Table Of Contents
Managing the Switch Hardware
Displaying the Switch Hardware Inventory
Displaying the Switch Serial Number
Displaying Power Usage Information
Power Supply Configuration Modes
Power Supply Configuration Overview
Configuring the Power Supply Mode
Power Supply Configuration Guidelines
Information About Modules
Supervisor Modules
I/O Modules
Fabric Modules
Verifying the Status of a Module
Checking the State of a Module
Connecting to a Module
Accessing an I/O Module Through the Console
Shutting Down Modules
Shutting Down a Supervisor
Shutting Down a Fabric Module
Shutting Down an I/O Module
Information About Module Temperature
Overview of Module Temperatures
Displaying the Module Temperature
Displaying Environment Information
Reloading Modules
Reloading the Switch
Power Cycling Modules
Saving the Module Configuration
Purging the Module Configuration
Changing the Amount of Power Reserved for Fabric Modules
Information About Fan Trays
Configuring EPLDs
Deciding When to Upgrade EPLDs
Switch Requirements
EPLDs Available with Releases 5.0(2) through 6.1(3)
Determining Whether to Upgrade EPLDs
Downloading the EPLD Images
EPLD Images Needed for vPCs
EPLD Images Needed for LISP
Installation Guidelines
Preparing the EPLD Images for Installation
Upgrading the EPLD Images
Verifying the EPLD Upgrades
Displaying the Available EPLD Versions
Displaying the Status of EPLD Upgrades
Default Settings
Managing the Switch Hardware
This chapter describes how to manage the switch hardware, which includes the fabric and I/O modules, and it provides information on how to monitor system and module states. This chapter includes the following sections:
•
Displaying the Switch Hardware Inventory
•
Displaying the Switch Serial Number
•
Displaying Power Usage Information
•
Power Supply Configuration Modes
•
Information About Modules
•
Verifying the Status of a Module
•
Checking the State of a Module
•
Connecting to a Module
•
Accessing an I/O Module Through the Console
•
Shutting Down Modules
•
Information About Module Temperature
•
Displaying Environment Information
•
Reloading Modules
•
Saving the Module Configuration
•
Purging the Module Configuration
•
Changing the Amount of Power Reserved for Fabric Modules
•
Information About Fan Trays
•
Configuring EPLDs
•
Default Settings
Displaying the Switch Hardware Inventory
You can display information about the field replaceable units (FRUs), including product IDs, serial numbers, and version IDs by entering the show inventory command. See Example 8-1.
Example 8-1 Displaying the Hardware Inventory
NAME: "Chassis", DESCR: "Nexus7000 C7009 (9 Slot) Chassis "
PID: N7K-C7009 , VID: V01 , SN: JAF1437APPD
NAME: "Slot 1", DESCR: "Supervisor module-1X"
PID: N7K-SUP-1 , VID: V09 , SN: JAF1414AQFD
NAME: "Slot 2", DESCR: "Supervisor module-1X"
PID: N7K-SUP-1 , VID: V03 , SN: JAF1240AHNH
NAME: "Slot 3", DESCR: "10/100/1000 Mbps Ethernet Module"
PID: N7K-M148GT-11 , VID: V01 , SN: JAB115000NJ
NAME: "Slot 4", DESCR: "10 Gbps Ethernet Module"
PID: N7K-M132XP-12 , VID: V01 , SN: JAB1152010A
NAME: "Slot 5", DESCR: "10/100/1000 Mbps Ethernet XL Module"
PID: N7K-M148GT-11L , VID: 0 , SN: JAF1416ABPM
NAME: "Slot 6", DESCR: "10 Gbps Ethernet XL Module"
PID: N7K-M108X2-12L , VID: 0 , SN: JAF1333AAJR
NAME: "Slot 7", DESCR: "1000 Mbps Optical Ethernet Module"
PID: N7K-M148GS-11 , VID: V02 , SN: JAF1409APRB
NAME: "Slot 8", DESCR: "1/10 Gbps Ethernet Module"
PID: N7K-F132XP-15 , VID: V01 , SN: JAF1424CFJR
NAME: "Slot 9", DESCR: "1/10 Gbps Ethernet Module"
PID: N7K-F132XP-15 , VID: V01 , SN: JAF1321ANHP
NAME: "Slot 10", DESCR: "Fabric card module"
PID: N7K-C7009-FAB-2 , VID: V01 , SN: JAF1448ARHJ
NAME: "Slot 11", DESCR: "Fabric card module"
PID: N7K-C7009-FAB-2 , VID: V01 , SN: JAF1451BSSF
NAME: "Slot 12", DESCR: "Fabric card module"
PID: N7K-C7009-FAB-2 , VID: V01 , SN: JAF1448ARHQ
NAME: "Slot 13", DESCR: "Fabric card module"
PID: N7K-C7009-FAB-2 , VID: V01 , SN: JAF1509BHBE
NAME: "Slot 14", DESCR: "Fabric card module"
PID: N7K-C7009-FAB-2 , VID: V01 , SN: JAF1509BHCB
NAME: "Slot 33", DESCR: "Nexus7000 C7009 (9 Slot) Chassis Power Supply"
PID: N7K-AC-6.0KW , VID: V01 , SN: DTM141600XT
NAME: "Slot 34", DESCR: "Nexus7000 C7009 (9 Slot) Chassis Power Supply"
PID: N7K-AC-6.0KW , VID: V01 , SN: DTM1414007T
NAME: "Slot 35", DESCR: "Nexus7000 C7009 (9 Slot) Chassis Fan Module"
PID: N7K-C7009-FAN , VID: V00 , SN: JAF1433DDEJ
To display switch hardware inventory details, enter the show hardware command. See Example 8-2.
Example 8-2 Displaying Hardware Information
Cisco Nexus Operating System (NX-OS) Software
TAC support: http://www.cisco.com/tac
Copyright (c) 2002-2010, Cisco Systems, Inc. All rights reserved.
The copyrights to certain works contained in this software are
owned by other third parties and used and distributed under
license. Certain components of this software are licensed under
the GNU General Public License (GPL) version 2.0 or the GNU
Lesser General Public License (LGPL) Version 2.1. A copy of each
such license is available at
http://www.opensource.org/licenses/gpl-2.0.php and
http://www.opensource.org/licenses/lgpl-2.1.php
kickstart: version 5.0(2)
BIOS compile time: 03/31/09
kickstart image file is: bootflash:/n7000-s1-kickstart.5.0.2.bin.S19
kickstart compile time: 12/25/2020 12:00:00 [03/04/2010 19:45:32]
system image file is: bootflash:/n7000-s1-dk9.5.0.2.bin.S19
system compile time: 2/7/2010 3:00:00 [03/04/2010 20:32:24]
cisco Nexus7000 C7010 (10 Slot) Chassis ("Supervisor module-1X")
Intel(R) Xeon(R) CPU with 4135780 kB of memory.
Processor Board ID JAF1309AECN
slot0: 2075246 kB (expansion flash)
Kernel uptime is 0 day(s), 1 hour(s), 5 minute(s), 53 second(s)
Last reset at 65404 usecs after Fri Dec 12 19:34:13 2008
Reason: Reset Requested by CLI command reload
Core Plugin, Ethernet Plugin
Freescale Inc mpc8343 (rev 3.1 (pvr 8083 0031)) CPU with 128 MB of memory
Part Number is 73-10877-11
Serial number is JAF1309AECN
MAC address is 00-24-98-e8-20-00
Freescale Inc mpc8343 (rev 3.1 (pvr 8083 0031)) CPU with 128 MB of memory
Part Number is 73-10877-11
Serial number is JAF1309AEFE
MAC address is 00-24-98-6f-37-92
--------------------------------
Switch hardware ID information
--------------------------------
Switch type is : Nexus7000 C7010 (10 Slot) Chassis
Model number is N7K-C7010
Part Number is 73-10900-04
Manufacture Date is Year 13 Week 10
Serial number is JAF13100003
--------------------------------
Chassis has 10 Module slots and 5 Fabric slots
--------------------------------
Module type is : 10/100/1000 Mbps Ethernet Module
Model number is N7K-M148GT-11
Part Number is 73-10098-12
Manufacture Date is Year 13 Week 6
Serial number is JAF1306AAFP
Module type is : 10/100/1000 Mbps Ethernet Module
Model number is N7K-M148GT-11
Part Number is 73-10098-12
Manufacture Date is Year 13 Week 3
Serial number is JAF1303ACPB
Module type is : 10/100/1000 Mbps Ethernet Module
Model number is N7K-M148GT-11
Part Number is 73-10098-12
Manufacture Date is Year 13 Week 9
Serial number is JAF1309ABLE
Module type is : Supervisor module-1X
Part Number is 73-10877-11
Manufacture Date is Year 13 Week 9
Serial number is JAF1309AECN
Module type is : Supervisor module-1X
Part Number is 73-10877-11
Manufacture Date is Year 13 Week 9
Serial number is JAF1309AEFE
Module type is : 10 Gbps Ethernet Module
Model number is N7K-M132XP-12
Part Number is 73-10899-09
Manufacture Date is Year 13 Week 7
Serial number is JAF1307ALCB
Module type is : 1000 Mbps Optical Ethernet Module
Model number is N7K-M148GS-11
Part Number is 73-11584-05
Manufacture Date is Year 13 Week 11
Serial number is JAF1311AEMM
Module type is : Fabric card module
Model number is N7K-C7010-FAB-1
Part Number is 73-10624-04
Manufacture Date is Year 13 Week 9
Serial number is JAF1309ACAP
Module type is : Fabric card module
Model number is N7K-C7010-FAB-1
Part Number is 73-10624-04
Manufacture Date is Year 13 Week 9
Serial number is JAF1309AAHB
Module type is : Fabric card module
Model number is N7K-C7010-FAB-1
Part Number is 73-10624-04
Manufacture Date is Year 13 Week 6
Serial number is JAF1306ANJJ
Module type is : Fabric card module
Model number is N7K-C7010-FAB-1
Part Number is 73-10624-04
Manufacture Date is Year 13 Week 9
Serial number is JAF1309ACAT
Module type is : Fabric card module
Model number is N7K-C7010-FAB-1
Part Number is 73-10624-04
Manufacture Date is Year 13 Week 6
Serial number is JAF1306ANKF
---------------------------------------
Chassis has 3 PowerSupply Slots
---------------------------------------
Power supply type is: 6000.00W 220v AC
Model number is N7K-AC-6.0KW
Part Number is 341-0230-02
Manufacture Date is Year 12 Week 16
Serial number is DTH1216T020
Power supply type is: 6000.00W 220v AC
Model number is N7K-AC-6.0KW
Part Number is 341-0230-02
Manufacture Date is Year 12 Week 17
Serial number is DTH1217T029
Power supply type is: 6000.00W 220v AC
Model number is N7K-AC-6.0KW
Part Number is 341-0230-02
Manufacture Date is Year 12 Week 15
Serial number is DTH1215T139
----------------------------------
----------------------------------
Model number is N7K-C7010-FAN-S
Part Number is 73-10741-04
Manufacture Date is Year 13 Week 3
Serial number is FOX1303XABC
Model number is N7K-C7010-FAN-S
Part Number is 73-10741-04
Manufacture Date is Year 13 Week 6
Serial number is FOX1306X03U
Model number is N7K-C7010-FAN-F
Part Number is 73-10967-02
Manufacture Date is Year 12 Week 41
Serial number is FOX1241XA6Q
Model number is N7K-C7010-FAN-F
Part Number is 73-10967-02
Manufacture Date is Year 12 Week 41
Serial number is FOX1241XA7U
Displaying the Switch Serial Number
The serial number of your Cisco Nexus 7000 Series switch can be obtained by looking at the serial number label on the back of the switch (next to the power supply), or by entering the show sprom backplane 1 command. See Example 8-3.
Example 8-3 Displaying the Switch Serial Number
switch# show sprom backplane 1
DISPLAY backplane sprom contents:
OEM String : Cisco Systems, Inc.
