The documentation set for this product strives to use bias-free language. For the purposes of this documentation set, bias-free is defined as language that does not imply discrimination based on age, disability, gender, racial identity, ethnic identity, sexual orientation, socioeconomic status, and intersectionality. Exceptions may be present in the documentation due to language that is hardcoded in the user interfaces of the product software, language used based on RFP documentation, or language that is used by a referenced third-party product. Learn more about how Cisco is using Inclusive Language.
Numerics
10/100BASE-T
port LEDs 5-8
1000BASE-X
port and status LEDs (figure) 5-8
1000 W power supplies
AC power cords A-4
1300 W power supplies
AC power cords A-8
1400 W power supplies
AC power cords A-13
2800 W AC-input power supply LEDs A-26
2800 W power supplies
AC power cords A-27
4200 W AC-input power supplies
features A-28
4200 W AC-input power supply LEDs A-31
4200 W power supplies
AC power cords A-32
6000 W AC-input power supplies
features A-35
remote power cycling feature A-40
remote power cycling terminal block A-40
6000 W power supplies
AC power cords A-38
9000W AC-input power supplies
AC power cords supported A-47
combined mode operation A-46
features (figure) A-42
LED meanings A-45
platforms supported A-42
redundant mode power output A-46
remote power cycling feature A-49
specifications (table) A-43
A
AC-input power cords
1000 W power supply A-4
1300 W power supply A-8
1400 W power supply A-13
2800 W power supply A-27
4200 W power supply A-32
6000 W power supply A-38
AC-input power supplies
environmental monitoring A-51
figure 4-3
handling (figure) 4-6
installing 4-7
removing 4-5
replacing 4-7
source circuit requirements 2-12
troubleshooting 5-4
verifying operation 4-8
See also DC-input power supplies
airflow
Catalyst 4503-E switches (table) 1-5
Catalyst 4506-E switches (table) 1-9
Catalyst 4507R+E switches (table) 1-21
Catalyst 4507R-E switches (table) 1-13
Catalyst 4510R+E switches (table) 1-25
Catalyst 4510R-E switches (table) 1-17
B
boot process
troubleshooting 5-2
branch circuit requirements 2-12
C
cabling
requirements and guidelines 2-14
Catalyst 4503-E switches
chassis dimensions 1-5
fan trays 1-4
front view 1-2
power supplies 1-4
repacking B-1
supervisor engines 1-3
Catalyst 4506-E switches
attaching cable guides (figure) 3-7
chassis dimensions 1-9
fan trays 1-7
front view 1-6
installing in racks (figure) 3-6
power supplies 1-8
repacking B-1
supervisor engines 1-7
Catalyst 4507R+E switches
chassis dimensions 1-21
fan trays 1-20
power supplies 1-20
supervisor engines 1-19
Catalyst 4507R-E switches
chassis dimensions 1-13
description 1-10
fan trays 1-12
front view 1-10
power supplies 1-12
supervisor engines 1-11
Catalyst 4510R+E switches
chassis dimensions 1-25
fan trays 1-24
power supplies 1-24
supervisor engines 1-23
Catalyst 4510R-E switches
chassis dimensions 1-17
description 1-14
fan trays 1-16
front view 1-14
power supplies 1-16
supervisor engines 1-15
category 5e static electricity caution 2-6, 2-9, 2-14
category 6a static electricity caution 2-6, 2-9, 2-14
category 6 static electricity caution 2-6, 2-9, 2-14
chassis dimensions
See Catalyst 4503-E switches; Catalyst 4506-E switches;
See Catalyst 4506-E switches; Catalyst 4506-E switches;
See Catalyst 4507R+E switches; Catalyst 4507R+E switches;
See Catalyst 4507R-E switches; Catalyst 4507R-E switches;
See Catalyst 4510R+E switches; Catalyst 4510R+E switches;
See Catalyst 4510R-E switches; Catalyst 4510R-E switches;
components
connecting
terminals 3-10
to console port C-2
uplink ports 3-11
console port
connecting to C-2
conventions
