Catalyst 4908G-L3 Hardware Installation Guide
Index

Table of Contents

index

index

Numerics


1000BASE-LX/LH   2-8

1000BASE-SX   2-8

1000BASE-ZX   2-8

A


airflow
direction   1-5
fan assembly   1-5
specifications   A-2

auxiliary ports
description   1-2
specifications   A-4

C


Catalyst 4908G-L3 switch router
labeling   1-3

chassis
cooling   1-5
dimensions   A-2

commands
show interface   2-12
shutdown   2-10, 2-12

components
fan assembly   1-5
GBICs   2-8
power supplies   1-6
switching   A-2

console ports
description   1-2
specifications   A-4

conventions, document   xi

customer service   B-4

D


DC-input power supplies
terminal block connectors   2-16

differential mode delay   C-1

dimensions
chassis   A-2
equipment rack   2-6

document conventions   xi

E


environmental monitoring
description   1-6
power supplies   1-6

F


fans
airflow   1-5
description   1-5
failure   1-6
troubleshooting   B-3

G


GBICs
care   2-10
compliance   2-9
description   2-8
handling   2-10
lifetime   2-10
maintaining   2-10
plug removal (caution)   2-11
third-party vendors (note)   2-8

Gigabit Ethernet ports
specifications   A-5

Gigabit Interface Converters
See GBICs

L


lasers   C-2

L brackets
attaching   2-6
attaching (figure)   2-7

LEDs
description   B-2
port (figure)   1-4
power supplies   B-2

M


management ports
auxiliary   1-2
console   1-2
figure   1-3

mounting posts
dimensions   2-6
L brackets   2-7

O


overfilled launch condition   C-2

P


patch cords
compliance   2-8
description   2-8

pinouts
auxiliary port   A-4
console port   A-4

ports
auxiliary   1-2
auxiliary pinouts (table)   A-4
console   1-2
console pinouts (table)   A-4
Gigabit Ethernet   1-2
specifications   A-4  to A-5

power
connecting   2-7
general requirements   2-2
loss prevention   2-2, 2-3
maximum load (caution)   2-2, 2-3
multiple connections (caution)   2-14
redundant (note)   2-3
specifications   A-2
troubleshooting   B-3

power supplies
description   1-6
environmental monitoring   1-6
LEDs   B-2
redundant   1-6
troubleshooting   B-2, B-3

R


rack-mounting
figure   2-7
guidelines   2-4
preparing for   2-5
system   2-5

removing
screws   2-6

RPSs
description   1-6

S


safety
preinstallation   2-1
translated warnings   D-1

service and support   B-4

show interface command   2-12

shutdown command   2-10, 2-12

site planning
general requirements   2-2
overview   2-2

specifications
auxiliary ports   A-4
console ports   A-4
frequency   A-2
GBIC cabling (table)   A-5
Gigabit Ethernet ports   A-5
memory   A-2
power   A-2
switching components   A-2

T


temperature
ambient   2-2
environmental monitor   2-2
thresholds   2-2

terminal blocks
connectors, DC-input power supply   2-16

tools, required   2-5

troubleshooting
components   B-3
contacting customer service   B-4
power supplies   B-2, B-3

W


warnings
translated   D-1

weight, chassis   A-2