Product Number : N7K-C7010
Serial Number : TBM11493268
Part Number : 73-10900-04
snmpOID : 0.0.0.0.0.0.0.0
MAC Addresses : 00-1b-54-c2-1e-00
WWN software-module specific block:
License software-module specific block:
Second Serial number specific block:
Serial Number : TBM11476798
Displaying Power Usage Information
To display the actual power usage information for the entire switch, use the show environment power command. See Example 8-4. This command shows the power usage for many of the modules in the switch. For the older modules that do not have the capability to output this information, the output is shown as N/A.
Note
In a Cisco Nexus 7000 Series switch, power usage is reserved for both supervisor modules regardless of whether one or both supervisor modules are present.
Example 8-4 Displaying Power Management Information
switch# show environment power
Supply Model Output Capacity Status
------- ------------------- ----------- ----------- --------------
1 N7K-AC-6.0KW 812 W 6000 W Ok
2 N7K-AC-6.0KW 704 W 6000 W Ok
3 N7K-AC-6.0KW 727 W 6000 W Ok
Module Model Draw Allocated Status
------- ------------------- ----------- ----------- --------------
2 N7K-M148GT-11 N/A 400 W Powered-Up
3 N7K-M148GT-11 N/A 400 W Powered-Up
4 N7K-M148GT-11 N/A 400 W Powered-Up
5 N7K-SUP1 N/A 210 W Powered-Up
6 N7K-SUP1 N/A 210 W Powered-Up
7 N7K-M132XP-12 N/A 750 W Powered-Up
9 N7K-M148GS-11 284 W 400 W Powered-Up
Xb1 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb2 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb3 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb4 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb5 N7K-C7010-FAB-1 N/A 60 W Powered-Up
fan1 N7K-C7010-FAN-S 76 W 720 W Powered-Up
fan2 N7K-C7010-FAN-S 76 W 720 W Powered-Up
fan3 N7K-C7010-FAN-F 8 W 120 W Powered-Up
fan4 N7K-C7010-FAN-F 8 W 120 W Powered-Up
N/A - Per module power not available
Power Supply redundancy mode (configured) Redundant
Power Supply redundancy mode (operational) Redundant
Total Power Capacity (based on configured mode) 9000 W
Total Power of all Inputs (cumulative) 18000 W
Total Power Output (actual draw) 2243 W
Total Power Allocated (budget) 4750 W
Total Power Available for additional modules 4250 W
Power Supply Configuration Modes
This section includes the following topics:
•
Power Supply Configuration Overview
•
Power Supply Configuration Guidelines
Power Supply Configuration Overview
You can configure one of the following power modes to either use the combined power provided by the installed power supply units or to provide power redundancy when there is a power loss:
•
Combined mode—Provides the maximum amount of available power by utilizing the combined power output from all installed power supply units for switch operations. This mode does not provide redundancy.
•
Power-supply redundancy mode—Allows you to replace a power supply during switch operations. All power supplies are active. The available power is calculated as the least amount of power available from all but one of the power supply units (N+1). The reserve power is the amount of power output by the power supply unit that can output the most power. For example, if three power supply units output 3 kW, 6 kW, and 6 kW, the available power is 9 kW (3 kW + 6 kW) and the reserve power is 6 kW.
•
Input source redundancy mode—Takes power from two electrical grids so that if one grid goes down, the other grid can provide the power needed by the switch. For the Cisco Nexus 7004 chassis, each grid powers half of the power supplies. For the Cisco Nexus 7009, 7010, and 7018 chassis, each grid powers half of each power supply unit (grid A is connected to the Input 1 receptacle on each power supply unit and grid B is connected to the Input 2 receptacle on each power supply unit). The available power is the amount of power output by the portions of the power supply units that are connected to the same grid. For example, if three power supply units are connected to a 110-V grid and a 220-V grid, each power supply outputs 1.2 kW for the 110-V grid and 3.0 kW for the 220-V grid. The available power would be 3.6 kW (1.2 kW + 1.2 kW + 1.2 kW) and the reserve power would be 9.0 kW (3.0 kW + 3.0 kW + 3.0 kW).
•
Full redundancy mode—Provides both power-supply redundancy and input-source redundancy. This mode allows you to replace a power supply unit without interrupting switch operations or continue powering the switch if one of two grids goes down. The available power is the lesser amount of output power for power supply redundancy or input source redundancy.
The amount of power available for use with your Cisco Nexus 7000 Series switch depends on the number of power supply units, input voltage used, and the power mode used. To determine the amount of available power for the power supply units, see the following tables:
•
For the 3-kW AC power supply units, see Table A-11
•
For the 6-kW AC power supply units, see Table A-12
•
For the 7.5-kW AC power supply units, see Table A-13
•
For the 3-kW DC power supply units, see Table A-14
•
For the 6-kW DC power supply units, see Table A-15
Configuring the Power Supply Mode
You can configure the power supply mode.
SUMMARY STEPS
1.
config t
2.
power redundancy-mode mode
DETAILED STEPS
| |
Command
|
Purpose
|
Step 1
|
|
Enters configuration mode.
|
Step 2
|
power redundancy-mode mode
switch(config)# power redundancy-mode
redundant
switch(config)#
|
Configures one of the following power supply modes:
• For combined mode, use the combined keyword.
• For power supply redundancy, use the ps-redundant keyword.
• For input source redundancy, use the insrc-redundant keyword.
• For full redundancy, use the redundant keyword.
|
Note
To display the current power supply configuration, use the show environment power command.
Power Supply Configuration Guidelines
Follow these guidelines when configuring power supply units:
•
When power supply units with different capacities are installed in the switch, the amount of available power differs based on one of the following configuration modes:
–
Combined mode—To activate this mode, use the power redundancy-mode combined command. If the combined power provided by all of the installed power supply units meets the power requirements of all of the switch modules, then this mode is sufficient for running your switch.
For example, suppose your system has the following setup:
Power supply unit 1 outputs 6 kW.
The switch power requirement is 8.784 kW.
The following two scenarios explain what happens for different numbers of power supply units that you install:
Scenario 1: If you do not add a power supply unit, the available power (6 kW) is insufficient for the switch power requirement, so the switch powers the supervisor modules, fabric modules, and fan trays, before powering as many I/O modules as the remaining available power can support (one or more I/O modules might not be powered).
Scenario 2: If you install an additional power supply unit that can output 3 kW, the available power becomes 9.0 kW. The increased amount of available power exceeds the switch power requirement, so all of the modules and fan trays in the switch can power up.
Table 8-1 shows the results for each scenario.
Table 8-1 Combined Power Mode Scenarios
Scenario
|
Power Supply 1 (kW)
|
Power Supply 2 (kW)
|
System Usage (kW)
|
Available Power (kW)
|
Result
|
1
|
6.0
|
—
|
8.784
|
6.0
|
Available power is less than system usage, so you cannot power the entire system with this mode.
|
2
|
6.0
|
3.0
|
8.784
|
9.0
|
Available power exceeds the system usage, so you can use this mode to power your entire system.
|
–
Power supply redundancy mode—To activate this power mode, use the power redundancy-mode ps-redundant command. The power supply unit that outputs the most power provides the reserve power, and the combined output for the other power supply units becomes the available power.
For example, suppose your system has the following setup:
Power supply unit 1 outputs 3.0 kW.
Power supply unit 2 outputs 6.0 kW.
The switch power requirement is 8.784 kW.
The following three scenarios explain what happens depending on what you install for the third power supply unit:
Scenario 1: If you do not add a third power supply unit, the reserve power is 6 kW and the available power is 3 kW. The available power is insufficient for the switch power requirement, so you cannot power the entire switch.
Scenario 2: If you add a power supply unit that outputs 3 kW, the reserve power remains 6 kW and available power becomes 6 kW. The available power is still insufficient because it does not meet the switch power requirement, so you can power more modules than you could with Scenario 1, but you still cannot power the entire switch.
Scenario 3: If you add a power supply unit that outputs 7.5 kW, the reserve power becomes 7.5 kW and the available power becomes 9 kW. The available power exceeds the switch power requirement, so you can power up all of the modules and fan trays in the switch.
Table 8-2 shows the results for each scenario.
Table 8-2 Power Supply Redundancy Mode Scenarios
Scenario
|
Power Supply 1 (kW)
|
Power Supply 2 (kW)
|
Power Supply 3 (kW)
|
System Usage (kW)
|
Available Power (kW)
|
Reserve Power (kW)
|
Result
|
1
|
3.0
|
6.0
|
—
|
8.784
|
6.0
|
—
|
The available power does not meet the system usage requirement, so you cannot power the entire system with this power supply configuration and mode.
|
2
|
3.0
|
6.0
|
3.0
|
8.784
|
6.0
|
6.0
|
The available power does not meet the system usage, so you cannot power the entire system with this power supply configuration and mode.
|
3
|
3.0
|
6.0
|
7.5
|
8.784
|
9.0
|
7.5
|
The available power exceeds the system usage, so you can power the entire system with this power supply configuration and mode.
|
–
Input source redundancy mode—To activate this power mode, use the power redundancy-mode insrc_redundant command. The reserve power is the greater of power outputs for the two grids, and the available power becomes the lesser of power outputs for the two grids.
For example, suppose your system has the following setup:
Grids 1 and 2 each input 220 V to the power supply units.
Power supply units 1 and 2 each output 6 kW.
Current usage requirement is 8.784 kW.
The following three scenarios explain what happens for different numbers of power supply units that you install:
Scenario 1: If you do not add a power supply unit, the reserve power is 6 kW (3 kW for one power supply unit and 3 kW for the other power supply unit), and the available power is 6 kW (3 kW for one power supply unit plus 3 kW for the other power supply unit). The available power does not meet the switch usage requirement, so you cannot power the entire switch.
Scenario 2: If you add a power supply that outputs 3 kW, the reserve power is 9 kW (3 kW for three power supply units), and the available power is 6 kW (3 kW for each of two power supply units). The available power does not meet the system usage requirement, so you cannot power the entire switch.
Scenario 3: If you add a power supply unit that outputs 7.5 kW, the reserve power is 9.75 kW (3 kW for two power supply units and 3.75 kW for the new power supply unit), and the available power is 9.75 kW (3 kW for two power supply units and 3.75 kW for the new power supply unit). The available power exceeds the switch usage requirement, so you can power up all of the modules and fan trays in the switch.
Table 8-3 shows the results for each scenario.
Table 8-3 Input Source Redundancy Mode Scenarios
Scenario
|
Power Supply 1 (kW)
|
Power Supply 2 (kW)
|
Power Supply 3 (kW)
|
System Usage (kW)
|
Available Power (kW)
|
Reserve Power (kW)
|
Result
|
1
|
6.0
|
6.0
|
-
|
8.784
|
6.0
|
6.0
|
Available power (the power supply output for either grid) does not meet the system usage requirement.
|
2
|
6.0
|
6.0
|
3.0
|
8.784
|
9.0
|
6.0
|
The power supply output for one grid meets the system usage requirement, but the power supply output for the other grid does not meet the system usage requirement.
|
3
|
6.0
|
6.0
|
7.5
|
8.784
|
9.75
|
9.75
|
The power supply output for both grids meet the meet the system usage requirement.
|
–
Full redundancy mode—To activate this power mode, use the power redundancy-mode redundant command. The reserve power is the greater amount of reserve power for power supply redundancy and input source redundancy, and the available power is the lesser amount of available power for the same two redundancy modes.
For example, suppose your system has the following setup:
Grids A and B each provide 220 V.
Power supply units 1 and 2 each output 6.0 kW.
Switch usage requirement is 8.784 kW.
The following three scenarios explain what happens for different numbers of power supply units that you install:
Scenario 1: If you do not add a power supply unit, the reserve power is 6 kW and the available power is 6 kW. The available power does not meet the switch usage requirement, so you cannot power up the entire switch.
