Cisco TelePresence System TX9000 and TX9200 Assembly, First-Time Setup, and Field-Replaceable Unit Guide
Installing the Displays and Performing Final Leveling
Downloads: This chapterpdf (PDF - 1.08MB) The complete bookPDF (PDF - 27.61MB) | Feedback

Table of Contents

Installing the Displays and Performing Final Leveling of the Main Display Structure

Required Display Preinstallation Check

Assembly Note for Systems That Use a Free-Standing Light Reflector Wall

Installing the Displays

Installing the Displays and Performing Final Leveling of the Main Display Structure

Revised: April 10, 2014, OL-27038-01

This chapter describes the steps you perform to install the displays and includes the following sections:

Required Display Preinstallation Check

Before you install the displays, check their functionality by performing the tasks that are described in the “Checking the Function of the 65-Inch Display Prior to Installation” section. Failure to do so might result in installing a display that is not functional.

Assembly Note for Systems That Use a Free-Standing Light Reflector Wall

If your system uses a free-standing light reflector, partially build the wall by completing Step 1 through Step 7 in Chapter 6, “Installing the Free-Standing Reflector Wall Structure” before installing the displays. If you need to reposition the display structure, it is easier to do so before installing the displays.

Installing the Displays

To install the displays, complete the following steps.


Step 1 Prepare the displays for installation by completing the following steps:

a. Remove the handles from the rear of the display.

b. Remove the bracket from the rear of the display.

c. Attach the spool studs, washers, and spools to the display.


Caution Do not use the DVI cable that is provided with the display. Use the cable that are provided with the system. The part number is 37-1387-01 and they are in cable kits 1, 2, and 3 (69-2345-01, 69-2346-01, and 69-2347-01, respectively). Use the power cable that is included with the display.


Note Tighten the spools and the spool studs securely to the display. Hand tighten the spool (do not overtighten the spool).


 

Key
Part Description
Part Number
Qty
Ctn
Notes
1

65-inch high-definition display

CTS-DISP-65-GEN4

3

40, 41, 42

2

Spool stud

700-30916-01
Kit # 69-2066-01

12

1

Included with spool stud kit

3

M8 x 15.5 serrated washers

49-1251-01
Kit #69-2066-xx

12

1

Included with spool stud kit

4

Spool

700-30783-01
Kit # 69-2066-01

12

1

Included with spool stud kit

Figure 5-1 Attaching the Washers and Spool Studs

 

Step 2 Attach the displays to the display structures by completing the following steps:

a. Align the four spools on the back of the display to the mounting locations on the structure.

b. Place the spools through the openings in the structure.

The display then rests on the display support arm on the structure.


Caution Do not place your hand or fingers between the display and the display support arm when you lower the displays onto the structure.

c. Confirm that the spools are still tightly screwed onto the displays. If they are not, tighten them completely.

d. Ensure that there is approximately a 2mm (1/16 inch) gap between each display and, if required, adjust the displays to achieve that distance.

Figure 5-2 Mounting the Displays (1 of 2)

 

Figure 5-3 Mounting the Displays (2 of 2)—Detail of Installed Display From the Rear

 

Step 3 Attach the 12 bezel brackets to the displays by performing the following actions:

a. Take 12 of the 24 M5 x 10mm screws and attach the screws on the outside perimeter of the display. These screws are shown as callout 2a in Figure 5-4.


Note These screws might be pre-installed; if so, skip this step.


b. Place the bezel brackets over the screws through the keyhole slots.

c. Insert the remaining 12 inner screws into the display. These screws are shown as callout 2b in Figure 5-4.

d. Tighten the screws snugly.


Caution DO NOT OVERTIGHTEN THE SCREWS. Removal of these brackets is required if you need to service or replace the display after it is mounted.

 

Key
Part Description
Part Number
Qty
Ctn
Notes
1

Bezel bracket

700-37748-01
Kit #69-2318-xx

12

8

2

M5 x 10mm screw, hex

48-2058-01
Kit # 69-2360-xx

48

6

Figure 5-4 Installing the Bezel Brackets

 

Step 4 Perform final leveling of the display structure and tighten all connecting hardware.


Tip You cannot level the displays without leveling the entire system. Raise or lower the leveling feet on the bottom of the display structures to level the displays.