warnings -ix
D
DC-input power supplies
connecting system ground 3-8
environmental monitoring A-51
handling (figure) 4-12
installing 4-12
removing 4-8
replacing 4-12
See also AC-input power supplies
troubleshooting 5-4
verifying operation 4-14
dimensions
Catalyst 4503-E switches (table) 1-5
Catalyst 4506-E switches (table) 1-9
Catalyst 4507R+E switches (table) 1-21
Catalyst 4507R-E switches (table) 1-13
Catalyst 4510R+E switches (table) 1-25
Catalyst 4510R-E switches (table) 1-17
disconnecting
ground connections (warning) 4-10
documentation
conventions -viii
E
environmental monitoring
power supplies A-51
ESD
guidelines 2-10
preventing 2-10
Ethernet management ports
LEDs 5-3
troubleshooting 5-3
F
FAIL LEDs
checking 4-8
verifying power supply status 4-14
fan assemblies
booting 5-2
installing 4-15
removing 4-14
troubleshooting 5-6
verifying installation 4-16
FAN OK LED
checking 4-8
field-replaceable units
Flash code
troubleshooting 5-3
FRUs
AC-input power supplies4-5to 4-8
DC-input power supplies4-8to 4-14
G
GOOD LEDs
checking 4-8
troubleshooting 5-4
verifying power supply status 4-14
grounding
connecting systems 3-8
ground wire
H
help
hot swapping
fan assemblies 4-14
humidity
Catalyst 4503-E switch specifications (table) 1-5
Catalyst 4506-E switch specifications (table) 1-9
Catalyst 4507R+E switch specifications (table) 1-21
Catalyst 4507R-E switch specifications (table) 1-13
Catalyst 4510R+E switch specifications (table) 1-25
I
installation
connecting to a power source C-2
starting the terminal-emulation software C-2
installing
AC-input power supplies4-5to 4-8
DC-input power supplies4-8to 4-14
installing switches in racks3-4to ??
L
LEDs
checking power supplies 5-3
checking supervisor engines 5-2
POST results C-3
See also specific types of LEDs
LINK LEDs (table) 5-8
M
O
OUTPUT FAIL LED
environmental monitoring A-51
P
packaging materials B-1
port status LEDs 5-9
POST
LEDs C-3
power cords
power requirements
branch circuit requirements 2-12
site preparation 2-12
UPS selection 2-12
power supplies
Catalyst 4503-E switches 1-4
Catalyst 4506-E switches 1-8
Catalyst 4507R+E switches 1-20
Catalyst 4507R-E switches 1-12
Catalyst 4510R+E switches 1-24
Catalyst 4510R-E switches 1-16
DC power cable leads color coding 2-13
LEDs 5-3
R
rack-mounting
switches 3-5
rack-mount kits
guidelines 3-2
remote power cycling feature
components (figure) A-40, A-49
switch settings and operation A-41, A-50
removing
AC-input power supplies 4-5
DC-input power supplies 4-8
repacking switches B-1
replacing
AC-input power supplies4-7to 4-8
DC-input power supplies4-12to 4-14
S
selecting a UPS 2-12
shipping instructions B-1
show system command 4-8
signaling and pinouts
terminal setup 3-10
site requirements
altitude 2-5
corrosion 2-5
dust and contamination 2-5
EMI 2-5
humidity 2-4
power interruptions 2-6
shock and vibration 2-6
startup
troubleshooting 5-3
supervisor engines
uplink ports 3-11
system ground
accessory kit 3-8
connecting 3-8
grounding lug 3-8
guidelines 2-8
tools required 3-8
T
TAC
contacting 5-18
temperature
Catalyst 4503-E switches 1-5
Catalyst 4506-E switches 1-9
Catalyst 4507R+E switches 1-21
Catalyst 4507R-E switches 1-13
Catalyst 4510R+E switches 1-25
Catalyst 4510R-E switches 1-17
terminal-emulation software C-2
troubleshooting 5-4
boot process 5-2
fan assemblies 5-6
power supplies 5-4
startup 5-3
U
uplink ports
connecting 3-11
V
voltage
specifications, DC-input power supply A-18
W
weight
Catalyst 4503-E switches (table) 1-5
Catalyst 4506-E switches (table) 1-9
Catalyst 4507R+E switches (table) 1-21
Catalyst 4507R-E switches (table) 1-13
Catalyst 4510R+E switches (table) 1-25
Catalyst 4510R-E switches (table) 1-17