Scenario 2: If you add a 3-kW power supply unit, the reserve power is 9 kW (3 kW for three power supply units on one grid), and the available power is 6 kW (3 kW for two power supply units on a second grid). The available power does not meet the switch usage requirement, so you cannot power up the entire switch.
Scenario 3: If you add a 6-kW power supply unit, the reserve power is 9 kW (3 kW for three power supply units on the same grid), and the available power is 9 kW (3 kW for three power supply units on a second grid). The available power meets the switch usage requirements, so you can power up the entire switch.
Table 8-4 shows the results for each scenario.
Table 8-4 Full Redundancy Mode Scenarios
Scenario
|
Power Supply 1 (kW)
|
Power Supply 2 (kW)
|
Power Supply 3 (kW)
|
System Usage (kW)
|
Input Source Mode
|
Power Supply Mode
|
Result
|
Available Power (kW)
|
Reserve Power (kW)
|
Available Power (kW)
|
Reserve Power (kW)
|
1
|
6.0
|
6.0
|
—
|
8.784
|
6.0
|
6.0
|
6.0
|
6.0
|
Available power does not meet the switch usage requirement.
|
2
|
6.0
|
6.0
|
3.0
|
8.784
|
6.0
|
9.0
|
9.0
|
6.0
|
Available power for the power supply mode is sufficient but the available power for the input source mode is insufficient, so the available power does not meet the switch usage requirement.
|
3
|
6.0
|
6.0
|
6.0
|
8.784
|
9.0
|
9.0
|
12.0
|
6.0
|
Available power for both modes meets the switch usage requirement, so you can power up the entire switch.
|
Information About Modules
The following sections explain how you can manage operations for the switch modules:
•
Supervisor Modules
•
I/O Modules
•
Fabric Modules
Supervisor Modules
The Cisco Nexus 7000 Series switch has one or two supervisor modules. The switch can use the following supervisor module types:
•
Supervisor 1 (N7K-SUP1)
•
Supervisor 2 (N7K-SUP2)
•
Supervisor 2 Enhanced (N7K-SUP2E)
Note
Supervisor 1 modules are supported by the Cisco 7009, 7010, and 7018 switches, but it is not supported by the Cisco Nexus 7004 switch. Supervisor 2 and 2E modules are supported by all Cisco Nexus 7000 Series switches.
Note
If a switch has two supervisor modules, both must be the same type and have the same amount of memory in case the supervisor functions must switch over from one supervisor module to the other supervisor module.
When it has two supervisors, one supervisor is automatically active while the other is in standby mode. If the active supervisor goes down or is disconnected for replacement, the standby supervisor automatically becomes active. If you need to replace one of two installed supervisor modules with another module of the same type and amount of memory, you can do this without interrupting operations—the supervisor that you are not replacing becomes the active supervisor and retains the kickstart configuration while you replace the other supervisor. If you need to shutdown the switch to replace a supervisor module (for example, when there is only one supervisor installed in the switch or when the replacement supervisor is of another type or has a different amount of memory) you must follow the migration process explained in the "Replacing a Supervisor Module" section.
Supervisor modules are automatically powered up and started with the switch.
To understand the terms used for the supervisors, see Table 8-5.
Table 8-5 Supervisor Module Terms and Usage in Console Displays
Module Terms
|
Fixed or Relative
|
Usage
|
module-1 and module-2
|
Fixed usage
|
Cisco Nexus 7004 and 7009
• Module-1 refers to the supervisor module in slot 1.
• Module-2 refers to the supervisor module in slot 2.
|
module-5 and module-6
|
Cisco Nexus 7010
• Module-5 refers to the supervisor module in slot 5.
• Module-6 refers to the supervisor module in slot 6.
|
module-9 and module-10
|
Cisco Nexus 7018
• Module-9 refers to the supervisor module in slot 9.
• Module-10 refers to the supervisor module in slot 10.
|
sup-1 and sup-2
|
Fixed usage
|
Cisco Nexus 7004 and 7009
• sup-1 refers to the supervisor module in slot 1.
• sup-2 refers to the supervisor module in slot 2.
Cisco Nexus 7010
• sup-1 refers to the supervisor module in slot 5.
• sub-2 refers to the supervisor module in slot 6.
Cisco Nexus 7018
• sup-1 refers to the supervisor module in slot 9.
• sup-2 refers to the supervisor module in slot 10.
|
sup-active and sup-standby
|
Relative usage
|
Cisco Nexus 7004, 7009, 7010, and Cisco Nexus 7018
• sup-active refers to the active supervisor module—relative to the slot that contains the active supervisor module.
• sup-standby refers to the standby supervisor module—relative to the slot that contains the standby supervisor module.
|
sup-local and sup-remote
|
Relative usage
|
If you are logged into the active supervisor (in any Cisco Nexus 7000 Series chassis), the following applies:
• sup-local refers to the active supervisor module.
• sup-remote refers to the standby supervisor module.
If you are logged into the standby supervisor (in any Cisco Nexus 7000 Series chassis), the following applies:
• sup-local refers to the standby supervisor module (the one that you are logged into).
• There is no sup-remote available from the standby supervisor module (you cannot access a file system on the active supervisor).
|
I/O Modules
Cisco Nexus 7000 Series switches support the following I/O modules:
•
F1-Series 32-port 1- and 10-Gigabit Ethernet I/O modules (N7K-F132XP-15)1
•
F2-Series 48-port 1-/10-Gigabit Ethernet I/O modules with XL (N7K-F248XP-25)
•
F2-Series 48-port 1-/10-Gigabit Ethernet I/O modules with XL and enhancements (N7K-F248XP-25E)
•
M1-Series 48-port 10/100/1000 I/O modules (N7K-M148GT-11)1
•
M1-Series 48-port 10/100/1000 I/O modules with XL option (N7K-M148GT-11L)
•
M1-Series 48-port 1-Gigabit Ethernet I/O modules (N7K-M148GS-11)1
•
M1-Series 48-port 1-Gigabit Ethernet I/O modules with XL option (N7K-M148GS-11L)
•
M1-Series 32-port 10-Gigabit Ethernet I/O modules (N7K-M132XP-12)1
•
M1-Series 32-port 10-Gigabit Ethernet I/O modules with XL option (N7K-M132XP-12L)
•
M1-Series 8-port 10-Gigabit Ethernet I/O modules with XL option(N7K-M108X2-12L)
•
M2-Series 24-port 10-Gigabit Ethernet I/O modules with XL option (N7K-M224XP-23L)
•
M2-Series 6-port 40-Gigabit Ethernet I/O modules with XL option (N7K-M206XP-23L)
•
M2-Series 2-port 100-Gigabit Ethernet I/O modules with XL option (N7K-M202XP-23L)
Fabric Modules
Cisco Nexus 7000 Series switches support up to five fabric modules in the chassis. Each chassis has its own type of fabric module as follows:
•
Cisco Nexus 7009 chassis uses the Fabric 2 (N7K-C7009-FAB-2) modules.
•
Cisco Nexus 7010 chassis uses the Fabric 1 (N7K-C7010-FAB-1) or Fabric 2 (N7K-C7010-FAB-2) modules.
•
Cisco Nexus 7018 chassis uses the Fabric 1 (N7K-C7018-FAB-1) or Fabric 2 (N7K-C7018-FAB-2) modules.
Note
The Cisco Nexus 7004 switch does not include fabric modules.
Note
You can replace a Fabric 1 module with a Fabric 2 module in the Cisco Nexus 7010 and 7018 switches during operations, but while there is a mix of fabric module types, all of the fabric modules perform as Fabric 1 modules. If you power up a switch with two types of fabric modules installed, only the Fabric 1 modules will power up. To utilize the Fabric 2 module capabilities, all of the installed fabric modules must be Fabric 2 modules.
Verifying the Status of a Module
Before you begin configuring the switch, you need to ensure that the modules in the chassis are functioning as designed. To verify the status of all modules, enter the show module command. To verify the status of a supervisor or I/O module, enter the show module slot_number command. To verify the status of a fabric module, enter the show module xbar slot_number command. The interfaces in each module are ready to be configured when the ok status is displayed in the show module command output. See Example 8-5.
Example 8-5 Displaying Module Information
Mod Ports Module-Type Model Status
--- ----- -------------------------------- ------------------ ------------
2 48 10/100/1000 Mbps Ethernet Module N7K-M148GT-11 ok
3 48 10/100/1000 Mbps Ethernet Module N7K-M148GT-11 ok
4 48 10/100/1000 Mbps Ethernet Module N7K-M148GT-11 ok
5 0 Supervisor module-1X N7K-SUP1 active *
6 0 Supervisor module-1X N7K-SUP1 ha-standby
7 32 10 Gbps Ethernet Module N7K-M132XP-12 ok
9 48 1000 Mbps Optical Ethernet Modul N7K-M148GS-11 ok
--- -------------- ------
Mod MAC-Address(es) Serial-Num
--- -------------------------------------- ----------
2 00-24-98-e9-14-58 to 00-24-98-e9-14-8c JAF1306AAFP
3 00-24-98-e8-28-84 to 00-24-98-e8-28-b8 JAF1303ACPB
4 00-24-f7-1c-85-b0 to 00-24-f7-1c-85-e4 JAF1309ABLE
5 00-24-98-6f-95-00 to 00-24-98-6f-95-08 JAF1309AECN
6 00-24-f7-18-92-88 to 00-24-f7-18-92-90 JAF1309AEFE
7 00-24-98-e9-29-60 to 00-24-98-e9-29-84 JAF1307ALCB
9 00-24-f7-1c-d5-50 to 00-24-f7-1c-d5-84 JAF1311AEMM
The Status column in the output should display an ok status for switching modules and an active or standby (or HA-standby) status for supervisor modules. If the status is either ok or active, you can continue with your configuration.
Note
A standby supervisor module reflects the HA-standby status if the HA switchover mechanism is enabled. If the warm switchover mechanism is enabled, the standby supervisor module reflects the standby status.
For information about the states through which a switching module progresses, see the "Checking the State of a Module" section.
Checking the State of a Module
If your chassis has more than one I/O module, you can check the progress by repeatedly using the show module command and viewing the Status column each time.
The I/O module goes through a testing and an initializing stage before displaying an ok status. Table 8-6 describes the possible states in which a module can exist.
Table 8-6 Module States
show module Command Status Output
|
Description
|
powered up
|
The hardware has electrical power. When the hardware is powered up, the software begins booting.
|
testing
|
The switching module has established connection with the supervisor and the switching module is performing bootup diagnostics.
|
initializing
|
The diagnostics have completed successfully and the configuration is being downloaded.
|
failure
|
The switch detects a switching module failure upon initialization and automatically attempts to power-cycle the module three times. After the third attempt, the module powers down.
|
ok
|
The switch is ready to be configured.
|
power-denied
|
The switch detects insufficient power for a switching module to power up.
|
active
|
This module is the active supervisor module and the switch is ready to be configured.
|
HA-standby
|
The HA switchover mechanism is enabled on the standby supervisor module.
|
Connecting to a Module
At any time, you can connect to any module by using the attach module command. Once you are at the module prompt, you can obtain further details about the module by using module-specific commands in EXEC mode.
SUMMARY STEPS
1.
attach module slot_number
2.
dir bootflash
DETAILED STEPS
| |
Command
|
Purpose
|
Step 1
|
attach module slot_number
Example:
switch# attach module 6
switch(standby)#
|
Provides direct access to the specified module (in this example, the standby supervisor module is in slot 6).
|
Step 2
|
dir bootflash
80667580 Feb 21 22:04:59 2008 is855.S7
22168064 Feb 21 22:04:19 2008 ks855.S7
16384 Jan 03 19:56:00 2005 lost+found/
Usage for bootflash://sup-local
|
Provides the available space information for the standby supervisor module.
Note Use the exit command to exit the module-specific prompt.
Tip  If you are not accessing the switch from a console terminal, this step is the only way to access the standby supervisor module.
|
You can also use the attach module command to display the standby supervisor module information, although you cannot configure the standby supervisor module using this command.
