Table Of Contents
Numerics - A - C - D - E - F - G - H - I - L - M - N - P - R - S - T - W -
index
Numerics
1000BASE-LX/LH 2-5
1000BASE-SX 2-5
1000BASE-ZX 2-5
A
airflow
direction 1-6
fan assembly 1-6
fan failure 1-7
specifications A-2
auxiliary ports
description 1-3
specifications B-6
C
Catalyst 4840G SLB switches
components 1-1
labeling 1-4, 1-5
specifications A-1
CCO
description xiv
services xiv
chassis
cooling 1-6
dimensions A-2
labeling 1-4
Cisco RPSs
troubleshooting D-4
commands
no shutdown 2-8
show interface 2-9
shutdown 2-7, 2-9
components
fan assembly 1-6
Flash PC cards 1-3
GBICs 2-5
power supplies 1-7
switching A-1
console ports
description 1-3
specifications B-5
conventions
cautions x
description x
notes x
warning xi
customer service
contacting D-5
TAC xiv, xv
D
differential mode delay
See DMD
dimensions
chassis A-2
equipment rack 2-3, 2-17
DMD
advantages C-1
description C-1
occurrences C-1
solution C-2
documentation
audience ix
CD-ROM xiv
conventions x
feedback xvi
obtaining xiii
ordering xiv
organization ix
related xiii
E
environmental monitoring
description 1-7
power supplies 1-7
F
fans
airflow 1-6
description 1-6
failure 1-7
troubleshooting D-2
Fast Ethernet ports
connecting to 2-14
connectors 2-14
Flash PC cards
components 1-3
description 1-3
installing 2-10
G
GBICs
cabling specifications B-3
care 2-6
GBICs (continued)
compliance 2-10
description 2-5
handling 2-6
installation 2-5
lifetime 2-6
maintenance 2-6
plug removal (caution) 2-8
removing 2-9
third party vendors (note) 2-6
Gigabit Ethernet ports
connecting to 2-13
connectors 2-13
specifications B-3
Gigabit Interface Converters. See GBICs
H
heat dissipation
determining 2-2
power 2-2
I
installing
Flash PC cards 2-10
GBICs 2-5
patch cords 2-10
L
laser transmission
description C-1 to C-3
L brackets
attaching 2-17
LEDs
description D-3
link status 1-4
location 1-4
power supplies 1-4, D-3
switching port 1-4
M
management ports
auxiliary 1-3
connecting to 2-15
connectors 2-15
console 1-3
mounting posts
dimensions 2-3, 2-17
L brackets 2-4, 2-18
N
network connections
connectors
RJ-45 connector B-3
P
patch cords
compliance 2-9
description 2-9
installing 2-10
requirements 2-9
pinouts
auxiliary port B-6
console port B-5
ports
auxiliary 1-3
auxiliary pinouts (table) B-6
configured 1-4
console 1-3
console pinouts (table) B-5
Fast Ethernet B-2
Gigabit Ethernet 1-2
labeling 1-4
numbering 1-4
specifications B-3, B-5
switching 1-2
power
connecting 2-5, 2-19
general requirements 2-2
heat dissipation 2-2
loss prevention 2-2
maximum load (caution) 2-2
site requirements 2-2
specifications A-2
troubleshooting D-2
power supplies
description 1-7
environmental monitoring 1-7
LEDs D-3
troubleshooting D-3, D-4
R
rack-mounting
guidelines 2-2
preparing for 2-2, 2-17
RPS II 2-16, 2-17
system 2-2
redundant power supply units
See Cisco RPSs D-4
removing
GBICs 2-9
screws 2-4
RSP II
connecting
cold install 2-20
hot install 2-19
connecting to the switch 2-16, 2-19
installing 2-16, 2-21
rack-mounting 2-16
removing 2-16, 2-22
S
safety
preinstall 2-1
translated warnings E-1
service and support D-5
site planning
general requirements 2-2
overview 2-2
SLB switches. See Catalyst 4840G SLB switches
specifications
auxiliary ports B-6
cable A-1, B-1
Catalyst 4840G SLB switches A-1, B-1
console ports B-5
Fast Ethernet ports B-2
frequency A-2
GBIC cabling (table) B-3
Gigabit Ethernet ports B-3
memory A-1
power A-2
status LEDs 1-6
T
TAC
contact xv
description xv
obtaining xiv
Technical Assistance Center. See TAC
temperature
ambient 2-2
environmental monitor 2-2
thresholds 2-2
tools, required 2-2, 2-16
troubleshooting
contacting customer service D-5
methodology D-2
power supplies D-3, D-4
W
warnings
conventions xi
description xi
translated E-1
weight, chassis A-2