Cisco® announces the end-of-sale and end-of life dates for the CiscoWorks Wireless LAN Solution Engine 2.7 Upgrade from 1.x and 2.x Software. The last day to order the affected product(s) is November 13, 2004. Customers with active service contracts will continue to receive support from the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists the product part numbers affected by this announcement. For customers with active and paid service and support contracts, support will be available until the termination date of the contract, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1. End-of-Life Milestones and Dates for the CiscoWorks Wireless LAN Solution Engine 2.7 Upgrade from 1.x and 2.x Software
Milestone
Definition
Date
End-of-Life Announcement Date
The date the document that announces the end of sale and end of life of a product is distributed to the general public.
May 15, 2004
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no longer for sale after this date.
November 13, 2004
Last Ship Date:
App. SW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. Actual ship date is dependent on lead time.
February 11, 2005
End of SW Maintenance Releases Date:
App. SW
The last date that Cisco Engineering may release any final software maintenance releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product software.
November 13, 2005
End of New Service Attachment Date:
App. SW
For equipment and software that is not covered by a service-and-support contract, this is the last date to order a new service-and-support contract or add the equipment and/or software to an existing service-and-support contract.
November 13, 2005
End of Service Contract Renewal Date:
App. SW
The last date to extend or renew a service contract for the product.
February 9, 2007
Last Date of Support:
App. SW
The last date to receive service and support for the product. After this date, all support services for the product are unavailable, and the product becomes obsolete.
November 13, 2007
HW = Hardware OS SW = Operating System Software App. SW = Application Software
Table 2. Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
Replacement Product Part Number
Replacement Product Description
CWWLSE-2.7-SWUP-K9
Upgrade to CWWLSE 2.7 software from 1.x and 2.X software
CWWLSE-2.12SWUP-K9
Upgrade to CWWLSE 2.12 software from 1.x and 2.X software