Accessing an I/O Module Through the Console
You can troubleshoot bootup problems for an I/O module by accessing the module through its console port. This action establishes a console mode that you must exit in order to use other Cisco NX-OS commands.
To attach to the console port for an I/O module, use the attach console module command to specify the module you need to work with. You can specify a slot number of 1 to 8 or 11 to 18.
SUMMARY STEPS
1.
attach console module slot_number
DETAILED STEPS
| |
Command
|
Purpose
|
Step 1
|
attach console module slot_number
Example:
switch# attach console module 9
Connected
Escape character is `~,' (tilde
comma]
|
Attaches the console port for the I/O module slot number specified.
|
Note
To exit the console mode, enter the ~, command.
Shutting Down Modules
This section includes the following topics:
•
Shutting Down a Supervisor
•
Shutting Down a Fabric Module
•
Shutting Down an I/O Module
Shutting Down a Supervisor
To shut down a supervisor module, use the out-of-service module command to specify the slot with that module as follows:
switch# out-of-service module slot
Shutting Down a Fabric Module
To shut down a fabric module, use either the out-of-service xbar command or the poweroff xbar command. If you use the poweroff command, the slot remains in that state until you use the no poweroff command. If you use the out-of-service command, the out-of-service state remains in effect until you do something like remove the module and replace it with another module.
Note
If you are going to limit the maximum number of fabric modules (see the "Changing the Amount of Power Reserved for Fabric Modules" section), make sure that powered-on fabric modules are in the first n fabric module slots, where n is the new maximum number of fabric modules. For example, if you are limiting the maximum number of fabric modules to 4, you must make sure that the four powered-on fabric modules are in fabric slots 1 through 4.
Note
If you are powering on more fabric modules than allowed by the current maximum number of fabric modules, then make sure that the fabric modules that you are powering on are installed in the first n fabric slots (slots 1 through n), power-on those modules with the no poweroff xbar command, and change the maximum number of fabric modules to n (see the "Changing the Amount of Power Reserved for Fabric Modules" section).
SUMMARY STEPS
1.
config t
2.
[no] poweroff xbar slot_number
Note
Alternatively, you can use the out-of-service xbar slot_number command.
DETAILED STEPS
| |
Command
|
Purpose
|
Step 1
|
config t
Example:
switch# config t
switch(config)#
|
Enters configuration mode.
|
Step 2
|
poweroff xbar slot_number
Example:
switch(config)# poweroff xbar 1
switch(config)#
|
Powers off the specified fabric module in the switch.
|
no poweroff xbar slot_number
Example:
switch(config)# no poweroff xbar 1
switch(config)#
|
Powers on the specified fabric module in the switch.
|
Shutting Down an I/O Module
To shut down an I/O module, use the poweroff module command to specify the slot with that module as follows:
switch# poweroff module slot
When you are ready to power up the module, use the no poweroff module command.
SUMMARY STEPS
1.
config t
2.
[no] poweroff module slot_number
DETAILED STEPS
| |
Command
|
Purpose
|
Step 1
|
config t
Example:
switch# config t
switch(config)#
|
Enters configuration mode.
|
Step 2
|
poweroff module slot_number
Example:
switch(config)# poweroff module 1
switch(config)#
|
Powers off the specified I/O module in the switch.
|
no poweroff module slot_number
Example:
switch(config)# no poweroff module 1
switch(config)#
|
Powers up the specified I/O module in the switch.
|
Information About Module Temperature
This section includes the following topics:
•
Overview of Module Temperatures
•
Displaying the Module Temperature
Overview of Module Temperatures
Built-in, automatic sensors are provided in all switches in the Cisco Nexus 7000 Series to monitor your switch at all times.
Each module (supervisor, I/O, and fabric) has temperature sensors with two thresholds:
•
Minor temperature threshold—When a minor threshold is exceeded, a minor alarm occurs and the following actions occur for all four sensors:
–
System messages are displayed.
–
Call Home alerts are sent (if configured).
–
SNMP notifications are sent (if configured).
•
Major temperature threshold—When a major threshold is exceeded, a major alarm occurs and the following actions occur:
–
For sensors 1, 3, and 4 (outlet and onboard sensors), the following actions occur:
System messages are displayed.
Call Home alerts are sent (if configured).
SNMP notifications are sent (if configured).
–
For sensor 2 (intake sensor), the following actions occur:
If the threshold is exceeded in a switching module, only that module is shut down.
If the threshold is exceeded in an active supervisor module with HA-standby or standby present, only that supervisor module is shut down and the standby supervisor module takes over.
If you do not have a standby supervisor module in your switch, you have 2 minutes to decrease the temperature. During this interval, the software monitors the temperature every 5 seconds and continuously sends system messages as configured.
Tip
We recommend that you install dual supervisor modules. If you are using a Cisco Nexus 7000 Series switch without dual supervisor modules, we recommend that you immediately replace the fan module if just one fan is not working.
Note
A threshold value of -127 indicates that no thresholds are configured or applicable.
Displaying the Module Temperature
You can display temperature readings for module temperature sensors by using the show environment temperature command. See Example 8-6.
Example 8-6 Displaying Temperature Information for Hardware
switch# show environment temperature
--------------------------------------------------------------------
Module Sensor MajorThresh MinorThres CurTemp Status
(Celsius) (Celsius) (Celsius)
--------------------------------------------------------------------
1 Crossbar(s5) 105 95 60 Ok
1 QEng1Sn1(s12) 115 110 70 Ok
1 QEng1Sn2(s13) 115 110 68 Ok
1 QEng1Sn3(s14) 115 110 67 Ok
1 QEng1Sn4(s15) 115 110 68 Ok
1 QEng2Sn1(s16) 115 110 70 Ok
1 QEng2Sn2(s17) 115 110 68 Ok
1 QEng2Sn3(s18) 115 110 68 Ok
1 QEng2Sn4(s19) 115 110 68 Ok
1 L2Lookup(s27) 115 105 57 Ok
1 L3Lookup(s28) 120 110 62 Ok
2 Crossbar(s5) 105 95 65 Ok
2 QEng1Sn1(s12) 115 110 70 Ok
2 QEng1Sn2(s13) 115 110 68 Ok
2 QEng1Sn3(s14) 115 110 67 Ok
2 QEng1Sn4(s15) 115 110 68 Ok
2 QEng2Sn1(s16) 115 110 69 Ok
2 QEng2Sn2(s17) 115 110 68 Ok
2 QEng2Sn3(s18) 115 110 67 Ok
2 QEng2Sn4(s19) 115 110 68 Ok
2 L2Lookup(s27) 115 105 56 Ok
2 L3Lookup(s28) 120 110 63 Ok
5 Outlet1 (s1) 125 125 49 Ok
5 Outlet2 (s2) 125 125 37 Ok
5 Intake (s3) 60 42 32 Ok
5 EOBC_MAC(s4) 105 95 43 Ok
5 Crossbar(s6) 105 95 61 Ok
5 Arbiter (s7) 110 100 67 Ok
5 CTSdev1 (s8) 115 105 43 Ok
5 InbFPGA (s9) 105 95 44 Ok
5 QEng1Sn1(s10) 115 105 60 Ok
5 QEng1Sn2(s11) 115 105 59 Ok
5 QEng1Sn3(s12) 115 105 56 Ok
5 QEng1Sn4(s13) 115 105 57 Ok
xbar-1 Outlet (s1) 125 125 38 Ok
xbar-1 Intake (s2) 60 42 32 Ok
xbar-1 Crossbar(s3) 105 95 56 Ok
xbar-2 Outlet (s1) 125 125 39 Ok
xbar-2 Intake (s2) 62 42 31 Ok
xbar-2 Crossbar(s3) 105 95 56 Ok
Displaying Environment Information
You can display all of the environment-related switch information by using the show environment command. See Example 8-7.
Example 8-7 Displaying All Environmental Information
----------------------------------------------------------
----------------------------------------------------------
A Clock Module -- NotSupported/None
B Clock Module -- NotSupported/None
------------------------------------------------------
------------------------------------------------------
Fan1(sys_fan1) N7K-C7010-FAN-S 1.1 Ok
Fan2(sys_fan2) N7K-C7010-FAN-S 1.1 Ok
Fan3(fab_fan1) N7K-C7010-FAN-F 1.1 Ok
Fan4(fab_fan2) N7K-C7010-FAN-F 1.1 Ok
--------------------------------------------------------------------
Module Sensor MajorThresh MinorThres CurTemp Status
(Celsius) (Celsius) (Celsius)
--------------------------------------------------------------------
2 Crossbar(s5) 105 95 43 Ok
2 CTSdev4 (s9) 115 105 58 Ok
2 CTSdev5 (s10) 115 105 56 Ok
2 CTSdev7 (s12) 115 105 53 Ok
2 CTSdev9 (s14) 115 105 51 Ok
2 CTSdev10(s15) 115 105 50 Ok
2 CTSdev11(s16) 115 105 48 Ok
2 CTSdev12(s17) 115 105 47 Ok
2 QEng1Sn1(s18) 115 105 49 Ok
2 QEng1Sn2(s19) 115 105 46 Ok
2 QEng1Sn3(s20) 115 105 44 Ok
2 QEng1Sn4(s21) 115 105 45 Ok
2 L2Lookup(s22) 120 110 44 Ok
2 L3Lookup(s23) 120 110 52 Ok
3 Crossbar(s5) 105 95 43 Ok
3 CTSdev4 (s9) 115 105 56 Ok
3 CTSdev5 (s10) 115 105 54 Ok
3 CTSdev7 (s12) 115 105 53 Ok
3 CTSdev9 (s14) 115 105 50 Ok
3 CTSdev10(s15) 115 105 49 Ok
3 CTSdev11(s16) 115 105 47 Ok
3 CTSdev12(s17) 115 105 46 Ok
3 QEng1Sn1(s18) 115 105 47 Ok
3 QEng1Sn2(s19) 115 105 45 Ok
3 QEng1Sn3(s20) 115 105 44 Ok
3 QEng1Sn4(s21) 115 105 43 Ok
3 L2Lookup(s22) 120 110 44 Ok
3 L3Lookup(s23) 120 110 50 Ok
4 Crossbar(s5) 105 95 44 Ok
4 CTSdev4 (s9) 115 105 56 Ok
4 CTSdev5 (s10) 115 105 54 Ok
4 CTSdev7 (s12) 115 105 54 Ok
4 CTSdev9 (s14) 115 105 51 Ok
4 CTSdev10(s15) 115 105 51 Ok
4 CTSdev11(s16) 115 105 48 Ok
4 CTSdev12(s17) 115 105 47 Ok
4 QEng1Sn1(s18) 115 105 49 Ok
4 QEng1Sn2(s19) 115 105 48 Ok
4 QEng1Sn3(s20) 115 105 47 Ok
4 QEng1Sn4(s21) 115 105 46 Ok
4 L2Lookup(s22) 120 110 45 Ok
4 L3Lookup(s23) 120 110 52 Ok
5 Intake (s3) 60 42 23 Ok
5 EOBC_MAC(s4) 105 95 44 Ok
5 Crossbar(s6) 105 95 47 Ok
5 Arbiter (s7) 110 100 54 Ok
5 CTSdev1 (s8) 115 105 46 Ok
5 InbFPGA (s9) 105 95 41 Ok
5 QEng1Sn1(s10) 115 105 48 Ok
5 QEng1Sn2(s11) 115 105 47 Ok
5 QEng1Sn3(s12) 115 105 44 Ok
5 QEng1Sn4(s13) 115 105 45 Ok
6 Intake (s3) 60 42 24 Ok
6 EOBC_MAC(s4) 105 95 47 Ok
6 Crossbar(s6) 105 95 48 Ok
6 Arbiter (s7) 110 100 54 Ok
6 CTSdev1 (s8) 115 105 47 Ok
6 InbFPGA (s9) 105 95 44 Ok
6 QEng1Sn1(s10) 115 105 50 Ok
6 QEng1Sn2(s11) 115 105 48 Ok
6 QEng1Sn3(s12) 115 105 46 Ok
6 QEng1Sn4(s13) 115 105 49 Ok
7 Crossbar(s5) 105 95 58 Ok
7 QEng1Sn1(s12) 115 110 66 Ok
7 QEng1Sn2(s13) 115 110 63 Ok
7 QEng1Sn3(s14) 115 110 62 Ok
7 QEng1Sn4(s15) 115 110 62 Ok
7 QEng2Sn1(s16) 115 110 66 Ok
7 QEng2Sn2(s17) 115 110 63 Ok
7 QEng2Sn3(s18) 115 110 63 Ok
7 QEng2Sn4(s19) 115 110 63 Ok
7 L2Lookup(s27) 115 105 51 Ok
7 L3Lookup(s28) 120 110 61 Ok
9 Crossbar(s5) 105 95 43 Ok
9 CTSdev1 (s6) 115 105 53 Ok
9 CTSdev3 (s8) 115 105 53 Ok
9 CTSdev4 (s9) 115 105 56 Ok
9 CTSdev5 (s10) 115 105 53 Ok
9 CTSdev6 (s11) 115 105 57 Ok
9 CTSdev7 (s12) 115 105 52 Ok
9 CTSdev9 (s14) 115 105 50 Ok
9 CTSdev10(s15) 115 105 53 Ok
9 CTSdev11(s16) 115 105 50 Ok
9 CTSdev12(s17) 115 105 53 Ok
9 QEng1Sn1(s18) 115 105 55 Ok
9 QEng1Sn2(s19) 115 105 54 Ok
9 QEng1Sn3(s20) 115 105 52 Ok
9 QEng1Sn4(s21) 115 105 51 Ok
9 L2Lookup(s22) 120 110 52 Ok
9 L3Lookup(s23) 120 110 60 Ok
xbar-1 Intake (s2) 60 42 27 Ok
xbar-1 Crossbar(s3) 105 95 59 Ok
xbar-2 Intake (s2) 60 42 26 Ok
xbar-2 Crossbar(s3) 105 95 50 Ok
xbar-3 Intake (s2) 60 42 26 Ok
