Table Of Contents
Numerics - A - B - C - D - E - F - G - L - N - P - R - S - T -
Index
Numerics
10-Gigabit Ethernet SFP+ transceivers
copper cables 1-9, 1-14, 1-25, 1-36, 1-48
description 1-9, 1-13, 1-24, 1-36, 1-47
16-port GEM 1-5
A
accessory kit
contents F-1, F-2
airflow direction 2-2
B
back-to-front airflow 2-2
brackets
front rack-mount 2-6, 2-10, 2-12, 2-15
C
cabinets
perforated (requirements) A-2
cabling
requirements 3-1
chassis
description 1-2, 1-27, 1-38
dimensions 1-27, B-1, B-2
grounding 2-22, 2-24
installation guidelines 2-3
installing in a rack (procedure) 2-6, 2-10, 2-12, 2-15
removing from rack (procedure) 4-17
system grounding 2-17
weight 2-2, B-1, B-2
Cisco Nexus 5010
cross-connect ports 1-39
network-management ports 1-39
Cisco Nexus 5020
cross-connect ports 1-28
network-management ports 1-28
Cisco Nexus 5020 switch
connecting a system ground 2-21
description 1-2, 1-26, 1-37
dimensions 1-27, 1-38, B-1, B-2
expansion modules 1-4, 1-29, 1-39
fan module 1-8, 1-13, 1-22, 1-35, 1-46
features 1-15, 1-27, 1-37
grounding the chassis 2-24
installing in a cabinet 2-9, 2-11, 2-15
installing in a rack 2-9, 2-11, 2-15
LEDs D-2
port grouping 1-32, 1-44
port numbering 1-6, 1-20, 1-32, 1-44
powering up 2-25
power supply 1-20, 1-34, 1-45
power supply LED descriptions 1-20, 1-34, 1-45
rear view 1-16, 1-27, 1-38
removing from a rack (procedure) 4-17
supported SFP transceivers 1-8, 1-9, 1-13, 1-14, 1-36, 1-47
system ground location (figure) 2-24
Cisco Nexus 5548 switches
dimensions 1-15
Cisco Nexus 5596
console ports 1-3, 1-11
network-management ports 1-3, 1-11
Cisco Nexus 5596UP switch
dimensions 1-2, 1-10
fan module
LED 1-8
features 1-2, 1-10
front view 1-2, 1-10
installing in a cabinet 2-5
installing in a rack 2-5
power redundancy 1-7, 1-13
power supply 1-7, 1-13
rear view 1-4, 1-11
console port
connecting (figure) 3-2
connecting (procedure) 3-3
pinouts C-2, C-3
console ports
Cisco Nexus 5596 1-3, 1-11
contact and site information
records G-3
worksheet G-3
cross-connect ports
Cisco Nexus 5010 1-39
Cisco Nexus 5020 1-28
D
dimensions
chassis B-1, B-2
E
electrostatic discharge (ESD)
prevention guidelines 2-19
Ethernet connector port
connecting (procedure) 3-3
Ethernet expansion module
description 1-5, 1-30, 1-31, 1-41, 1-42
port numbering (figure) 1-33
Ethernet LEDs
description D-4
Ethernet ports
connecting 3-4
expansion modules
description 1-4, 1-29
installing (procedure) 4-5, 4-7
removing (procedure) 4-5
specifications B-3
F
fan modules
description 1-8, 1-13, 1-22, 1-35, 1-46
installing (procedure) 4-14
LED descriptions 1-23, 1-35, 1-47
removing (procedure) 4-14
FCoE protocol
description 1-26, 1-37
fiber optic cables
maintaining 3-11
Fibre Channel over Ethernet protocol. See FCoE protocol
Fibre Channel plus Ethernet expansion module
description 1-29
port grouping 1-5
port numbering (figure) 1-6, 1-33
Fibre Channel ports
connecting 3-7
front-to-back airflow 2-2
G
GEMs
16-port Fibre Channel and Ethernet 1-5
grounding
attaching the ESD wrist strap (procedure) 2-19
attaching the ESD wrist strap to the system ground (figure) 2-20
best practices 2-17
chassis 2-22, 2-24
establishing the system ground 2-21
tools and equipment to connect the system ground 2-21
guides
rack-mount 2-6, 2-10, 2-13, 2-16
L
LC-type cables
connecting to Fibre Channel ports 3-10
LED descriptions
switch D-2
N
network connections
preparing 3-2
network-management ports
Cisco Nexus 5010 1-39
Cisco Nexus 5020 1-28
Cisco Nexus 5596 1-3, 1-11
P
port numbering
description 1-6, 1-20, 1-32, 1-44
power cords
jumper power cord (figure) C-10
length C-3
supported power cords (table) C-3
power supplies
blank filler panel (figure) 1-34, 1-46
description 1-7, 1-20, 1-22, 1-34, 1-45, 1-46
installing (procedure) 4-11
LED descriptions D-3, E-2
removing (procedure) 4-9
specifications B-3, B-4, B-5
power supply
Cisco Nexus 5596UP 1-7, 1-13
pre-installation
guidelines 2-2
options 2-2
unpacking the switch 2-4
R
rack 2-5, 2-9, 2-12, 2-15
rack-mount installation
procedure 2-6, 2-10, 2-12, 2-15
rack-mount kit
contents 2-5, 2-9, 2-12, 2-15
records
chassis serial number G-4
contact and site information G-3
site planning and maintenance G-1
required equipment
switch installation 2-4
RJ-45 connector
pinouts C-2
S
screw torques
description 2-3
SFP+ transceivers
installing (procedure) 3-4
installing a cable (procedure) 3-6
removing (procedure) 3-5
removing a cable (procedure) 3-7
specifications B-6
SFP transceivers
description 3-8
installing (procedure) 3-8
installing a cable 3-6
removing (procedure) 3-8
removing a cable (procedure) 3-11
specifications B-6
supported 1-8, 1-13, 1-23, 1-36, 1-47
site planning
checklist G-2
Small-Form-Factor Pluggable transceivers. See SFP transceivers
specifications
environmental B-2
expansion modules B-3
physical B-1, B-2
power supplies B-3, B-4, B-5
transceivers B-6
switch installation
equipment required 2-4
guidelines 2-3
screw torques 2-3
T
transceivers, supported SFPs. See SFP transceivers
troubleshooting
best practices E-2