Site Preparation and Maintenance Records
Site Preparation Checklist
Contact and Site Information
Chassis and Module Information
Site Preparation and Maintenance Records
This appendix includes the following records to use when installing the Cisco Nexus 2000 Series Fabric Extender (FEX):
•
Site Preparation Checklist
•
Contact and Site Information
•
Chassis and Module Information
Note
For information about how to query the device for configuration information, see the Cisco Nexus 2000 Switch Configuration Guide.
Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful device operation, ventilation, and accessibility. Table G-1 lists the site planning tasks that we recommend completing before installing the Cisco Nexus 2000 Series Fabric Extender.
Consider heat dissipation when sizing the air-conditioning requirements for an installation. See Table B-2 for the environmental requirements and the "Power Specifications" section for power and heat ratings.
Table G-1 Site Planning Checklist
Task No.
|
Planning Activity
|
Verified By
|
Time
|
Date
|
1
|
Space evaluation:
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Maintenance access
|
|
|
|
2
|
Environmental evaluation:
• Ambient temperature
• Humidity
• Altitude
• Atmospheric contamination
• Air flow
|
|
|
|
3
|
Power evaluation:
• Input power type
• Power receptacles1
• Receptacle proximity to the equipment
• Dedicated circuit for power supply
• Dedicated (separate) circuits for redundant power supplies
• UPS2 for power failures
|
|
|
|
4
|
Grounding evaluation:
• Circuit breaker size
• CO ground (AC-powered systems)
|
|
|
|
5
|
Cable and interface equipment evaluation:
• Cable type
• Connector type
• Cable distance limitations
• Interface equipment (transceivers)
|
|
|
|
6
|
EMI3 evaluation:
• Distance limitations for signaling
• Site wiring
• RFI4 levels
|
|
|
|
Contact and Site Information
Use the following worksheet (see Table G-2) to record contact and site information.
Table G-2 Contact and Site Information
Contact person
|
|
Contact phone
|
|
Contact e-mail
|
|
Building/site name
|
|
Data center location
|
|
Floor location
|
|
Address (line 1)
|
|
Address (line 2)
|
|
City
|
|
State
|
|
Zip code
|
|
Country
|
|
Chassis and Module Information
Use the following worksheets (see Table G-3 and Table G-4) to record information about the chassis and modules.
Contract Number_______________________________________________
Chassis Serial Number___________________________________________
Product Number________________________________________________
Table G-3 Network-Related Information
Device IP address
|
|
Device IP netmask
|
|
Host Name
|
|
Domain name
|
|
IP broadcast address
|
|
Gateway/router address
|
|
DNS address
|
|
Modem telephone number
|
|
Table G-4 Module Information
Slot
|
Module Type
|
Module Serial Number
|
Notes
|
1
|
Supervisor
|
|
|
2
|
|
|
|
Note
The supervisor module and the interface module are not removable.