Cisco Nexus 2000 Series Hardware Installation Guide
Site Planning and Maintenance Records

Table Of Contents

Site Preparation and Maintenance Records

Site Preparation Checklist

Contact and Site Information

Chassis and Module Information


Site Preparation and Maintenance Records


This appendix includes the following records to use when installing the Cisco Nexus 2000 Series Fabric Extender (FEX):

Site Preparation Checklist

Contact and Site Information

Chassis and Module Information


Note For information about how to query the device for configuration information, see the Cisco Nexus 2000 Switch Configuration Guide.


Site Preparation Checklist

Planning the location and layout of your equipment rack or wiring closet is essential for successful device operation, ventilation, and accessibility. Table G-1 lists the site planning tasks that we recommend completing before installing the Cisco Nexus 2000 Series Fabric Extender.

Consider heat dissipation when sizing the air-conditioning requirements for an installation. See Table B-2 for the environmental requirements and the "Power Specifications" section for power and heat ratings.

Table G-1 Site Planning Checklist 

Task No.
Planning Activity
Verified By
Time
Date

1

Space evaluation:

Space and layout

Floor covering

Impact and vibration

Lighting

Maintenance access

     

2

Environmental evaluation:

Ambient temperature

Humidity

Altitude

Atmospheric contamination

Air flow

     

3

Power evaluation:

Input power type

Power receptacles1

Receptacle proximity to the equipment

Dedicated circuit for power supply

Dedicated (separate) circuits for redundant power supplies

UPS2 for power failures

     

4

Grounding evaluation:

Circuit breaker size

CO ground (AC-powered systems)

     

5

Cable and interface equipment evaluation:

Cable type

Connector type

Cable distance limitations

Interface equipment (transceivers)

     

6

EMI3 evaluation:

Distance limitations for signaling

Site wiring

RFI4 levels

     

1 Verify that the power supply installed in the chassis has a dedicated AC source circuit.

2 UPS = uninterruptible power supply.

3 EMI = electromagnetic interference.

4 RFI = radio frequency interference.


Contact and Site Information

Use the following worksheet (see Table G-2) to record contact and site information.

Table G-2 Contact and Site Information

Contact person
 
Contact phone
 
Contact e-mail
 
Building/site name

 

Data center location

 

Floor location
 
Address (line 1)
 
Address (line 2)
 
City

 

State
 
Zip code
 
Country
 

Chassis and Module Information

Use the following worksheets (see Table G-3 and Table G-4) to record information about the chassis and modules.

Contract Number_______________________________________________

Chassis Serial Number___________________________________________

Product Number________________________________________________

Table G-3 Network-Related Information

Device IP address
 
Device IP netmask
 
Host Name
 
Domain name
 
IP broadcast address
 
Gateway/router address
 
DNS address
 
Modem telephone number
 

Table G-4 Module Information

Slot
Module Type
Module Serial Number
Notes
1
Supervisor

 

 

2
 

 

 



Note The supervisor module and the interface module are not removable.