipping instructions B-1
- show module command 5-21
- show port command 5-17, 5-29
- Simple Network Management Protocol
- See SNMP
- site planning
- checklist 2-9
- slots
- supervisor engine 1-2, 1-7
- switching modules 1-2, 1-7
- SNMP 1-4, 1-9
- specifications
- Catalyst 4003 switch A-3
- Catalyst 4006 switch A-6
- switching modules A-8
- startup
- troubleshooting 6-3
- Status LED 5-3
- supervisor engines
- 10BASE-T management port pinouts A-1
- console port 5-5, A-2
- description 5-2
- LEDs 5-4, 5-32
- management 1-4, 1-9
- slot location 1-2, 1-7
- support 1-10
- troubleshooting 6-2
- switching modules
- 12-port Gigabit Ethernet switching module 5-11
- 18-Port Gigabit Ethernet (figure) 5-11
- 24-port Fast Ethernet switching module 5-6
- 2-port Gigabit Ethernet and 32-Port 10/100-Mbps BASE-T (figure) 5-7
- 32-port 10/100/1000 BASE Layer 3 route switching module 5-8
- 48-port 10/100-Mbps Fast Ethernet (figure) 5-7
- 48-port 10/100-Mbps Fast Ethernet with RJ-21 connectors 5-7
- 48-Port Inline Power 10/100BASE-TX (figure) 5-14
- 6-Port 1000BASE-X Gigabit Ethernet (figure) 5-10
- backplane channel module (figure) 5-14
- description 5-5
- ejector levers (figure) 5-20, 5-21
- Ethernet 5-14
- Gigabit Ethernet 5-10
- installation tools 5-18
- installing 5-17 to 5-21
- LEDs 5-15
- LEDs (table) 5-4
- removing 5-21
- support 1-5, 1-10
- troubleshooting 6-3, 6-6
- verifying 5-32
- switch load indicators 5-3
- system specifications A-1
- tables
- AC-input power cord options 2-9
- temperature
- internal air 1-14
- terminals
- connecting to the console port 5-23
- connecting to the Ethernet management port 5-22
- tools, required 3-3
- troubleshooting
- contacting customer service 6-7
- fan assemblies 6-2, 6-5
- Flashcode 6-4
- initial boot 6-2
- methodology 6-2
- power supplies 6-2, 6-3, 6-4
- related documentation xii
- startup 6-3
- supervisor engines 6-2
- switching modules 6-3, 6-6
- virtual LANs
- See VLANs
- VLANs 1-3, 1-8
- VLAN Truck Protocol
- See VTP
- voltage
- AC input A-4, A-6, A-7
- VTP 1-3, 1-8
- weight, chassis A-4, A-6
- WS-U4504-FX-MT 5-9
- WS-X4019 5-14
- WS-X4124-FX-MT 5-6
- WS-X4148-RJ 5-7
- WS-X4148-RJ21 5-7
- WS-X4148-RJ45V 5-14
- WS-X4232-GB-RJ 5-7
- WS-X4232-L3 5-8
- WS-X4232-RJ-XX 5-9
- WS-X4306-GB 5-10
- WS-X4412-2GB-T 5-11
- WS-X4418-GB 5-11
- WS-X4604-GWY 5-14







Posted: Fri Apr 13 19:37:13 PDT 2001
All contents are Copyright © 1992--2001 Cisco Systems, Inc. All rights reserved.
Important Notices and Privacy Statement.