xbar-3 Crossbar(s3) 105 95 54 Ok
xbar-4 Intake (s2) 60 42 26 Ok
xbar-4 Crossbar(s3) 105 95 53 Ok
xbar-5 Intake (s2) 60 42 26 Ok
xbar-5 Crossbar(s3) 105 95 55 Ok
Supply Model Output Capacity Status
------- ------------------- ----------- ----------- --------------
1 N7K-AC-6.0KW 816 W 6000 W Ok
2 N7K-AC-6.0KW 713 W 6000 W Ok
3 N7K-AC-6.0KW 730 W 6000 W Ok
Module Model Draw Allocated Status
------- ------------------- ----------- ----------- --------------
2 N7K-M148GT-11 N/A 400 W Powered-Up
3 N7K-M148GT-11 N/A 400 W Powered-Up
4 N7K-M148GT-11 N/A 400 W Powered-Up
5 N7K-SUP1 N/A 210 W Powered-Up
6 N7K-SUP1 N/A 210 W Powered-Up
7 N7K-M132XP-12 N/A 750 W Powered-Up
9 N7K-M148GS-11 283 W 400 W Powered-Up
Xb1 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb2 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb3 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb4 N7K-C7010-FAB-1 N/A 60 W Powered-Up
Xb5 N7K-C7010-FAB-1 N/A 60 W Powered-Up
fan1 N7K-C7010-FAN-S 88 W 720 W Powered-Up
fan2 N7K-C7010-FAN-S 88 W 720 W Powered-Up
fan3 N7K-C7010-FAN-F 9 W 120 W Powered-Up
fan4 N7K-C7010-FAN-F 9 W 120 W Powered-Up
N/A - Per module power not available
Power Supply redundancy mode (configured) Redundant
Power Supply redundancy mode (operational) Redundant
Total Power Capacity (based on configured mode) 9000 W
Total Power of all Inputs (cumulative) 18000 W
Total Power Output (actual draw) 2259 W
Total Power Allocated (budget) 4750 W
Total Power Available for additional modules 4250 W
Reloading Modules
You can reload the entire switch, reset specific modules in the switch, or reload the image on specific modules in the switch.
This section includes the following topics:
•
Reloading the Switch
•
Power Cycling Modules
Reloading the Switch
To reload the switch, use the reload command without any options. When you use this command, you reboot the switch.
Note
If you need to use the reload command, be sure to save the running configuration by using the copy running-config startup-config command beforehand.
Power Cycling Modules
To power cycle any module, follow these steps:
Step 1
Identify the module that needs to be reset.
Step 2
Reset the identified module by entering the reload module command. This command power cycles the selected module.
switch# reload module number
The number indicates the slot in which the identified module resides.
Caution 
Reloading a module disrupts traffic through the module.
Saving the Module Configuration
To save the new configuration to nonvolatile storage, use the copy running-config startup-config command from EXEC mode. Once you enter this command, the running and the startup copies of the configuration are identical.
Table 8-7 displays various scenarios when module configurations are preserved or lost.
.
Table 8-7 Switching Module Configuration Status
Scenario
|
Consequence
|
A particular switching module is removed and you used the copy running-config startup-config command again.
|
The configured module information is lost.
|
A particular switching module is removed and the same switching module is replaced before you enter the copy running-config startup-config command again.
|
The configured module information is preserved.
|
A particular switching module is removed and replaced with the same type switching module, and you entered the reload module number command.
|
The configured module information is preserved.
|
A particular switching module is reloaded when you enter the reload module number command.
|
The configured module information is preserved.
|
Purging the Module Configuration
To delete the configuration in an empty slot or in a slot with a powered-down I/O module, use the purge module slot running-config command from EXEC mode. This command clears the running configuration for the specified slot. This command does not work on supervisor modules or on any slot that currently has a powered-up module. This command only works on an empty slot (where the specified module once resided) or on a slot with a powered-down I/O module.
The purge module command clears the configuration for any module that previously existed in a slot and has since been removed or powered down. While the module was in that slot, some parts of the configuration may have been stored in the running configuration and cannot be reused (for example, IP addresses), unless you clear that from the running configuration.
For example, suppose you create an IP storage configuration with a 48-port 10/100/1000 Ethernet I/O module in slot 3 in Switch A. This module uses an IP address. You decide to remove this I/O module and move it to Switch B, and you no longer need the IP address. If you try to configure this unused IP address, you will receive an error message that prevents you from proceeding with the configuration. In this case, you need to enter the purge module 3 running-config command to clear the old configuration in Switch A before using the IP address.
Changing the Amount of Power Reserved for Fabric Modules
By default, each Cisco Nexus 7000 Series system reserves enough power for the maximum quantity (five) of fabric modules that can be installed in its chassis. If you have installed fewer than five fabric modules and need to free up unused reserve power for I/O modules, you can power down the unused slots and specify a smaller maximum number of fabric modules.
Before you can change the maximum number of fabric modules, you must do all of the following:
•
Make sure that the fabric modules that you are using are installed in slots 1 through x where x is the new maximum number of fabric modules.
You do not have to fill all of those slots with fabric modules, but the fabric modules that you will be using must be in those slots. For example, if you specify 4 as the new maximum number of fabric modules, you must make sure that the fabric modules that you are using are in slots 1 through 4. Also make sure that any empty fabric module slots have blank modules installed in them.
•
Make sure that each of the installed fabric modules is powered up by using the no poweroff xbar slot_number command (see the "Shutting Down a Fabric Module" section).
•
Power down the unused slots by using the poweroff xbar slot_number command (see the "Shutting Down a Fabric Module" section).
To specify a different maximum number of fabric modules for your system, use the hardware fabrics max number command. To verify the status of the installed fabric modules, use the show module xbar command (see the "Verifying the Status of a Module" section). To verify the amount of reserved power, use the show environment power command (see the "Displaying Power Usage Information" section).
SUMMARY STEPS
1.
config t
2.
hardware fabrics max number
DETAILED STEPS
| |
Command
|
Purpose
|
Step 1
|
config t
Example:
switch# config t
switch(config)#
|
Enters configuration mode.
|
Step 2
|
hardware fabrics max number
Example:
switch(config)# hardware fabrics max 4
switch(config)#
|
Powers off the specified fabric module in the switch. For the number, use a digit between 1 and 5, inclusive.
|
Information About Fan Trays
Hot-swappable fan trays are provided in all switches in the Cisco Nexus 7000 Series to manage airflow and cooling for the entire switch. Each fan tray contains multiple fans to provide redundancy. The switch can continue functioning in the following situations:
•
One or more fans fail within a fan tray—Even with multiple fan failures, the Cisco Nexus 7000 Series switch can continue functioning. When a fan fails within a tray, the functioning fans in the module increase their speed to compensate for the failed fans.
•
The fan tray is removed for replacement—The fan tray is designed to be removed and replaced while the system is operating without presenting an electrical hazard or damage to the system. Depending on the type of fan tray that you remove, one of the following will occur:
–
Cisco Nexus 7004 or 7009 Series fan tray—The switch can function without a fan tray for up to two minutes by which time you must replace the missing fan tray.
–
Cisco Nexus 7010 Series system fan tray—The fans in the remaining system fan tray increase their speeds as needed for the current temperature until you replace the missing fan tray.
–
Cisco Nexus 7010 Series fabric fan tray—The fan in the remaining fabric fan tray increases its speed to the maximum speed until you replace the missing fabric fan tray.
–
Cisco Nexus 7018 Series fan tray—If you do not replace the fan tray within three minutes, the system shuts down the modules cooled by the removed fan tray. For the top fan tray, that means that the system would shut down the supervisor in slot 9, the I/O modules in slots 1 through 8, and the fabric modules. For the bottom fan tray, that means that the system would shut down the supervisor in slot 10 and the I/O modules in slots 11 through 18.
Note
When replacing a failed fan tray in a running system, be sure to promptly replace the fan tray.
Tip
If one or more fans fail within a fan tray, the Fan Status LED turns red. A fan failure could lead to temperature alarms if not corrected immediately.
The fan status is continuously monitored by the software. In case of a fan failure, the following actions occur:
•
System messages are displayed.
•
Call Home alerts are sent (if configured).
•
SNMP notifications are sent (if configured).
To display the fan module statuses, use the show environment fan command as shown inExample 8-8 (Cisco Nexus 7004 switch), Example 8-9 (Cisco Nexus 7009 switch), Example 8-10 (Cisco Nexus 7010 switch), or Example 8-11 (Cisco Nexus 7018 switch).
Example 8-8 Displaying Fan Information for a Cisco Nexus 7004 Series Chassis
switch# show environment fan
-------------------------------------------------------
-------------------------------------------------------
Fan1(sys_fan1) N7K-C7004-FAN 0.110 Ok
Fan Zone Speed: Zone 1: 0x7f
Example 8-9 Displaying Fan Information for a Cisco Nexus 7009 Series Chassis
switch# show environment fan
----------------------------------------------
----------------------------------------------
Fan1(sys_fan1) N7K-C700-FAN 0.31 Ok
Example 8-10 Displaying Fan Information for a Cisco Nexus 7010 Series Chassis
switch# show environment fan
------------------------------------------------------
------------------------------------------------------
ChassisFan1 N7K-C7010-FAN-S 0.410 Ok
ChassisFan2 N7K-C7010-FAN-S 0.410 Ok
ChassisFan3 N7K-C7010-FAN-F 0.209 Ok
ChassisFan4 N7K-C7010-FAN-F 0.209 Ok
Example 8-11 Displaying Fan Information for a Cisco Nexus 7018 Series Chassis
switch# show environment fan
------------------------------------------------------
------------------------------------------------------
Fan1(sys_fan1) N7K-C7018-FAN 0.204 Ok
Fan2(sys_fan2) N7K-C7018-FAN 0.204 Ok
The possible Status field values are as follows:
•
If the fan module is operating properly, the status is Ok.
•
If the fan is physically absent, the status is Absent.
