Scheduled Tasks and History table
|
Status
|
Provides
information about the migrate task:
-
Successful—Indicates that the task has finished without errors
-
Running—Indicates that the task is currently running
-
Scheduled—Indicates that the task has not yet started
-
Canceled—Indicates that the user has chosen not to run task
-
Paused—Indicates that the task is in a paused state waiting for
feedback
-
Paused due To Error—Indicates that the task is in a paused state due to an
error in the system
-
Failed—Indicates that the task has stopped due to error
|
Start
Time
|
Specifies the start time of the migrate task
|
Last
Status Report Time
|
Specifies the time at which the action was completed. The
completed action may be a success or failure.
|
Cluster
|
Specifies the cluster being migrated.
|
Notes
|
Notes
that were added during the Review portion of the Add Migration Task wizard
|
Actions
|
The
following are the status and the corresponding actions:
-
Scheduled status:
-
Run Validation Test—Runs a validation test to ensure that all
nodes are available and that none of the specified new addresses are reachable.
It also checks that the ESXi hosts that the VMs reside on are mounted. It also
verifies that the iso file to be used is present.
-
Edit—Shows the Edit Upgrade Task window. Allows you to edit the selected task
-
Cancel Task—Cancels the selected task
-
Delete—Deletes the selected task permanently
-
Canceled status:
-
Started status:
-
Paused status:
-
Resume—Restarts task at the next step.
-
View Details—Navigates to the monitoring page showing all the
tasks available
-
Start Task—Start task is present if the task is started manually. Time is not
selected for this action
Note
|
Start Task is applicable only if you select
Start task manually option in the
Set Start Time panel.
When you select the task manually, the resume option is
unavailable in the monitoring page.
|
-
Cancel Task—Cancels the selected task
-
Paused due to Error:
-
Retry—Retry the last failed step. This button causes the task to
retry the last step that failed, and restart the task.
-
Resume—Resumes the task at the next step. Use this option only
if the failed step is non-essential, or if you have manually performed that
step.
-
View Details—Navigates to the monitoring page showing all the
tasks available
-
Cancel Task—Cancels the selected task
-
Successful status:
-
Failed status:
|
Show
|
Allows
you to filter migration tasks by status, by selecting one of the following
options from the drop-down list:
-
Quick Filter—To filter the tasks based on the status
-
All—To show all the tasks available
-
Scheduled—To show the tasks that are scheduled
-
Canceled—To show the tasks that are canceled
-
Running—To show the tasks that are started
-
Paused—To show the tasks that are paused
-
Paused due To Error—To show the tasks that are paused due to an error in the
system
-
Successful—To show the tasks that are successful
-
Failed—To show the tasks that failed
|
Filter
|
Select a status and click Filter to set a search rule at the bottom of the
search window.
|
Delete
|
Check
the check box next to the task and click the Delete button at the top of the
table. You can also click Delete under the Actions column for the task you wish
to delete.
|
Add
Migration Task button
|
Opens
the Add Migration Task wizard.
Note
|
You can also open the Add Migration Task wizard by selecting
Edit in the Actions column for a particular migrate task.
|
|
Add
Migration Task window
For
information about how to add a migration task, see
"Add
Migration Task".
|
Choose
Source and Destination Clusters page
|
From
the Choose Source and Destination Clusters page, select the source UC cluster
from the drop-down list. After you select the source cluster, you select the
destination cluster from the drop-down list and the nodes from the Node Mapping
from Source to Destination Cluster table.
|
Choose
Upgrade Files page
|
From
the Choose Upgrade File page, select the upgrade file for each product being
upgraded. You will only have the option of selecting files for the product type
you selected on the Choose Cluster page.
|
Set
Start Time page
|
From
the Set Start Time page, select a start time for the task.
Note
|
The time specified is based on the Cisco Prime Collaboration
Deployment server time, not the time zone of the selected cluster.
|
You
have the option of setting the start time for a specific time, starting the
task manually, or setting the task to begin immediately upon completion of the
wizard.
|
Specify Migration Procedure page
|
From
the Specify Migration Procedure page, specify the sequence in which the
migration is processed on the servers. You can change the sequence of the
stepsby clicking the up and down arrows of a particular step. You can also add
or delete a step, or edit an existing step.
By
default, each node is sequenced into its own step. The Revert to Default button
returns the steps to this original state.
|
Review
page
|
The
Review page provides a summary of the options you have selected in the previous
steps. The nodes listed in the Nodes field are view-only; you cannot select
them.
You
can add notes to the Notes field for future reference.
|