Cisco Nexus 5000 Series Hardware Installation Guide
Index

Table Of Contents

Numerics - A - B - C - D - E - F - G - L - N - P - R - S - T -

Index

Numerics

10-Gigabit Ethernet SFP+ transceivers

copper cables 1-9, 1-14, 1-25, 1-36, 1-48

description 1-9, 1-13, 1-24, 1-36, 1-47

16-port GEM 1-5

A

accessory kit

contents F-1, F-2

airflow direction 2-2

B

back-to-front airflow 2-2

brackets

front rack-mount 2-6, 2-10, 2-12, 2-15

C

cabinets

perforated (requirements) A-2

cabling

requirements 3-1

chassis

description 1-2, 1-27, 1-38

dimensions 1-27, B-1, B-2

grounding 2-22, 2-24

installation guidelines 2-3

installing in a rack (procedure) 2-6, 2-10, 2-12, 2-15

removing from rack (procedure) 4-17

system grounding 2-17

weight 2-2, B-1, B-2

Cisco Nexus 5010

cross-connect ports 1-39

network-management ports 1-39

Cisco Nexus 5020

cross-connect ports 1-28

network-management ports 1-28

Cisco Nexus 5020 switch

connecting a system ground 2-21

description 1-2, 1-26, 1-37

dimensions 1-27, 1-38, B-1, B-2

expansion modules 1-4, 1-29, 1-39

fan module 1-8, 1-13, 1-22, 1-35, 1-46

features 1-15, 1-27, 1-37

grounding the chassis 2-24

installing in a cabinet 2-9, 2-11, 2-15

installing in a rack 2-9, 2-11, 2-15

LEDs D-2

port grouping 1-32, 1-44

port numbering 1-6, 1-20, 1-32, 1-44

powering up 2-25

power supply 1-20, 1-34, 1-45

power supply LED descriptions 1-20, 1-34, 1-45

rear view 1-16, 1-27, 1-38

removing from a rack (procedure) 4-17

supported SFP transceivers 1-8, 1-9, 1-13, 1-14, 1-36, 1-47

system ground location (figure) 2-24

Cisco Nexus 5548 switches

dimensions 1-15

Cisco Nexus 5596

console ports 1-3, 1-11

network-management ports 1-3, 1-11

Cisco Nexus 5596UP switch

dimensions 1-2, 1-10

fan module

LED 1-8

features 1-2, 1-10

front view 1-2, 1-10

installing in a cabinet 2-5

installing in a rack 2-5

power redundancy 1-7, 1-13

power supply 1-7, 1-13

rear view 1-4, 1-11

console port

connecting (figure) 3-2

connecting (procedure) 3-3

pinouts C-2, C-3

console ports

Cisco Nexus 5596 1-3, 1-11

contact and site information

records G-3

worksheet G-3

cross-connect ports

Cisco Nexus 5010 1-39

Cisco Nexus 5020 1-28

D

dimensions

chassis B-1, B-2

E

electrostatic discharge (ESD)

prevention guidelines 2-19

Ethernet connector port

connecting (procedure) 3-3

Ethernet expansion module

description 1-5, 1-30, 1-31, 1-41, 1-42

port numbering (figure) 1-33

Ethernet LEDs

description D-4

Ethernet ports

connecting 3-4

expansion modules

description 1-4, 1-29

installing (procedure) 4-5, 4-7

removing (procedure) 4-5

specifications B-3

F

fan modules

description 1-8, 1-13, 1-22, 1-35, 1-46

installing (procedure) 4-14

LED descriptions 1-23, 1-35, 1-47

removing (procedure) 4-14

FCoE protocol

description 1-26, 1-37

fiber optic cables

maintaining 3-11

Fibre Channel over Ethernet protocol. See FCoE protocol

Fibre Channel plus Ethernet expansion module

description 1-29

port grouping 1-5

port numbering (figure) 1-6, 1-33

Fibre Channel ports

connecting 3-7

front-to-back airflow 2-2

G

GEMs

16-port Fibre Channel and Ethernet 1-5

grounding

attaching the ESD wrist strap (procedure) 2-19

attaching the ESD wrist strap to the system ground (figure) 2-20

best practices 2-17

chassis 2-22, 2-24

establishing the system ground 2-21

tools and equipment to connect the system ground 2-21

guides

rack-mount 2-6, 2-10, 2-13, 2-16

L

LC-type cables

connecting to Fibre Channel ports 3-10

LED descriptions

switch D-2

N

network connections

preparing 3-2

network-management ports

Cisco Nexus 5010 1-39

Cisco Nexus 5020 1-28

Cisco Nexus 5596 1-3, 1-11

P

port numbering

description 1-6, 1-20, 1-32, 1-44

power cords

jumper power cord (figure) C-10

length C-3

supported power cords (table) C-3

power supplies

blank filler panel (figure) 1-34, 1-46

description 1-7, 1-20, 1-22, 1-34, 1-45, 1-46

installing (procedure) 4-11

LED descriptions D-3, E-2

removing (procedure) 4-9

specifications B-3, B-4, B-5

power supply

Cisco Nexus 5596UP 1-7, 1-13

pre-installation

guidelines 2-2

options 2-2

unpacking the switch 2-4

R

rack 2-5, 2-9, 2-12, 2-15

rack-mount installation

procedure 2-6, 2-10, 2-12, 2-15

rack-mount kit

contents 2-5, 2-9, 2-12, 2-15

records

chassis serial number G-4

contact and site information G-3

site planning and maintenance G-1

required equipment

switch installation 2-4

RJ-45 connector

pinouts C-2

S

screw torques

description 2-3

SFP+ transceivers

installing (procedure) 3-4

installing a cable (procedure) 3-6

removing (procedure) 3-5

removing a cable (procedure) 3-7

specifications B-6

SFP transceivers

description 3-8

installing (procedure) 3-8

installing a cable 3-6

removing (procedure) 3-8

removing a cable (procedure) 3-11

specifications B-6

supported 1-8, 1-13, 1-23, 1-36, 1-47

site planning

checklist G-2

Small-Form-Factor Pluggable transceivers. See SFP transceivers

specifications

environmental B-2

expansion modules B-3

physical B-1, B-2

power supplies B-3, B-4, B-5

transceivers B-6

switch installation

equipment required 2-4

guidelines 2-3

screw torques 2-3

T

transceivers, supported SFPs. See SFP transceivers

troubleshooting

best practices E-2