•
If the fan is physically present but not working properly, the status is Failure.
If the status for one of the fan trays is "Failure," the status field also displays the numbers of the failing fans. For the Cisco Nexus 7010 system, each system fan tray has six fans to cool the supervisor and I/O modules and each fabric fan tray has one fan to cool the fabric modules. For the Cisco Nexus 7018 system, each fan tray has 14 fans to cool the supervisor, I/O modules, and fabric modules as follows:
•
Top fan tray
–
Fans 1 through 12 cool the I/O modules in slots 1 through 8 and the supervisor module in slot 9.
–
Fans 13 and 14 cool the fabric modules
•
Bottom fan tray
–
Fans 1 through 12 cool the I/O modules in slots 11 through 18 and the supervisor module in slot 10
–
Fans 13 and 14 are not used
Configuring EPLDs
The Cisco Nexus 7000 Series switches contain several programmable logical devices (PLDs) that provide hardware functionalities in all modules. Cisco provides electronic programmable logical device (EPLD) image upgrades to enhance hardware functionality or to resolve known issues. PLDs include electronic programmable logical devices (EPLDs), field programmable gate arrays (FPGAs), and complex programmable logic devices (CPLDs), but they do not include ASICs. In this document, the term EPLD is used for FPGA and CPLDs.
The advantage of having EPLDs for some module functions is that when you need to upgrade those functions, you just upgrade their software images instead of replacing their hardware.
Note
EPLD image upgrades for an I/O module disrupt the traffic going through the module because the module must power down briefly during the upgrade. The system performs EPLD upgrades on one module at a time, so at any one time the upgrade disrupts only the traffic going through one module.
Although Cisco provides EPLD images with each release, it is rare that these images are updates to the images included with past releases. To determine whether the images used for your hardware components have been updated for the current or past releases, see Table 8-9. You do not have to upgrade your EPLD images unless they fix the functions for the hardware that you are using in your Cisco Nexus 7000 Series switch. The EPLD image upgrades are independent from the Cisco NX-OS In Service Software Upgrade (ISSU) process, which upgrades the system and kickstart images with no impact on the network environment.
When Cisco makes an EPLD image upgrade available, the Cisco Nexus 7000 Series FPGA/EPLD Upgrade Release Notes announce its availability, and you can download it from http://www.cisco.com.
This section includes the following topics:
•
Deciding When to Upgrade EPLDs
•
Switch Requirements
•
EPLDs Available with Releases 5.0(2) through 6.1(3)
•
Determining Whether to Upgrade EPLDs
•
Downloading the EPLD Images
•
EPLD Images Needed for vPCs
•
EPLD Images Needed for LISP
•
Installation Guidelines
•
Preparing the EPLD Images for Installation
•
Upgrading the EPLD Images
•
Verifying the EPLD Upgrades
•
Displaying the Available EPLD Versions
•
Displaying the Status of EPLD Upgrades
Deciding When to Upgrade EPLDs
You do not always need to upgrade EPLD images but the following circumstances do require that you upgrade these images:
•
If you are upgrading Supervisor 1 modules with Supervisor 2 or Supervisor 2E modules and the switch has Fabric 2 modules (you must upgrade at least the Fabric 2 EPLDs)
•
If you are enabling software features (LIST, VPCs, and so on) that require EPLDs
•
If you are using M2 Series 100-Gbps Ethernet I/O modules that remain powered down after booting up the switch
When new EPLD images are available, the upgrades are always recommended if your network environment allows for a maintenance period in which some level of traffic disruption is acceptable. If such a disruption is not acceptable at this time, you might consider postponing the upgrade until a better time.
Note
The EPLD upgrade operation is a disruptive operation. You should execute this operation only at a programmed maintenance time. The system/kickstart ISSU upgrade is a nondisruptive upgrade.
Note
Do not perform an EPLD upgrade during an ISSU system/kickstart upgrade.
Table 8-8 provides high-level guidelines to help network administrators determine whether an EPLD upgrade is necessary when upgrading Cisco NX-OS Release 5.0(1) or a later release. If you are upgrading an earlier release, see one of the following earlier versions of the release notes:
•
Cisco Nexus 7000 Series FPGA/EPLD Upgrade Release Notes, Release 4.0
•
Cisco Nexus 7000 Series FPGA/EPLD Upgrade Release Notes, Release 4.1
Table 8-8 Conditions For Upgrading EPLD Images
Condition
|
Modules Targeted for Upgrades 1
|
M2 Series I/O modules remain powered down after booting up the switch for Cisco NX-OS Release 6.1(1) or 6.1(2).
|
Download one of the following EPLD images and use the no poweroff module command for each powered down M2 Series I/O module:
• For Release 6.1(1) and supervisor 1 modules download n7000-s1-epld.6.1.1a.img.
• For Release 6.1(1) and supervisor 2 modules download n7000-s2-epld.6.1.1a.img.
• For Release 6.1(2) and supervisor 1 modules download n7000-s1-epld.6.1.2a.img.
• For Release 6.1(2) and supervisor 2 modules download n7000-s2-epld.6.1.2a.img.
|
Upgrading the Cisco NX-OS operating system from Release 4.x to Release 5.0 or later releases.
|
Update all supervisor, I/O, and fabric modules with the latest EPLD images.
|
Moving 32-port 10-Gigabit Ethernet I/O modules from a Cisco Nexus 7010 switch to a Cisco Nexus 7018 switch
|
32-port 10-Gigabit Ethernet I/O modules (N7K-M132XP-12)
|
Moving 48-port 10/100/1000 Ethernet I/O modules from a Cisco Nexus 7010 switch to a Cisco Nexus 7018 switch
|
48-port 10/100/1000 Ethernet I/O modules (N7K-M148GT-11)
|
Moving the supervisor (N7K-SUP1) modules from a Cisco Nexus 7010 switch to a Cisco Nexus 7018 switch
|
Supervisor (N7K-SUP1) modules
|
Switch Requirements
The Cisco Nexus 7000 Series switch must be running the Cisco NX-OS operating system and include the following hardware:
•
One or two supervisor modules, each with at least 120 MB of available bootflash or slot0 memory
•
One or more I/O modules
•
One or more fabric modules
•
One fan tray module (Cisco Nexus 7009)
•
Two fabric fan tray modules (Cisco Nexus 7010)
•
Two system fan tray modules (Cisco Nexus 7010)
•
Two fan tray modules (Cisco Nexus 7018)
You must be able to access the system through a console, SSH, or Telnet.
You must have administrator privileges to work with the Cisco Nexus 7000 Series switches.
EPLDs Available with Releases 5.0(2) through 6.1(3)
Each EPLD image that you can download from http://www.cisco.com is a bundle of EPLD upgrades. To see the updated EPLD versions for each release, see Table 8-9.
Note
Table 8-9 shows EPLD image numbers in x.00y format but the show commands might display these numbers in x.y format (without leading zeros) for earlier EPLD images.
Table 8-9 EPLD Upgrades for Cisco NX-OS Releases
Module Type
|
Mudule
|
|
|
Release
|
|
|
|
|
|
|
| |
EPLD Device
|
Version
|
5.0(2)
|
5.0(3)
|
5.1(1)
|
5.1(2)
|
5.2(1)
|
6.0(1)
|
6.1(1)
|
6.1(2)
|
6.1(3)
|
Supervisor 1 module (N7K-SUP1)
|
|
|
|
|
|
|
|
|
|
|
| |
Power Manager IO INBAND Local Bus and CPLD CMP CPLD
|
All All All All All
|
3.009 3.028 1.008 3.000 6.000
|
— — — — —
|
— — — — —
|
— — — — —
|
— — — — —
|
— — — — —
|
— 3.029 — — —
|
— — — — —
|
— — — — —
|
Supervisor 2 and 2E modules (N7K-SUP2 and N7K-SUP2E)
|
|
|
|
|
|
|
|
|
|
|
| |
Power Manager IO
|
All All
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
34.000 1.012
|
— 1.013
|
— —
|
F1 Series 32-port, 1- and 10-Gigabit Ethernet I/O module (N7K-F132XP-15)
|
|
|
| |
Power Manager IO
|
All All
|
N/A1 N/A1
|
N/A1 N/A1
|
1.000 0.045
|
— —
|
1.001 —
|
— —
|
— —
|
— —
|
— —
|
F2 Series 48-port, 1- and 10-Gigabit Ethernet I/O modules (N7K-F248XP-25)
|
|
|
|
|
| |
Power Manager IO
|
All All
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
1.006 0.006
|
— —
|
— —
|
— —
|
F2 Series 48-port, 1- and 10-Gigabit Ethernet I/O modules (enhanced) (N7K-F248XP-25E)
|
|
| |
Power Manager IO
|
All All
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
1.006 0.001
|
— —
|
F2 Series 48-port, 1- and 10-GBASE-T Ethernet I/O modules (enhanced) (N7K-F248XT-25E)
|
|
| |
Power Manager IO
|
All All
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
N/A1 N/A1
|
1.009 0.016
|
— —
|
M1 Series 48-port, 1-Gigabit Ethernet I/O module (N7K-M148GS-11)
|
|
| |
Power Manager IO SFP Forwarding Engine
|
All All All All
|
4.008 1.005 1.004 1.006
|
— — — —
|
— 1.006 — —
|
— — — —
|
— — — —
|
— — — —
|
— — — —
|
— — — —
|
— — — —
|
M1 Series 48-port, 1-Gigabit Ethernet I/O module with XL (N7K-M148GS-11L)
|
|
| |
Power Manager IO SFP Forwarding Engine
|
All All All V01-V04 V05+
|
4.008 1.005 1.004 1.006 N/A2
|
— — — — N/A2
|
— 1.006 — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — 2.005
|
M1 Series 48-port, 10/100/1000 Ethernet I/O module (N7K-M148GT-11)
|
|
| |
Power Manager IO Forwarding Engine
|
All All All
|
5.006 2.013 1.006
|
— — —
|
— 2.014 —
|
— — —
|
— — —
|
— — —
|
— — —
|
— — —
|
— — —
|
M1 Series 48-port, 10/100/1000 Ethernet I/O module with XL (N7K-M148GT-11L)
|
|
| |
Power Manager IO Forwarding Engine
|
All All V01-V03 V04+
|
N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1
|
5.006 2.014 1.006 N/A2
|
— — — N/A2
|
— — — N/A2
|
— — — N/A2
|
— — — N/A2
|
— — — 2.005
|
M1 Series 32-port, 10-Gigabit Ethernet I/O module (N7K-M132XP-12)
|
|
| |
Power Manager IO LinkSec Engine FE Bridge Forwarding Engine
|
All All All All All
|
4.008 1.015 2.006 186.005 1.006
|
— — — — —
|
— 1.016 — 186.006 —
|
— — — — —
|
— — 2.007 186.008 —
|
— — — — —
|
— — — — —
|
— — — — —
|
— — — — —
|
M1 Series 32-port, 10-Gigabit Ethernet I/O module with XL (N7K-M132XP-12L)
|
|
| |
Power Manager IO LinkSec Engine FE Bridge Forwarding Engine
|
All All All All V01-V03 V04+
|
N/A1 N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1 N/A1
|
4.008 1.016 2.006 186.006 1.006 N/A2
|
— — — — — N/A2
|
— — 2.007 186.008 — N/A2
|
— — — — — N/A2
|
— — — — — N/A2
|
— — — — — N/A2
|
— — — — — 2.005
|
M1 Series 8-port, 10-Gigabit Ethernet I/O module with XL (N7K-M108X2-12L)
|
|
|
|
|
| |
Power Manager IO CDL FPGA Forwarding Engine
|
All All All V01-V05 V06+
|
4.008 2.006 2.004 1.006 N/A2
|
— — — — N/A2
|
— 2.007 — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — N/A2
|
— — — — 2.005
|
M2 Series 24-port, 10-Gigabit Ethernet I/O module with XL (N7K-M224XP-23L)
|
|
|
|
|
|
|
| |
Power Manager IO SFP Forwarding Engine
|
All All All V01-V02 V03+
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
1.006 1.003 1.002 1.006 N/A2
|
— — — — N/A2
|
— — — — 2.005
|
M2 Series 6-port, 40-Gigabit Ethernet I/O module with XL (N7K-M206FQ-23L)
|
|
|
|
|
|
|
| |
Power Manager IO SFP Forwarding Engine
|
All All All V01-V02 V03+
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
1.006 0.011 2.008 1.006 N/A2
|
— — — — N/A2
|
— — — — 2.005
|
M2 Series 2-port, 100-Gigabit Ethernet I/O module with XL (N7K-M202CF-22L)
|
|
|
|
|
|
|
| |
Power Manager IO SFP Forwarding Engine
|
All All All V01-V02 V03+
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
N/A1 N/A1 N/A1 N/A1 N/A1
|
1.006 0.009 0.004 1.006 N/A2
|
— — — — N/A2
|
1.007 — — — 2.005
|
Fabric-1 module (Cisco Nexus 7010) (N7K-C7010-FAB1)
|
|
|
|
|
| |
Power Manager
|
All
|
2.010
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
Fabric-1 module (Cisco Nexus 7018) (N7K-C7018-FAB1)
|
|
|
|
|
| |
Power Manager
|
All
|
1.003
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
Fabric-2 module (Cisco Nexus 7009) (N7K-C7009-FAB2)
|
|
|
|
|
| |
Power Manager
|
All
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
1.003
|
—
|
—
|
—
|
—
|
Fabric-2 module (Cisco Nexus 7010) (N7K-C7010-FAB2)
|
|
|
|
|
| |
Power Manager
|
All
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
0.006
|
0.007
|
—
|
—
|
Fabric-2 module (Cisco Nexus 7018) (N7K-C7018-FAB2)
|
|
|
|
|
| |
Power Manager
|
All
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
0.006
|
0.007
|
—
|
—
|
Fan (Cisco Nexus 7004)
|
|
|
|
|
|
|
|
|
|
|
| |
Fan Controller
|
All
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
0.005
|
—
|
Fan (Cisco Nexus 7009)
|
|
|
|
|
|
|
|
|
|
|
| |
Fan Controller
|
All
|
N/A1
|
N/A1
|
N/A1
|
N/A1
|
0.007
|
—
|
0.009
|
—
|
—
|
Fan (Cisco Nexus 7010)
|
|
|
|
|
|
|
|
|
|
|
| |
Fan Controller
|
All
|
0.007
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
Fan (Cisco Nexus 7018)
|
|
|
|
|
|
|
|
|
|
|
| |
Fan Controller
|
All
|
0.002
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|
—
|

Note
To list the EPLDs running on your switch, use the show version module module_number epld command. If any of the versions that you list are older than what is listed in Table 8-9, we recommend that you update the EPLDs.
