Table Of Contents
Numerics - A - B - C - D - E - F - G - H - I - K - L - M - N - O - P - R - S - T - U - V - W -
Index
Numerics
4-post hardware kit
rack-mount 4-3
4-post rack, mounting appliance on 4-2
A
acs deployment 1-1
adapter cards
troubleshooting A-4
airflow
guidelines 3-8
altitude
guidelines C-4
B
back panel 2-5, 4-7
LEDs 2-6
C
cable
connecting 4-7
management 4-11
troubleshooting A-4
checking
LEDs 4-13
checklist, installation 3-13
checklist, power up 4-12
configuration
site 3-8
connecting
cables 4-7
network interface 4-8
connections
troubleshooting A-4
considerations
power 3-9
console port, pinouts
serial 4-10
cooling system
troubleshooting A-3
corrosion
preventing damage C-2
CPI tool
identification 2-3, A-7
CSACS 1121 Series appliance
front view 2-4
D
dust
preventing damage C-4
E
electricity
safety with 3-3
electromagnetic interference
See EMI
electrostatic discharge 3-5
See ESD
EMI
preventing effects of C-4
environment
maintaining C-1
site 3-7
environmental
features A-3
specifications (table) 3-9
equipment
racks
rack-mounting 3-8
safety with 3-3
ESD
preventing damage C-4
preventing effects of 3-5, C-4
F
features
environmental reporting A-3
front panel
LEDs 2-4
troubleshooting A-5
front view
CSACS 1121 Series appliance 2-4
G
grounding (warning) 4-12
guidelines
airflow 3-8
lifting 3-5
rack installation 3-6
rack-mounting configuration 4-1
safety 3-1
temperature maintenance C-3
H
hardware
troubleshooting procedures A-1
humidity
maintenance guidelines C-4
I
identification
CPI 2-3, A-7
information packet and warranty 3-11
installation
checklist 3-13
verification 5-4
installing ACS server
setup program 5-2
post-installation tasks 8-1
K
kit
mounting 4-2
rack-mount hardware (table) 4-3
L
LEDs
back panel 2-6
checking 4-13
front panel 2-4
lifting guidelines 3-5
location
serial number 2-3, A-7
log, site 3-14, B-1
M
magnetism
preventing effects of C-5
maintenance C-1
temperature C-3
management
cable 4-11
method of procedures
See MOP
MOP 3-5, 3-10
N
network interface
connecting 4-8
NIC
LEDs
troubleshooting A-6
NIC 1 and NIC 2
RJ-45 pinout 4-9
O
overview
product 2-1
P
planning
site 3-6
post-installation tasks 8-1
power
considerations 3-9
power lines (warning) 3-3
power source interruptions
preventing damage from C-5
power supplies (warning) 3-3
power supply (warning) 3-3, 4-12
power system
troubleshooting A-3
power up
procedure 4-12
precautions
general precautions 3-2
problem solving
See troubleshooting
procedure
method of 3-10
power up 4-12
product
overview 2-1
R
rack
enclosed (do not use) 3-7
four-post (open) 3-7
rack, mounting on 4-post 4-2
rack installation
guidelines 3-6
rack-mount
4-post hardware kit 4-3
rack-mounting configuration
guidelines 4-1
radio frequency interference. See RFI
regulatory compliance 2-7
removing
CSACS 1121 Series appliance 4-15
restricted access (warning) 3-3, 3-6, 4-1
RFI
preventing effects of C-4
RJ-45 pinout
NIC 1 and NIC 2 4-9
S
safety
guidelines 3-1
SELV circuits (warning) 3-3
serial
console port, pinouts 4-10
serial number
location 2-3, A-7
site
configuration 3-8
environment 3-7
maintenance factors C-1
log 3-14, B-1
planning 3-6
requirement, MOPs 3-10
site log B-1
T
temperature
maintenance guidelines C-3
temperature and humidity guidelines 3-8
tools and equipment
required 3-12
trained and qualified (warning) 4-1
troubleshooting
adapter cards A-4
cables A-4
connections A-4
cooling system A-3
Ethernet LEDs A-6
front panel LEDs A-5
power system A-3
U
unpacking
checking shipment 3-10
upgrading
acs deployment 7-2
acs Monitoring and Report Viewer 7-9
acs server 7-10
post-installation tasks 8-1
V
VMWare
configuring 6-4
hardware requirements 6-1
installing 6-1
installing ACS server 6-8
W
warranty 3-11