Cisco CRS Carrier Routing System Multishelf System Interconnection and Cabling Guide
Index
Downloads: This chapterpdf (PDF - 361.0KB) The complete bookPDF (PDF - 3.2MB) | Feedback

Index

Table Of Contents

A - C - D - E - F - H - L - M - N - P - R - S - T - W -

Index

A

alarm module alarm-out cabling 2-2

auxiliary port, cabling 2-2

C

cable routing considerations

bend radius 1-9

environmental 1-7

length limitation 1-8

raised floor 1-8

space 1-7

tools required 1-7

weight 1-8

cables

cleaning 4-29

required for first-time install 1-7

cabling

2+1 multimodule installations A-1

control network planning 3-4, 3-6

fabric cable planning 4-8

fabric cabling procedure 4-24

general procedures 1-10

cautions, description of 2-vii

changes to this document 2-vi

chassis

power distribution 4-36

power failure 4-36

switch fabric failure 4-36

switch fabric operation 4-36

Cisco Catalyst 6509 Switch

connections to the multishelf system 3-4

cleaning cable connections 4-29

console port, cabling 2-1

control network

cabling overview 3-1

cabling planning 3-4, 3-6

CRS multishelf system

overview1-1to ??

D

dust cover on fabric cable 4-25

E

environmental considerations 1-7

F

fabric cables

bend radius 1-9

cabling procedure 4-24

connectivity rules 4-8, A-1

labels 4-15

length limitations 1-9

part numbers 4-7

planning cable routing 4-9

planning card placement 4-8

recommended plans B-1

fabric card chassis

AC power load zones, OIM side (figure) 4-34

AC power load zones, SFC side (figure) 4-33

DC power load zones, OIM side (figure) 4-36

DC power load zones, SFC side (figure) 4-35

fabric card placement 4-8

failures

power system 4-36

switch fabric 4-36

switch fabric, total 4-36

Figures

AC power load zones, OIM side 4-34

AC power load zones, SFC side 4-33

DC power load zones, OIM side 4-36

DC power load zones, SFC side 4-35

four-FCC multishelf system 1-4

H

high availability

S2 fabric card placement (table) 4-37, 4-38, 4-39

L

labels, fabric cables 4-15

M

management Ethernet port, cabling 2-2

multishelf system

description 1-1

four-FCC multishelf system 1-4

overview 1-1

single-FCC multishelf system 1-2

two-FCC multishelf system 1-3

multishelf system planning

high availability

switch fabric card placement 4-36

N

note, description of 2-vii

P

PLIM cabling, documentation 1-6

power system

failure 4-36

power distribution (load zones) 4-36

product ID

fabric cables 4-7

R

raised floor installations 1-8, 1-10

S

S2 switch fabric card

high-availability placement (table) 4-37, 4-38, 4-39

safety guidelines 1-11

single-FCC multishelf system 1-2

space considerations 1-7

switch fabric

failure operation 4-36

odd and even planes required 4-36

requirements for operation 4-36

total failure 4-36

T

Tables

S2 fabric card placement, high availability 4-37, 4-38, 4-39

tools required 1-7

turn collar, how to install 4-27

two-FCC multishelf system 1-3

W

Warnings

statement numbers 2-vii

translations 2-vii