Determining Whether to Upgrade EPLDs
As shown in Table 8-10, you can use various show commands to determine whether the EPLDs can be upgraded for all the modules or for specific modules on a switch. These commands indicate the current EPLD images, new EPLD images, and whether the upgrades would be disruptive to switch operations.
Table 8-10 Displaying the EPLD Upgrade Status for the Switch and its Modules
Modules to Verify EPLD Status
|
Command
|
All modules on the switch
|
show install all impact epld bootflash:filename
|
I/O and supervisor modules
|
show install module slot_number impact epld bootflash:filename
|
Fabric modules
|
show install xbar-module slot_number impact epld bootflash:filename
|
Fan-tray modules
|
show install fan-module slot_number impact epld bootflash:filename
|
If there are different EPLD images to use depending on the version ID (VID) of a hardware module (see Table 8-9), then you must determine the version number of the module by using the show sprom module number command as shown in Example 8-12.
Example 8-12 Determining the Version Number of a Supervisor or I/O Module
switch# show sprom module 8 1
DISPLAY linecard sprom contents of module 8:
snmpOID : 9.12.3.1.9.66.5.0
VID : V01 <------Version ID
Downloading the EPLD Images
Before you can prepare the EPLD images for installation, you must download them to the FTP or management server.
To download the EPLD images, follow these steps:
Step 1
From a browser, go to the following URL:
http://www.cisco.com
The browser will display the Cisco website.
Step 2
From the Products & Services tab, choose Switches.
The Switches page opens.
Step 3
In the Data Center area, click the arrow next to View Products.
The page lists the Data Center products.
Step 4
Click Nexus 7000.
The Cisco Nexus 7000 Series Switches page opens.
Step 5
In the Support area, click Download Software.
The Downloads page opens and lists the Data Center switches.
Step 6
Choose a Cisco Nexus 7000 Series switch from the list under Data Center Switches > Cisco Nexus 7000 Series Switches.
The Log In page opens.
Step 7
If you are an existing user, enter your username in the User Name field and your password in the Password field. If you are a new user, click Register Now and provide the required information before returning to the Log In page and logging in with your new username.
The Downloads page lists the software types that can be downloaded for the switch that you specified.
Step 8
Click NX-OS EPLD Updates.
The Downloads page lists software releases that you can download.
Step 9
Choose Latest Releases > 6.1(3).
The Downloads page displays image information, including a link to the downloadable Tar file, to the right of the releases.
Note
For Releases 6.1(1) or 6.1(2), you must download EPLD image files for 6.1(1a) or 6.1(2a).
Step 10
Click the link for the Tar file.
The Downloads page displays a Download button and lists information for the Tar file.
Step 11
Click Download.
The Supporting Documents page opens to display the rules for downloading the software.
Step 12
Read the rules and click Agree.
A File Download dialog box opens to ask if you want to open or save the images file.
Step 13
Click Save.
The Save As dialog box appears.
Step 14
Indicate where to save the Tar file and click Save.
The Tar file saves to the location that you specified.
You are ready to prepare the EPLD images for Installation (see the "Preparing the EPLD Images for Installation" section).
EPLD Images Needed for vPCs
The virtual port channel (vPC) feature is available beginning with Cisco NX-OS Release 4.1(3). When you enable vPC on the chassis, you must have EPLD image 186.3 (or later image) on the 32-port 10-Gigabit Ethernet types of I/O modules (N7K-M132XP-12 and N7K-M132XP-12L).
Note
The EPLD upgrade operation is a disruptive operation. You should execute this operation only at a programmed maintenance time. The system/kickstart ISSU upgrade is a nondisruptive upgrade.
Most of the N7K-M132XP-12 modules in the chassis already meet this minimum EPLD requirement, but if you are working with an N7K-M132XP-12 module that was shipped before June 2008, you might need to upgrade the EPLD version.
To determine the EPLD version for all N7K-M132XP-12 modules, enter the show version module slot_number epld command. If the line FE Bridge(x) version displays a version earlier than 186.7, you should schedule an EPLD upgrade to a version that is compatible with the target Cisco NX-OS release. For example, if you want to run Cisco NX-OS Release 6.1(1), you should choose Release 6.1(1) EPLDs.
The following example shows Release 186.008 on the FE Bridge line, which is the correct EPLD version:
Nexus-7k(config)# show version module 7 epld
EPLD Device Version
-----------------------------------------
Power Manager 4.008
IO 1.016
Forwarding Engine 1.006
FE Bridge(1) 186.008 << OK!
FE Bridge(2) 186.008 << OK!
Linksec Engine(1) 2.007
Linksec Engine(2) 2.007
Linksec Engine(3) 2.007
Linksec Engine(4) 2.007
Linksec Engine(5) 2.007
Linksec Engine(6) 2.007
Linksec Engine(7) 2.007
Linksec Engine(8) 2.007
EPLD Images Needed for LISP
The Locator/ID Separator Protocol ( LISP) feature is available beginning with Cisco NX-OS Release 5.2(1). When you enable LISP on the chassis, you must have EPLD image 186.8 or 186.008 (or later image) on the 32-port 10-Gigabit Ethernet types of I/O modules (N7K-M132XP-12 and N7K-M132XP-12L).
Note
The EPLD upgrade operation is a disruptive operation. You should execute this operation only at a programmed maintenance time. The system/kickstart ISSU upgrade is a nondisruptive upgrade.
If you are working with an N7K-M132XP-12 module that was shipped before July 2011, you might need to upgrade the EPLD version.
To determine the EPLD version for all N7K-M132XP-12 and N7K-M132XP-12L modules, enter the show version module slot_number epld. If the line FE Bridge(x) version displays a version earlier than 186.8 or 186.008, you should schedule an EPLD upgrade to a version that is compatible with the target Cisco NX-OS release. For example, if you want to run Cisco NX-OS Release 5.2(1), you should choose Release 5.2(1) EPLDs.
The following example shows Release 186.008 on the FE Bridge line, which is the correct EPLD version:
Nexus-7k(config)# show version module 7 epld
EPLD Device Version
-----------------------------------------
Power Manager 4.008
IO 1.016
Forwarding Engine 1.006
FE Bridge(1) 186.008 << OK!
FE Bridge(2) 186.008 << OK!
Linksec Engine(1) 2.007
Linksec Engine(2) 2.007
Linksec Engine(3) 2.007
Linksec Engine(4) 2.007
Linksec Engine(5) 2.007
Linksec Engine(6) 2.007
Linksec Engine(7) 2.007
Linksec Engine(8) 2.007
Installation Guidelines
You can upgrade (or downgrade) EPLDs using CLI commands on the Cisco Nexus 7000 Series switch. Follow these guidelines when you upgrade or downgrade EPLDs:
•
Before you upgrade any EPLD images, be sure that you have updated the Cisco NX-OS operating system to the level required for the images and be sure that you have one of the following EPLD image files:
–
n7000-s1-kickstart.6.1.3.bin (for switches with Supervisor 1 modules)
–
n7000-s2-kickstart.6.1.3.bin (for switches with Supervisor 2 or Supervisor 2E modules)
•
You can execute an upgrade from the active supervisor module only. All the modules, including the active supervisor module, can be updated individually.
•
You can individually update each module whether it is online or offline as follows:
–
If you upgrade EPLD images on an online module, only the EPLD images with version numbers that differ from the new EPLD images are upgraded.
–
If you upgrade EPLD images on an offline module, all of the EPLD images are upgraded.
•
On a system that has two supervisor modules, upgrade the EPLDs for the standby supervisor and then switch the active supervisor to the standby mode to upgrade its EPLDs (the supervisor switchover is not disruptive to traffic on Cisco Nexus 7000 Series switches). On a switch that has only one supervisor module, you can upgrade the active supervisor, but this will disrupt its operations during the upgrade.
•
If you interrupt an upgrade, you must upgrade the module that is being upgraded again.
•
The upgrade process disrupts traffic on the targeted module.
•
Do not insert or remove any modules while an EPLD upgrade is in progress.
Preparing the EPLD Images for Installation
Before you can update the EPLD images for each of your switch modules, you must determine the Cisco NX-OS version that your switch is using, make sure that there is space for the new EPLD images, and download the images.
To prepare the EPLD images for installation, follow these steps:
Step 1
Log in to the switch through the console port, an SSH session, or a Telnet session.
Step 2
Verify that the switch is using the expected version of the Cisco NX-OS operating system. The kickstart and system lines indicate the Cisco NX-OS version. This step determines the versions of EPLD images that you must download.
kickstart: version 6.1(3)
BIOS compile time: 06/09/12
kickstart image file is: bootflash:/n7000-s2-kickstart.6.1.3.bin
kickstart compile time: 12/25/2020 12:00:00 [12/07/2012 18:37:07]
system image file is: bootflash:/n7000-s2-dk9.6.1.3.bin
system compile time: 10/31/2012 13:00:00 [12/08/2012 19:21:22]
Step 3
Verify that you have 120 MB of free space on the active or standby supervisor memory devices for the EPLD images that you will be downloading by using the dir bootflash: or dir slot0: commands.
