![]() |
CDDI/FDDI C1400 Concentrator Installation and Configuration Gui
|
||||||||||
Hardware Installation
![]() |
|||||||||||
Table of ContentsHardware InstallationInstallation Overview
Unpacking and Inspection Installing the Hardware What to Do after the Hardware Is Installed Hardware InstallationThis chapter provides complete instructions for installing and cabling the Workgroup WS-C1400 Concentrator. Specific topics covered in this chapter include the following:
Before you install the concentrator, read the chapter "Preparing for Installation." Installation OverviewThere are many ways to configure and connect the concentrator. The following overview is specific to a UTP installation:
Note The default for the set attach command is dual attachment. If you are using your concentrator in a dual attachment configuration, you do not need to set this parameter.
Unpacking and InspectionBefore you install the concentrator, examine all shipping containers and contents for damage and check for missing items. If damage occurred to the containers during shipping, notify your carrier. Unpack and examine the contents of the containers. You should have the following items:
Fill out the warranty registration sheet and mail or fax it to Cisco Systems, Inc. today. Report any missing parts and any damage not related to shipping to your customer service representative. Note Keep the packing materials for reuse. All materials returned under warranty must be packed in their original packing materials. Installing the HardwareYou can mount the concentrator in a standard 19-inch rack or place it on a desktop.
Rack-Mount InstallationThe concentrator can be mounted in an open or closed EIA-standard
Following is the procedure for rack-mounting the concentrator: Step 1 Attach a rack-mount (L-shaped) bracket to each side of the concentrator with the supplied Phillips machine screws. Mount each bracket with the tab positioned toward the front or rear, depending on your installation, of the concentrator. (See Figure 3-1.)
Figure 3-1: ![]() Attaching the Rack-Mount Brackets to the Concentrator Step 2 Secure both brackets tightly. Step 3 Position the concentrator in the rack at the desired location and align the holes on the bracket tabs with the holes in the rack. Step 4 Attach the concentrator to the rack using screws you provide. (See Figure 3-2.) Figure 3-2: ![]() Rack-Mounted Concentrator--Open Rack Shown Step 5 Proceed to the section "What to Do after the Hardware Is Installed." Desktop InstallationThe concentrator operates at a low noise level, which makes it suitable for any desktop environment. Place it on a clear and level location. Leave at least 3 inches (7.6 cm) clearance at the sides for proper ventilation, and sufficient space at the rear for easy access to cables, LEDs, and line cards. Proceed to the section "What to Do after the Hardware Is Installed."
What to Do after the Hardware Is InstalledAfter installing the chassis hardware, proceed to the chapter "Connecting to the Network" for the procedures required to attach all cables to the concentrator. For the information necessary to configure the software portion of the system based on your requirements, proceed to the chapter "Configuring the System Software" and the appendix "Command Reference." |
|||||||||||
|
|