By default, these commands display the used and free memory for the active supervisor. If your switch has an additional supervisor (a standby supervisor), use the show module command to find the module number for the other supervisor, use the attach module command to attach to the module number, and then use the dir bootflash: or dir slot0: command to determine the amount of used and free memory. See Example 8-13 to determine the amount of available bootflash memory, and see Example 8-14 to determine the amount of available slot0 memory.
Example 8-13 Determining the Amount of Available Bootflash Memory
4096 Dec 11 01:19:53 2012 lost+found/
3020665 Oct 08 07:47:36 2012 n7000-s1-debug-sh-bash.6.1.2.gbin
207429135 Oct 08 07:35:03 2012 n7000-s1-dk9.6.1.2.gbin
207558132 Dec 11 07:11:31 2012 n7000-s2-dk9.6.1.3.gbin
29479424 Oct 08 12:03:47 2012 n7000-s2-kickstart.6.1.2.gbin
29467136 Dec 11 10:35:18 2012 n7000-s2-kickstart.6.1.3.gbin
Usage for bootflash://sup-local
Mod Ports Module-Type Model Status
--- ----- -------------------------------- ------------------ ------------
6 8 10 Gbps Ethernet XL Module N7K-M108X2-12L ok
7 48 1/10 Gbps Ethernet Modul N7K-F248XP-24 ok
8 48 1000 Mbps Optical Ethernet XL Mo N7K-M148GS-11L ok
9 0 Supervisor module-1X N7K-SUP1 ha-standby
10 0 Supervisor module-1X N7K-SUP1 active *
Attaching to module 9 ...
To exit type 'exit', to abort type '$.'
Cisco Nexus Operating System (NX-OS) Software
TAC support: http://www.cisco.com/tac
Copyright (c) 2002-2012, Cisco Systems, Inc. All rights reserved.
The copyrights to certain works contained in this software are
owned by other third parties and used and distributed under
license. Certain components of this software are licensed under
the GNU General Public License (GPL) version 2.0 or the GNU
Lesser General Public License (LGPL) Version 2.1. A copy of each
such license is available at
http://www.opensource.org/licenses/gpl-2.0.php and
http://www.opensource.org/licenses/lgpl-2.1.php
Example 8-14 Determining the Amount of Available Slot0 Memory
Usage for slot0://sup-local
Mod Ports Module-Type Model Status
--- ----- -------------------------------- ------------------ ------------
2 48 10/100/1000 Mbps Ethernet Module N7K-M148GT-11 ok
3 48 10/100/1000 Mbps Ethernet Module N7K-M148GT-11 ok
4 48 10/100/1000 Mbps Ethernet Module N7K-M148GT-11 ok
5 0 Supervisor module-1X N7K-SUP1 ha-standby
6 0 Supervisor module-1X N7K-SUP1 active *
7 48 1/10 Gbps Ethernet Modul N7K-F248XP-24 ok
9 48 1000 Mbps Optical Ethernet Modul N7K-M148GS-11 ok
switch(standby)# dir slot0://sup-standby/
Usage for slot0://sup-standby
Step 4
If there is not at least 120 MB of memory free for the EPLD files, delete some unneeded files, such as earlier images, so there is enough free memory.
switch# delete bootflash:n7000-s1-kickstart.5.2.0.bin
Step 5
Copy the EPLD image file from the FTP or management server to the bootflash or slot0 memory in the active supervisor module. The following example shows how to copy from the FTP server to the bootflash memory:
switch# copy ftp://10.1.7.2/n7000-s1-epld.6.1.2a.img bootflash:n7000-s1-epld.6.1.3.img
Note
For NX-OS Release 6.1(1) , you must copy the n7000-s1-epld.6.1.1a.img (for supervisor 1 modules) or n7000-s2-epld.6.1.1a.img (for supervisor 2 modules) files. For NX-OS Release 6.1(2), you must copy the n7000-s1-epld.6.1.2a.img (for supervisor 1 modules) or n7000-s1-epld.6.1.2a.img (for supervisor 2 modules) files.
Step 6
Copy the EPLD image to the standby supervisor.
switch# copy bootflash:n7000-s1-epld.6.1.3.img
bootflash://sup-standby/n7000-s1-epld.6.1.3.img
You are ready to upgrade the EPLD images (see the "Upgrading the EPLD Images" section).
Upgrading the EPLD Images
You can upgrade the EPLD images for all of the modules installed in your switch or specific modules installed in your switch. When you request an upgrade, the Cisco NX-OS software lists the current and new versions for each EPLD image with the following results:
•
If a module is installed and online, the software lists the installed and new versions for each EPLD. Where there is a difference in versions, the software indicates an upgrade or downgrade to occur when you confirm the process.
•
If a module is installed and offline, the software cannot list its current EPLD versions so all EPLDs will be updated when you confirm the upgrade.
•
If a module is not installed, the software displays an error message and does not upgrade the EPLDs.
If you need to know which modules can be updated and which upgrades are disruptive to switch operations, see the "Determining Whether to Upgrade EPLDs" section.
To upgrade the EPLD images for a Cisco Nexus 7000 Series switch, you use one of the install commands listed in Table 8-11. These commands enable you to upgrade the EPLD images for all of the modules on the switch, multiple modules of one or two types, or single modules. When specifying a slot_number, use one number. When specifying slot_numbers, you can specify all for all slots, multiple slots separated by commas (x,y,z) or a range of slot numbers (x-y).
Table 8-11 EPLD Upgrade Commands
Modules Upgraded
|
Command
|
All installed modules with one module upgraded at a time
|
install all epld epld_image
|
All installed modules with the I/O modules upgraded in parallel
|
install all epld epld_image parallel
|
One or more I/O and supervisor modules with the I/O modules upgraded in parallel
|
install all epld epld_image parallel module {all | slot_numbers}
|
One or more I/O and supervisor modules with the I/O modules upgraded in parallel and one or more fan-tray modules
|
install all epld epld_image parallel module {all | slot_numbers} fan-module {all | slot_numbers}
|
One or more I/O and supervisor modules with the I/O modules upgraded in parallel and one or more fabric (xbar) modules
|
install all epld epld_image parallel module {all | slot_numbers} xbar-module {all | slot_numbers}
|
One or more fan-tray modules and one or more fabric (xbar) modules
|
install all epld epld_image parallel fan-module {all | slot_numbers} xbar-module {all | slot_numbers}
|
One I/O or supervisor module
|
install module slot_number epld epld_image
|
One fan module
|
install fan-module slot_number epld epld_image
|
One fabric module
|
install xbar-module slot_number epld epld_image
|
When you upgrade both supervisor modules in a switch, Cisco NX-OS upgrades the EPLD images for the standby supervisor module and then upgrades the active supervisor module. This action enables the upgrade of supervisor modules to be nondisruptive to switch operations.
Note
When upgrading EPLD images for Supervisor 2 or Supervisor 2E modules in a two-supervisor switch, the standby supervisor will reset twice towards the end of that upgrade but the upgrade continues to completion and the console displays the upgrade status.
When you upgrade supervisor module in a single-supervisor switch, the operation is disruptive to switch operations if the switch is active.
To start the installation of all new EPLD images for all modules in a switch, use the install all epld command as shown in either Example 8-15 (switches with Supervisor 1 modules) or Example 8-16 (switches with Supervisor 2 or Supervisor 2E modules).
Example 8-15 Installing EPLD Images in Parallel for Switches with Supervisor 1 Modules
switch#install all epld bootflash:n7000-s1-epld.6.1.3.img parallel
Example 8-16 Installing EPLD Images in Parallel for Switches with Supervisor 2 or Supervisor 2E Modules
switch#install all epld bootflash:n7000-s2-epld.6.1.3.img parallel
Example 8-17 shows how to start the installation of all new EPLD images for all of the I/O and supervisor modules and the fan-tray module in fan-tray slot 1 (in this case for a switch with Supervisor 1 modules).
Example 8-17 Installing Supervisor and I/O Modules Plus Other Specific Modules (for Switches with Supervisor 1 Modules)
switch#install all epld bootflash:n7000-s1-epld.6.1.3.img parallel module all fan-module 1
For Releases 6.1(1) and 6.1(2), if there are any powered down M2 Series I/O modules, use the no poweroff module command to power up that module.
switch# no poweroff module slot_number
For Release 4.0(2) or earlier releases, if you updated the power management EPLD image, you must reset the power for the module so that EPLD can take effect (this action is not required for Release 4.0(3) or later releases). You can reset the power in one of the following two ways:
•
To reset the power for the module, physically remove the module and reinstall it.
Note
A module reload or just pressing the ejector buttons on the module is not sufficient for this reset requirement.
•
To reset the entire switch, power cycle the switch.
Caution 
Resetting the power disrupts any data traffic going through the affected modules. If you power cycle the entire switch, all data traffic going through the switch at the time of the power cycling is disrupted. This is not necessary for Release 4.0(3) or later releases.
Note
For Release 4.0(3) and later releases, the switch automatically loads the new power management EPLD after an upgrade, so it is no longer necessary to reset the power for the module or switch.
To confirm the EPLD upgrades, see the "Verifying the EPLD Upgrades" section.
Verifying the EPLD Upgrades
You can verify the EPLD upgrades for each slot in the switch by using the commands listed in Table 8-12.
Table 8-12 Commands Used to Display EPLD Information for Modules
Command
|
Modules Verified
|
show version module slot_number epld
|
I/O and supervisor modules
|
show version fan slot_number epld
|
Fan-tray modules
|
show version xbar slot_number epld
|
Fabric modules
|
This example shows how to verify the EPLD images for the Cisco Nexus 7018 supervisor module in slot 9:
switch# show version module 9 epld
This example shows how to verify the EPLD images for the fan-tray module in fan-tray module slot 2:
switch# show version fan 2 epld
This example shows how to verify the EPLD images for the fabric module in fabric module slot 4:
switch# show version xbar 4 epld
Displaying the Available EPLD Versions
To view the available EPLD versions, use the show version epld url command as shown in Example 8-18.
Example 8-18 Displaying the Available EPLD Versions
switch# show version epld bootflash:n7000-s1-epld.6.1.3.img
Module Type EPLD Device Version
-----------------------------------------------------------------
Supervisor-1X Power Manager 3.009
Supervisor-1X IO 3.029
Supervisor-1X Inband 1.008
Supervisor-1X Local Bus CPLD 3.000
Supervisor-1X CMP CPLD 6.000
...
10/100/1000 Mbps Eth Module Power Manager 5.006
10/100/1000 Mbps Eth Module IO 2.014
10/100/1000 Mbps Eth Module Forwarding Engine 1.006
10 Gbps Ethernet Module Power Manager 4.008
10 Gbps Ethernet Module IO 1.016
10 Gbps Ethernet Module Forwarding Engine 1.006
10 Gbps Ethernet Module FE Bridge 186.008
10 Gbps Ethernet Module Linksec Engine 2.007
1000 Mbps Optical Ethernet Module Power Manager 4.008
1000 Mbps Optical Ethernet Module IO 1.006
1000 Mbps Optical Ethernet Module Forwarding Engine 1.006
1000 Mbps Optical Ethernet Module SFP 1.004
...
Fabric Module 2 Power Manager 1.003
Fabric Module 2 Power Manager 1.003
...
Fan<Cisco Nexus 7009> Fan Controller 0.009
Fan<Cisco Nexus 7009> Fan Controller 0.009
Displaying the Status of EPLD Upgrades
To display the status of EPLD upgrades on the switch, use the show install epld status command as shown in Example 8-19.
Example 8-19 Displaying EPLD Upgrades
switch# show install epld status
1) Xbar Module 4 upgraded on Wed Oct 26 16:36:27 2011 (524778 us)
Status: EPLD Upgrade was Successful
------------------------------------------------------
Power Manager 1.003 1.003
2) Module 14 upgraded on Mon May 23 19:45:55 2011 (835895 us)
Status: EPLD Upgrade was Successful
Default Settings
Table 8-13 lists the default hardware settings.
Table 8-13 Default Hardware Parameters
Parameters
|
Default
|
Power supply mode
|
Power supply redundancy mode
|
bv